HomeMy WebLinkAboutAttachment 6 - FY27 Capital Improvement PlanFY27 Five-Year CIP by Fund FY27 Proposed FY28 Proposed FY29 Proposed FY30 Proposed FY31 Proposed Five Year Total 210 General Plan Update 256009 Land Use Tracking & Permit Software 300,000 - - - - 300,000 210 Total 300,000 - - - - 300,000 263 Measure M2 - Traffice Improvement 255012 Streetlight Pole Replacement 30,000 30,000 30,000 30,000 30,000 150,000 255027 Local Roadway Safety Plan (LRSP) - 50,000 - - - 50,000 255072 Minor Traffic Control Devices 50,000 50,000 50,000 50,000 50,000 250,000 255094 Biennial Traffic Signal Coordinat 50,000 50,000 50,000 50,000 50,000 250,000 255701 Pavement Management Program Survey 70,000 - 70,000 - 70,000 210,000 255702 Pavement Management Program 3,000,000 3,000,000 3,100,000 3,100,000 3,200,000 15,400,000 263 Total 3,200,000 3,180,000 3,300,000 3,230,000 3,400,000 16,310,000 270 Gas Tax 255073 Traffic Signal Controller Changeout 125,000 125,000 125,000 125,000 125,000 625,000 255702 Pavement Management Program 150,000 150,000 150,000 150,000 150,000 750,000 270 Total 275,000 275,000 275,000 275,000 275,000 1,375,000 274 Road Maint Rehab (RMRA) 255702 Pavement Management Program 3,500,000 3,600,000 3,700,000 3,800,000 3,900,000 18,500,000 274 Total 3,500,000 3,600,000 3,700,000 3,800,000 3,900,000 18,500,000 287 Transportation System (TSIP) 255010 Chapman Grand Turn Mod 75,000 - 450,000 - - 525,000 255011 Chapman Cambridge Turn Mod 75,000 - 450,000 - - 525,000 255013 Glassell St Signal Network Ext - 100,000 - - - 100,000 255014 Katella Signal Network Extension 1,300,000 - - - - 1,300,000 255098 Batavia & Taft Signal Network Extension - 170,000 - - - 170,000 255701 Pavement Management Program Survey 40,000 60,000 40,000 60,000 40,000 240,000 265108 Katella & Batavia Signal Network Ext - - 150,000 - - 150,000 265109 Santiago Canyon Rd Signal Network Ext - - - 250,000 - 250,000 287 Total 1,490,000 330,000 1,090,000 310,000 40,000 3,260,000 310 Community Development Block Grant (CDBG) 275014 26-27 CDBG Project 566,082 - - - - 566,082 310 Total 566,082 - - - - 566,082 454 AB3229-COPS/State 255019 Police Facility Improvements 200,000 - - - - 200,000 454 Total 200,000 - - - - 200,000 500 Capital Projects 255012 Streetlight Pole Replacement 470,000 470,000 470,000 470,000 470,000 2,350,000 255071 Quiet Zone/Rr Xing Safety 50,000 52,500 55,000 57,500 60,000 275,000 255072 Minor Traffic Control Devices 200,000 200,000 200,000 200,000 200,000 1,000,000 255702 Pavement Management Program 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 10,000,000 263003 Fire Station 3 Building Addition 345,445 2,500,000 - - - 2,845,445 263004 Fire Station 5 Exercise Room Addition - 517,000 - - - 517,000 263005 Fire Station 2 Remodel - 1,140,000 11,151,800 - - 12,291,800 265001 Corporate Yard Renovations 670,000 - - - - 670,000 275005 Elevator Replacement - Police HQ & Corp Yard 260,000 - - - - 260,000 275006 Fleet Facilities - HVAC Installation & Interior Painting 575,000 - - - - 575,000 275012 Fleet Facilities - Corp Yard Roll-Up Replacement 270,000 - - - - 270,000 275132 Citywide Bicycle Lane Enhancements - - - 150,000 - 150,000 500 Total 4,840,445 6,879,500 13,876,800 2,877,500 2,730,000 31,204,245 510 Developer Impact Fees - Park 257018 El Modena Area Renovation 500,000 - - - - 500,000 267001 Park Restroom Interior Renovations 280,000 75,000 80,000 85,000 90,000 610,000 267002 Sports Court Resurfacing 60,000 65,000 70,000 80,000 85,000 360,000 267005 Rampart St. Park 250,000 - - - - 250,000 267018 El Modena Park Area Renovation - - - 2,500,000 - 2,500,000 267034 Parking Lot Pavement Rehabilitation 75,000 - - - - 75,000 267035 Veterans Park Memorial Fountain Restoration 50,000 - - - - 50,000 267036 Santiago Creek Trail - Lodge Pole Fencing Replacement 200,000 - - - - 200,000 1 Attachment 6 FY27 Five-Year CIP by Fund FY27 Proposed FY28 Proposed FY29 Proposed FY30 Proposed FY31 Proposed Five Year Total 510 Developer Impact Fees - Park cont. 267037 Playground Equipment Replacement 800,000 2,000,000 - - - 2,800,000 267038 El Camino Sports Court Resurfacing Project 155,000 - - - - 155,000 510 Total 2,370,000 2,140,000 150,000 2,665,000 175,000 7,500,000 550 Reimbursable Capital Projects 203970 Rev Private Dev-Parker St Devel - - 100,000 - - 100,000 255081 Well 29 2,500,000 - - - - 2,500,000 257011 New Park W Orange 850,000 - - - - 850,000 263003 Fire Station 3 Building Addition 1,000,000 - - - - 1,000,000 550 Total 4,350,000 - 100,000 - - 4,450,000 560 Developer Impact Fees - Fire 253051 Fire Station Maint & Renov 50,000 50,000 50,000 50,000 50,000 250,000 263001 Signal Pre-Emption Installation 50,000 50,000 50,000 50,000 50,000 250,000 263003 Fire Station 3 Building Addition 500,000 - - - - 500,000 560 Total 600,000 100,000 100,000 100,000 100,000 1,000,000 570 Developer Impact Fees - Police 255019 Police Facility Improvements 245,000 - - - - 245,000 275005 Elevator Replacement - Police HQ & Corp Yard 260,000 - - - - 260,000 275010 Police HQ - Vehicle Gate System Replacement 90,000 - - - - 90,000 570 Total 595,000 - - - - 595,000 580 Developer Impact Fees - Library 252107 Main Library Facility Improvement 326,906 21,000 - - - 347,906 580 Total 326,906 21,000 - - - 347,906 600 Water 255078 Well Rehabilitation 200,000 200,000 250,000 250,000 250,000 1,150,000 255079 Water Plant Telemetry 100,000 100,000 100,000 100,000 100,000 500,000 255080 Emergency Generator 300,000 - 300,000 - - 600,000 255081 Well 29 2,500,000 - - - - 2,500,000 255082 S Water Yard Storage Replacement - - - - 300,000 300,000 255083 Meter Replacement Program 550,000 550,000 600,000 600,000 600,000 2,900,000 255084 Exterior Cathodic Protection System 50,000 50,000 50,000 50,000 50,000 250,000 255085 Pipeline Renewal Projects 2,000,000 2,100,000 2,100,000 2,100,000 2,100,000 10,400,000 255096 Water Utility Security Improvements 300,000 35,000 35,000 35,000 35,000 440,000 255104 Reservoir 7 Hydropneumatic Tank Rep 400,000 1,000,000 - - - 1,400,000 265099 Reservoir Recoating - 1,400,000 - - - 1,400,000 265100 Reservoir 2A Site Remediation 50,000 50,000 50,000 50,000 50,000 250,000 265101 Lower Serrano Pump Station - 500,000 1,000,000 - - 1,500,000 265102 Reservoir 3A Construction - 400,000 1,800,000 - - 2,200,000 265103 Reservoir 4A Construction - - - 1,500,000 1,500,000 3,000,000 265104 Reservoir 5 Pump Station Replacement - - - 1,200,000 1,200,000 2,400,000 275011 Water Yard - North Yard Gate Replacement 120,000 - - - - 120,000 600 Total 6,570,000 6,385,000 6,285,000 5,885,000 6,185,000 31,310,000 601 Sewer 255003 Sewer Line Maintenance/Replacement 2,511,946 2,587,304 2,664,923 2,744,871 2,882,115 13,391,159 255004 Sewer Cleaning/Video 500,000 500,000 500,000 500,000 500,000 2,500,000 255017 Storm Drain Impr Citywide 500,000 500,000 500,000 500,000 500,000 2,500,000 265001 Corporate Yard Renovations 30,000 - - - - 30,000 601 Total 3,541,946 3,587,304 3,664,923 3,744,871 3,882,115 18,421,159 790 Computer Replacement 251602 Desktop PC Repl 266,000 273,980 282,199 290,665 299,385 1,412,229 251610 Storage Area Network Replacement 160,000 400,000 - 180,000 125,000 865,000 790 Total 426,000 673,980 282,199 470,665 424,385 2,277,229 954 City Trf: Merged 2008 Tax Exempt Bonds 255019 Police Facility Improvements 100,000 - - - - 100,000 255097 Police HQ Exterior Wall Sealing - 100,000 - - - 100,000 954 Total 100,000 100,000 - - - 200,000 Grand Total 33,251,379 27,271,784 32,823,922 23,358,036 21,111,500 137,816,621 2 FY27 Five-Year CIP by Project FY27 Proposed FY28 Proposed FY29 Proposed FY30 Proposed FY31 Proposed Five Year Total Project 203970 Rev Private Dev-Parker St Devel - - 100,000 - - 100,000 251602 Desktop PC Repl 266,000 273,980 282,199 290,665 299,385 1,412,229 251610 Storage Area Network Replacement 160,000 400,000 - 180,000 125,000 865,000 252107 Main Library Facility Improvement 326,906 21,000 - - - 347,906 253051 Fire Station Maint & Renov 50,000 50,000 50,000 50,000 50,000 250,000 255003 Sewer Line Maintenance/Replacement 2,511,946 2,587,304 2,664,923 2,744,871 2,882,115 13,391,159 255004 Sewer Cleaning/Video 500,000 500,000 500,000 500,000 500,000 2,500,000 255010 Chapman Grand Turn Mod 75,000 - 450,000 - - 525,000 255011 Chapman Cambridge Turn Mod 75,000 - 450,000 - - 525,000 255012 Streetlight Pole Replacement 500,000 500,000 500,000 500,000 500,000 2,500,000 255013 Glassell St Signal Network Ext - 100,000 - - - 100,000 255014 Katella Signal Network Extension 1,300,000 - - - - 1,300,000 255017 Storm Drain Impr Citywide 500,000 500,000 500,000 500,000 500,000 2,500,000 255019 Police Facility Improvements 545,000 - - - - 545,000 255027 Local Roadway Safety Plan (LRSP) - 50,000 - - - 50,000 255071 Quiet Zone/Rr Xing Safety 50,000 52,500 55,000 57,500 60,000 275,000 255072 Minor Traffic Control Devices 250,000 250,000 250,000 250,000 250,000 1,250,000 255073 Traffic Signal Controller Changeout 125,000 125,000 125,000 125,000 125,000 625,000 255078 Well Rehabilitation 200,000 200,000 250,000 250,000 250,000 1,150,000 255079 Water Plant Telemetry 100,000 100,000 100,000 100,000 100,000 500,000 255080 Emergency Generator 300,000 - 300,000 - - 600,000 255081 Well 29 5,000,000 - - - - 5,000,000 255082 S Water Yard Storage Replacement - - - - 300,000 300,000 255083 Meter Replacement Program 550,000 550,000 600,000 600,000 600,000 2,900,000 255084 Exterior Cathodic Protection System 50,000 50,000 50,000 50,000 50,000 250,000 255085 Pipeline Renewal Projects 2,000,000 2,100,000 2,100,000 2,100,000 2,100,000 10,400,000 255094 Biennial Traffic Signal Coordinat 50,000 50,000 50,000 50,000 50,000 250,000 255096 Water Utility Security Improvements 300,000 35,000 35,000 35,000 35,000 440,000 255097 Police Hq Exterior Wall Sealing - 100,000 - - - 100,000 255104 Reservoir 7 Hydropneumatic Tank Rep 400,000 1,000,000 - - - 1,400,000 255701 Pavement Management Program Survey 110,000 60,000 110,000 60,000 110,000 450,000 255702 Pavement Management Program 8,650,000 8,750,000 8,950,000 9,050,000 9,250,000 44,650,000 256009 Land Use Tracking & Permit Software 300,000 - - - - 300,000 257011 New Park W Orange 850,000 - - - - 850,000 257018 El Modena Area Renovation 500,000 - - - - 500,000 263001 Signal Pre-Emption Installation 50,000 50,000 50,000 50,000 50,000 250,000 263003 Fire Station 3 Building Addition 1,845,445 2,500,000 - - - 4,345,445 263004 Fire Station 5 Exercise Room Addition - 517,000 - - - 517,000 263005 Fire Station 2 Remodel - 1,140,000 11,151,800 - - 12,291,800 265001 Corporate Yard Renovations 700,000 - - - - 700,000 265100 Reservoir 2A Site Remediation 50,000 50,000 50,000 50,000 50,000 250,000 265101 Lower Serrano Pump Station - 500,000 1,000,000 - - 1,500,000 265102 Reservoir 3A Construction - 400,000 1,800,000 - - 2,200,000 265103 Reservoir 4A Construction - - - 1,500,000 1,500,000 3,000,000 265104 Reservoir 5 Pump Station Replacement - - - 1,200,000 1,200,000 2,400,000 265108 Katella & Batavia Signal Network Ext - - 150,000 - - 150,000 265109 Santiago Canyon Rd Signal Network Ext - - - 250,000 - 250,000 267001 Park Restroom Interior Renovations 280,000 75,000 80,000 85,000 90,000 610,000 267002 Sports Court Resurfacing 60,000 65,000 70,000 80,000 85,000 360,000 267005 Rampart St. Park 250,000 - - - - 250,000 267018 El Modena Park Area Renovation - - - 2,500,000 - 2,500,000 267034 Parking Lot Pavement Rehabilitation 75,000 - - - - 75,000 267035 Veterans Park Memorial Fountain Restoration 50,000 - - - - 50,000 3 FY27 Five-Year CIP by Project FY27 Proposed FY28 Proposed FY29 Proposed FY30 Proposed FY31 Proposed Five Year Total Project cont. 267036 Santiago Creek Trail - Lodge Pole Fencing Replacement 200,000 - - - - 200,000 267037 Playground Equipment Replacement 800,000 2,000,000 - - - 2,800,000 267038 El Camino Sports Court Resurfacing Project 155,000 - - - - 155,000 275005 Elevator Replacement - Police HQ & Corp Yard 520,000 - - - - 520,000 275006 Fleet Facilities - HVAC Installation & Interior Painting 575,000 - - - - 575,000 275010 Police HQ - Vehicle Gate System Replacement 90,000 - - - - 90,000 275011 Water Yard - North Yard Gate Replacement 120,000 - - - - 120,000 275012 Fleet Facilities - Corp Yard Roll-Up Replacement 270,000 - - - - 270,000 275014 26-27 CDBG Project 566,082 - - - - 566,082 275132 Citywide Bicycle Lane Enhancements - - - 150,000 - 150,000 265099 Reservoir Recoating - 1,400,000 - - - 1,400,000 255098 Batavia & Taft Signal Network Extension - 170,000 - - - 170,000 Grand Total 33,251,379$ 27,271,784$ 32,823,922$ 23,358,036$ 21,111,500$ 137,816,621$ 4 FY27 Five-Year CIP by Department FY27 Proposed FY28 Proposed FY29 Proposed FY30 Proposed FY31 Proposed Five Year Total Community Development 256009 Land Use Tracking & Permit Software 300,000 - - - - 300,000 275014 26-27 CDBG Project 566,082 - - - - 566,082 Community Development Total 866,082 - - - - 866,082 Community Services 257011 New Park W Orange 850,000 - - - - 850,000 257018 El Modena Area Renovation 500,000 - - - - 500,000 267001 Park Restroom Interior Renovations 280,000 75,000 80,000 85,000 90,000 610,000 267002 Sports Court Resurfacing 60,000 65,000 70,000 80,000 85,000 360,000 267005 Rampart St. Park 250,000 - - - - 250,000 267018 El Modena Park Area Renovation - - - 2,500,000 - 2,500,000 267034 Parking Lot Pavement Rehabilitation 75,000 - - - - 75,000 267035 Veterans Park Memorial Fountain Restoration 50,000 - - - - 50,000 267036 Santiago Creek Trail - Lodge Pole Fencing Replacement200,000 - - - - 200,000 267037 Playground Equipment Replacement 800,000 2,000,000 - - - 2,800,000 267038 El Camino Sports Court Resurfacing Project 155,000 - - - - 155,000 Community Services Total 3,220,000 2,140,000 150,000 2,665,000 175,000 8,350,000 Fire 253051 Fire Station Maint & Renov 50,000 50,000 50,000 50,000 50,000 250,000 263001 Signal Pre-Emption Installation 50,000 50,000 50,000 50,000 50,000 250,000 263003 Fire Station 3 Building Addition 1,845,445 2,500,000 - - - 4,345,445 263004 Fire Station 5 Workout Room Addition - 517,000 - - - 517,000 263005 Fire Station 2 Remodel - 1,140,000 11,151,800 - - 12,291,800 Fire Total 1,945,445 4,257,000 11,251,800 100,000 100,000 17,654,245 Information Technology 251602 Desktop PC Repl 266,000 273,980 282,199 290,665 299,385 1,412,229 251610 Storage Area Network Replacement 160,000 400,000 - 180,000 125,000 865,000 Information Technology Total 426,000 673,980 282,199 470,665 424,385 2,277,229 Library 252107 Main Library Facility Improvement 126,906 21,000 - - - 147,906 Library Total 126,906 21,000 - - - 147,906 Police 255019 Police Facility Improvements 245,000 - - - - 245,000 Police Total 245,000 - - - - 245,000 Public Works 203970 Rev Private Dev-Parker St Devel - - 100,000 - - 100,000 252107 Main Library Facility Improvement 200,000 - - - - 200,000 255003 Sewer Line Maintenance/Replacement 2,511,946 2,587,304 2,664,923 2,744,871 2,882,115 13,391,159 255004 Sewer Cleaning/Video 500,000 500,000 500,000 500,000 500,000 2,500,000 255010 Chapman Grand Turn Mod 75,000 - 450,000 - - 525,000 255011 Chapman Cambridge Turn Mod 75,000 - 450,000 - - 525,000 255012 Streetlight Pole Replacement 500,000 500,000 500,000 500,000 500,000 2,500,000 255013 Glassell St Signal Network Ext - 100,000 - - - 100,000 255014 Katella Signal Network Extension 1,300,000 - - - - 1,300,000 255017 Storm Drain Impr Citywide 500,000 500,000 500,000 500,000 500,000 2,500,000 255019 Police Facility Improvements 300,000 - - - - 300,000 255027 Local Roadway Safety Plan (LRSP) - 50,000 - - - 50,000 255071 Quiet Zone/Rr Xing Safety 50,000 52,500 55,000 57,500 60,000 275,000 255072 Minor Traffic Control Devices 250,000 250,000 250,000 250,000 250,000 1,250,000 255073 Traffic Signal Controller Changeout 125,000 125,000 125,000 125,000 125,000 625,000 255078 Well Rehabilitation 200,000 200,000 250,000 250,000 250,000 1,150,000 255079 Water Plant Telemetry 100,000 100,000 100,000 100,000 100,000 500,000 255080 Emergency Generator 300,000 - 300,000 - - 600,000 255081 Well 29 5,000,000 - - - - 5,000,000 255082 S Water Yard Storage Replacement - - - - 300,000 300,000 255083 Meter Replacement Program 550,000 550,000 600,000 600,000 600,000 2,900,000 255084 Exterior Cathodic Protection System 50,000 50,000 50,000 50,000 50,000 250,000 255085 Pipeline Renewal Projects 2,000,000 2,100,000 2,100,000 2,100,000 2,100,000 10,400,000 255094 Biennial Traffic Signal Coordinat 50,000 50,000 50,000 50,000 50,000 250,000 255096 Water Utility Security Improvements 300,000 35,000 35,000 35,000 35,000 440,000 255097 Police Hq Exterior Wall Sealing - 100,000 - - - 100,000 255098 Batavia & Taft Signal Network Extension - 170,000 - - - 170,000 255104 Reservoir 7 Hydropneumatic Tank Rep 400,000 1,000,000 - - - 1,400,000 255701 Pavement Management Program Survey 110,000 60,000 110,000 60,000 110,000 450,000 255702 Pavement Management Program 8,650,000 8,750,000 8,950,000 9,050,000 9,250,000 44,650,000 265001 Corporate Yard Renovations 700,000 - - - - 700,000 265100 Reservoir 2A Site Remediation 50,000 50,000 50,000 50,000 50,000 250,000 5 FY27 Five-Year CIP by Department FY27 Proposed FY28 Proposed FY29 Proposed FY30 Proposed FY31 Proposed Five Year Total Public Works cont. 265101 Lower Serrano Pump Station - 500,000 1,000,000 - - 1,500,000 265102 Reservoir 3A Construction - 400,000 1,800,000 - - 2,200,000 265103 Reservoir 4A Construction - - - 1,500,000 1,500,000 3,000,000 265104 Reservoir 5 Pump Station Replacement - - - 1,200,000 1,200,000 2,400,000 265108 Katella & Batavia Signal Network Ext - - 150,000 - - 150,000 265109 Santiago Canyon Rd Signal Network Ext - - - 250,000 - 250,000 275005 Elevator Replacement - Police HQ & Corp Yard 520,000 - - - - 520,000 275006 Fleet Facilities - HVAC Installation & Interior Painting 575,000 - - - - 575,000 275010 Police HQ - Vehicle Gate System Replacement 90,000 - - - - 90,000 275011 Water Yard - North Yard Gate Replacement 120,000 - - - - 120,000 275012 Fleet Facilities - Corp Yard Roll-Up Replacement 270,000 - - - - 270,000 275132 Citywide Bicycle Lane Enhancements - - - 150,000 - 150,000 265099 Reservoir Recoating - 1,400,000 - - - 1,400,000 Public Works Total 26,421,946 20,179,804 21,139,923 20,122,371 20,412,115 108,276,159 GRAND TOTAL 33,251,379$ 27,271,784$ 32,823,922$ 23,358,036$ 21,111,500$ 137,816,621$ 6 256009 Land Use Tracking and Permitting Software PROJECT DESCRIPTION The current permitting software used in Community Development was purchased in 2010. The system has become outdated and does not have the functionality needed to meet the growing demands for multi- department and system integration. This project proposes to upgrade the current permit tracking software to a comprehensive, flexible, fully integrated system that will automate workflow and tracking services for land use, building permits and other general permits, have online and mobile functionality, and act as a central portal for internal and external stakeholders to meet the current and future needs of the City. The project cost entails system set-up, information migration, training, equipment, City staff time, annual subscription costs, and technical support PROJECT DETAILS Project Type: One-Time Estimated Completion Date: 08/2027 Funding Source(s): Building Records Management Fee; Computer Replacement *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 256009 Land Use Tracking and Permitting Software Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount General Plan Update $300,000 $0 $0 $0 $0 AMOUNT $300,000 $0 $0 $0 $0 Powered by OpenGov CAPITAL IMPROVEMENT PROGRAM COMMUNITY SERVICES FISCAL YEAR 2026-2027 7 275014 CDBG Street Improvements Fiscal Year 2026-27 PROJECT DESCRIPTION This project will rehabilitate streets to be determined and will include but is not limited to, cold planning (milling) the existing asphalt, asphalt concrete overlay installation, reconstruction of sidewalks, curb and gutters, cross gutters, spandrels, sidewalk access ramps, and corresponding adjustment of manholes and water valves to grade. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2027 Funding Source(s): Community Development Block Grant   *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 275014 CDBG Street Improvements FY27 Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Community Development Block Grant $572,000 $0 $0 $0 $0 AMOUNT $572,000 $0 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2026-2027 8 257011 New Park in West Orange CARRYOVER PROJECT PROJECT DESCRIPTION The New Park in West Orange project was approved as a part of the Community Services Fiscal Year 2023-24 (FY24) CIP plan. A 2.4-acre piece of property managed by Orange County Flood Control District (OCFCD) located on W. Chapman between interstate 5 and the 57 freeway is the identified new park location. In FY24, the City entered into a long-term 50-year lease with OCFCD to build the park on the property. Project design and environmental review process began in FY24. During the park design process, OCFCD notified the City that they would be concurrently working on a levee height correction project in the Santa Ana Riverbed adjacent to the park site. The County’s levee project boundary lines impact a portion of the new park site; as a result, design plans from the County must be completed prior to the completion of new park plans. The City continues to work closely with OCFCD to coordinate the timing of design and construction for both projects. City funding for construction has been identified. In addition, federal Community Projects Funding in the amount of $850,000 was awarded for construction by Congressman Correa in Fiscal Year 2024-25 (FY25). City staff are currently finalizing required submission documents required for final project scope approval and grant agreement issuance. PROJECT DETAILS Project Type: One-Time Estimated Completion Date:  June 2030 Funding Source(s):  Reimbursable Capital Projects FINANCIAL SUMMARY 257011 New Park in West Orange Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Reimbursable Capital Projects $850,000 $0 $0 $0 $0 AMOUNT $850,000 $0 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM COMMUNITY SERVICES FISCAL YEAR 2026-2027 9 257018 El Modena Park Area Renovation CARRYOVER PROJECT PROJECT DESCRIPTION Improvements at El Modena Park were planned as a phased project. Phase 1 was completed in FY23 and included irrigation improvements and installation of a new tot lot shade structure. Phase 2, also completed in FY23, included installation of rubberized surfacing at the tot lot. Phase 3 of the project includes design and installation of a new backstop, fencing, poles, and netting around the existing baseball field to address safety concerns related to rogue foul balls. New netting installed along the 3rd baseline will be 70’ high, which will deter foul balls from flying into the street and into neighboring properties. A new 40-foot-tall chain link backstop will include an overhead netting hood to address foul balls. This project will also include replacement of failing retaining walls and surface and drainage improvements to the field. The design process for Phase 3 was completed in FY26. With the design phase completed, staff are pursuing a Major League Baseball (MLB) grant to supplement 512 funds. The competitive and semi-recurring MLB grant, if secured, would provide up to a 50% match, and requires the City to demonstrate full funding of the project to apply. By utilizing all 512 funds available and supplementing the difference with 510 funds, full funding could be exhibited. Council previously approved an appropriation of local funds required to demonstrate project funding, which would be offset by a potential grant award if secured. If the City does not receive the MLB (or similar) grant funding, the project will be reevaluated. PROJECT DETAILS Project Type: One-Time Estimated Project Completion Date: December 2026 Funding Source(s): El Modena Park Facility - Cell Tower Fee; Park Acquisition (Infill)   *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 257018 El Modena Park Area Renovation Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount El Modena Park Facility - Cell Tower Fee $800,000 $0 $0 $0 $0 Park Acquisition (Infill)$424,125 $0 $0 $0 $0 AMOUNT $1,224,125 $0 $0 $0 $0 Powered by OpenGov CAPITAL IMPROVEMENT PROGRAM COMMUNITY SERVICES FISCAL YEAR 2026-2027 10 267001 Park Restroom Interior Renovations PROJECT DESCRIPTION Nineteen of the City’s parks have restroom buildings. Many of these restrooms were last renovated 15 to 20 years ago and are in need of renovation to ensure the restrooms are a safe, durable, and functional space for public use. This project will involve initial evaluation, design, and renovation of facilities that are past their useful life or are in need of an update in subsequent years. A specific scope will be developed for each restroom depending on individual needs. Estimates to rehabilitate each restroom varies, as such, the project budget will vary every fiscal year. Based upon site inspections and evaluations, the next restroom facility in need of rehabilitation is at Santiago Hills Park. It should be noted that no substantial expenditures were undertaken in FY26; therefore, staff requests to reappropriate the prior year ’s programmed amount so that two program/project year efforts can be constructed in FY27. PROJECT DETAILS Project Type: Ongoing Estimated Completion Date: Ongoing Funding Source(s): Park Acquisition (Infill)   *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 267001 Park Restroom Interior Renovations Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Park Acquisition (Infill)$280,000 $75,000 $80,000 $85,000 $90,000 AMOUNT $280,000 $75,000 $80,000 $85,000 $90,000 CAPITAL IMPROVEMENT PROGRAM COMMUNITY SERVICES FISCAL YEAR 2026-2027 11 267002 Sports Court Resurfacing PROJECT DESCRIPTION The City has 22 parks, of which, several have sports courts. Parks with either tennis/pickleball, basketball, volleyball, and/or handball courts include Steve Ambriz Memorial, El Camino Real, Grijalva, Hart, Santiago Hills, and Serrano Parks. Court surfacing is specialized and requires maintenance on a regular schedule in order to maintain a safe playing surface. A typical maintenance schedule includes court resurfacing every five years. With 10 sports courts in total, the resurfacing program would rehabilitate two courts each year ensuring all courts are resurfaced on a five-year cycle. All 10 courts have been assessed by staff and priority for resurfacing has been based upon current conditions. Estimates to resurface each sports court vary. Grijalva Park basketball courts were resurfaced in FY 25. Hart Park tennis court improvements were originally anticipated to begin in FY26; however, expenditures are now planned to start in FY27, so funding is being reappropriated this FY. The next 2 sports courts in need of resurfacing are the volleyball courts and tennis courts at El Camino Real Park. These courts will be resurfaced as a part of the El Camino Real Park Sports Court Resurfacing and Conversion Project (Project 267038). PROJECT DETAILS Project Type: Ongoing Estimated Completion Date: Ongoing Funding Source(s): Park Acquisition (Infill)   *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 267002 Sports Court Resurfacing Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Park Acquisition (Infill)$60,000 $65,000 $70,000 $80,000 $85,000 AMOUNT $60,000 $65,000 $70,000 $80,000 $85,000 CAPITAL IMPROVEMENT PROGRAM COMMUNITY SERVICES FISCAL YEAR 2026-2027 12 267005 Rampart Street (Park) CARRYOVER PROJECT PROJECT DESCRIPTION The City secured an operating agreement with OC Public Works for two parcels managed by Orange County Flood Control along the Santa Ana River. The smaller of the two is a narrow parcel, measuring roughly 1 acre and located next to N. Rampart St., just north of W. Chapman Ave., adjacent to the bike trail and parallel to the 57 Fwy. A conceptual of the park has been completed and includes a proposed walking path, seating areas, landscape, a dog amenity area, and a water bottle filling station, while preserving the existing mature shade trees. Additional funding is requested for FY27 to complete construction once the design is finalized. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: 2027 Funding Source(s): Park Acquisition (Infill)   *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 267005 Rampart Riverwalk (Park) Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Park Acquisition (Infill)$250,000 $0 $0 $0 $0 AMOUNT $250,000 $0 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM COMMUNITY SERVICES FISCAL YEAR 2026-2027 13 267018 El Modena Basin Area Improvements Design CARRYOVER PROJECT PROJECT DESCRIPTION Through a 1973 use agreement with Orange County Flood Control District (OCFCD), the City operates the El Modena Basin located north of the intersection of S. Hewes St. and E. Jordan Ave. as a public park. Currently, the El Modena Basin’s amenities include a decomposed granite (DG) walking path around the interior open space. This project would provide area lighting to portions of the walking path, irrigation to enhance the existing plant material, upgraded DG to improve the walking path, and grading to accomplish ADA access improvements. The current budget (appropriated in 2025-26) includes the costs to design the project, which includes working with OCFCD for their approval on the project. Preliminary construction costs for grading, new lighting, and irrigation are approximately $2.5 million. Future funding has yet to be identified. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2027 Funding Source(s): Park Acquisition (Infill)   *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 267018 El Modena Basin Area Improvements Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Park Acquisition (Infill)$0 $0 $0 $2,500,000 $0 AMOUNT $0 $0 $0 $2,500,000 $0 CAPITAL IMPROVEMENT PROGRAM COMMUNITY SERVICES FISCAL YEAR 2026-2027 14 267034 Parking Lot Pavement Rehabilitation PROJECT DESCRIPTION The asphalt parking lot pavement in parks are in various stages of degradation and will require protective measures over the next several years. As part of a multi-year parking lot pavement rehabilitation initiative, successful pavement maintenance and rehabilitation treatments have been completed at all City Parks with parking lots within the last eight years with the exception of Steve Ambriz Memorial Park. In addition, the Yorba Park parking lot, which was last rehabilitated as a part of the Yorba Park Renovation project in 2017, has experienced excessive ground settling due to the park being built over a former landfill site, causing the asphalt to sink in. Along with accelerated wear and tear caused by the consistent use from dog park patrons, this parking lot is in need of rehabilitation. Parking lot rehabilitations will include repairing asphalt pavement, slurry seal coating, and new striping to protect them from further degradation. PROJECT DETAILS Project Type: Ongoing Estimated Project Completion Date: 2027 Funding Source(s): Park Acquisition (Infill) FINANCIAL SUMMARY 30053 Parking Lot Pavement Rehabilitation Funds Description 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Amount Park Acquisition (Infill)$0 $45,000 $0 $0 $0 AMOUNT $0 $45,000 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM COMMUNITY SERVICES FISCAL YEAR 2026-2027 15 267035 Veterans Park Memorial Fountain Restoration PROJECT DESCRIPTION Due to ground settling, the foundation of the Veterans Memorial fountain at Depot Park is lifting and is no longer level. This has caused fountain water to pass over the weir unevenly, causing tile discoloration and cracking due to mineral buildup. This project includes restoration of the existing fountain to correct waterflow issues, tile removal, and replacement of current tiles at the fountain. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: 2027 Funding Source(s): 510 - Park Acquisition (Infill)   *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 267035 Veterans Park Memorial Fountain Restoration Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Park Acquisition (Infill)$50,000 $0 $0 $0 $0 AMOUNT $50,000 $0 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM COMMUNITY SERVICES FISCAL YEAR 2026-2027 16 267036 Santiago Creek Trail - Lodge Pole Fencing Replacement PROJECT DESCRIPTION Along the north side of the Santiago Creek trail, in the section between S. Cambridge Street heading east to S. Tustin Street, the split-rail fencing is rotted and broken in several places. The splintering wood and fence openings create potential safety hazards for trail users that are currently being addressed with temporary remedies on an as needed basis. Complete replacement is needed for the approximate 3,000 linear feet of fencing. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: 2027 Funding Source(s): 510 - Park Acquisition (Infill)   *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 267036 Santiago Creek Trail- Lodge Pole Fencing Replacement Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Park Acquisition (Infill)$200,000 $0 $0 $0 $0 AMOUNT $200,000 $0 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM COMMUNITY SERVICES FISCAL YEAR 2026-2027 17 267037 Playground Equipment Replacement PROJECT DESCRIPTION The typical lifespan of park playground equipment is 8-12 years and the existing playground equipment in several of our City parks is reaching the end of their useful life. Staff have evaluated and made repairs to aging playground equipment citywide on an ongoing basis, but complete replacement will be needed soon for many parks. The FY27 project intends to replace equipment, and the budget takes into consideration the current average cost of public park playground equipment, the potential need for ADA accessibility upgrades, and possible installation of shade sails still needed at various park locations. Staff evaluated all City park playgrounds and compiled an inventory of each playground’s existing features and conditions. This information would be shared with the Park Planning and Community Events Commission (Commission), which would then prioritize one playground each year based on the community’s needs, interests, and available funding. Because replacement costs vary by site, project budgets would also vary annually. For parks without shade sails - one each at Hart, Killefer, McPherson, Santiago Hills, and two at Eisenhower - shade sails could be installed concurrently with new playground equipment. Staff is pursuing grant opportunities and external funding, especially for future years of this recurring project, which may impact prioritization of certain park sites. In the case that non-local funding becomes available prior to the FY28 CIP budget adoption, staff may request advanced appropriation at Council to show matching funds. PROJECT DETAILS Project Type: Ongoing Estimated Completion Date: 2027 Funding Source(s): 510 - Park Acquisition (Infill)   *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 267037 Playground Equipment Replacement Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Park Acquisition (Infill)$800,000 $2,000,000 $0 $0 $0 AMOUNT $800,000 $2,000,000 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM COMMUNITY SERVICES FISCAL YEAR 2026-2027 18 267038 El Camino Real Park Sports Courts Resurfacing and Conversion Project PROJECT DESCRIPTION As part of the El Camino Real Park Sports Resurfacing and Conversion Project, the Park Planning and Community Events Commission considered permanently converting one tennis court at El Camino Real Park, which currently has a pickleball overlay, into four pickleball courts. The other tennis court with a pickleball court overlay would be restored as a permanent tennis court, resulting in a total of five permanent tennis courts. The conversion will include the installation of four sets of pickleball posts, sleeves and nets, color coating and striping, 3’ tall chain link fence to provide a barrier between pickleball courts, and two 3’ tall swing gates to close off the fencing between tennis and pickleball courts. In addition, the resurfacing of the volleyball courts will be included in this project as part of the annual sports court resurfacing program. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: 2027 Funding Source(s): Park Acquisition (Infill)   *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 267038 El Camino Park Courts Resurfacing and Conversion Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Park Acquisition (Infill)$155,000 $0 $0 $0 $0 AMOUNT $155,000 $0 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM COMMUNITY SERVICES FISCAL YEAR 2026-2027 19 267039 El Modena Park Upper Restroom Replacement PROJECT DESCRIPTION The existing upper restroom facilities at El Modena Park remain functional; however, the exterior condition of the buildings has become deteriorated over time. Parks Maintenance staff have continued to maintain the interior facilities through ongoing fixture replacements and repairs resulting from repeated vandalism; however, the current structures have reached the end of their useful life. This project proposes the replacement of the existing restroom facilities with a new prefabricated restroom building designed to provide a safe, durable, and functional facility for public use while enhancing the overall appearance of the park. Asphalt improvements and public access modifications would also be completed to enhance site accessibility and to comply with current Americans with Disabilities Act (ADA) standards. Based on required asphalt improvements, the cost of the project is estimated to range between $300,000-$500,000. This project is intended to be funded through El Modena Park Facilities Fund (512) once sufficient revenue funding for the project has accrued in the fund balance; in addition, the use of Community Development Block Grant (CDBG) funding will be evaluated.  PROJECT DETAILS Project Type: One-Time Estimated Completion Date: 2029 Funding Source(s): El Modena Park Facilities Fund (512) Total Budget: $100,000   *Project funding includes development impact fees. Funding is dependent on receipt of development revenue.     FINANCIAL SUMMARY No future funding proposed. Powered by OpenGov CAPITAL IMPROVEMENT PROGRAM COMMUNITY SERVICES FISCAL YEAR 2026-2027 20 253051 Fire Station Repairs PROJECT DESCRIPTION The Fire Station Maintenance project provides funding to address maintenance issues which go beyond current replacement capacities. This project addresses major station maintenance and repairs, such as painting, carpeting, roof repairs, and any necessary station updates. Regular maintenance is essential to maintaining readiness and operational effectiveness during emergencies, enhancing the safety of both the firefighters and the community they serve. PROJECT DETAILS Project Type: Ongoing Estimated Completion Date: Ongoing Funding Source(s): FIRE FACILITY FEE DISTRICTS ALL COM 6/07   *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 253051 Fire Station Repairs Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Fire Facility Fee Districts All Com 6/07 $50,000 $50,000 $50,000 $50,000 $50,000 AMOUNT $50,000 $50,000 $50,000 $50,000 $50,000 CAPITAL IMPROVEMENT PROGRAM FIRE DEPARTMENT FISCAL YEAR 2026-2027 21 263001 Signal Pre-Emption Installation PROJECT DESCRIPTION The Opticom Traffic Pre-emption project involves the purchase and installation of traffic signal pre-emption equipment on the City’s major roadways, intersections, and fire apparatus. This technology enables emergency vehicles to navigate through traffic more efficiently and safely, reducing response times and potentially saving lives during critical situations. Pre-emption equipment installed on fire apparatus triggers the associated equipment within traffic signals to control signal lights for oncoming fire apparatus right-of-way during Code 3 responses. This programming enhances the overall effectiveness of emergency response operations and contributes to public safety. PROJECT DETAILS Project Type: Ongoing Estimated Completion Date: Ongoing Funding Source(s):  Fire Facility Fee Districts ALL COM 6/07   *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 263001 Signal Pre-Emption Installation Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Fire Facility Fee Districts All Com 6/07 $50,000 $50,000 $50,000 $50,000 $50,000 AMOUNT $50,000 $50,000 $50,000 $50,000 $50,000 CAPITAL IMPROVEMENT PROGRAM FIRE DEPARTMENT FISCAL YEAR 2026-2027 22 263003 Fire Station 3 Building Addition PROJECT DESCRIPTION The Fire Department aims to replace two existing structures located behind Fire Station 3 with a single new building to better address current operational needs and optimize the use of space. This new facility will feature dedicated space for medical and disaster supplies, in addition to providing extra room for storing apparatus, a workshop, and a laundry room. The current structures, consisting of a barn and a concrete masonry building, have been in use since the station was built in 1962 but have deteriorated over time. The proposed new building will address these operational needs, ensuring the department's functionality for years to come. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2030 Funding Source(s): FIRE FACILITY FEE DISTRICTS ALL COM 6/07   *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 263003 Fire Station 3 Building Addition Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Fire Facility Fee Districts All Com 6/07 $500,000 $0 $0 $0 $0 Reimbursable Capital Projects $2,000,000 $0 $0 $0 $0 Capital Projects $345,445 $2,500,000 $0 $0 $0 AMOUNT $2,845,445 $2,500,000 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM FIRE DEPARTMENT FISCAL YEAR 2026-2027 23 263004 Fire Station 5 Exercise Room Addition PROJECT DESCRIPTION This project establishes funding for the addition of an exercise room at Fire Station 5. Constructed in 1965, Fire Station 5 currently lacks the necessary space to store and utilize exercise equipment, crucial for cultivating a stronger and more physically fit workforce. Presently, the exercise equipment is located on the apparatus bay floor, alongside the frontline apparatus used in daily emergencies, significantly impeding the parking of emergency vehicles within the structure as well as exposing personnel to toxic carcinogens. The addition of an exercise room to the rear of Station 5 will provide flexibility for the future operational needs of the Fire Department by creating more space for personnel and apparatus. The existing fire station will largely remain unchanged, with some minor aesthetic improvements to complement the new room addition. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2030 Funding Source(s): Capital Projects FINANCIAL SUMMARY 263004 Fire Station 5 Exercise Room Addition Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Capital Projects $0 $517,000 $0 $0 $0 AMOUNT $0 $517,000 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM FIRE DEPARTMENT FISCAL YEAR 2026-2027 24 263005 Fire Station 2 Remodel PROJECT DESCRIPTION This project establishes funding for the design and construction of a permanent facility for Fire Station 2, which provides emergency service response to the central portion of the City and neighboring City of Villa Park. The new facility will be designed to accommodate up to three frontline emergency vehicles and eight fire suppression personnel. This project will combine the newly built single-bay apparatus and workout rooms with 9,500 square feet of new construction, which will include the following accommodations: office, living room, kitchen, (8) sleeping dorms, (5) restrooms, training classroom, and two-bay apparatus room.  PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2030 Funding Source(s): Capital Projects FINANCIAL SUMMARY 263005 Fire Station 2 Remodel Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Capital Projects $0 $1,140,000 $11,151,800 $0 $0 AMOUNT $0 $1,140,000 $11,151,800 $0 $0 CAPITAL IMPROVEMENT PROGRAM FIRE DEPARTMENT FISCAL YEAR 2026-2027 25 251602 Personal Computer Replacements PROJECT DESCRIPTION A recurring annual replacement of the City's aging PC (desktops, laptops, tablets) inventory is recommended. This initiative is a recommended guideline to replace a fifth of the City's PC inventory to prevent the inventory from becoming excessively aged and prevent impact to staff productivity due to PC failures. PROJECT DETAILS Project Type: Ongoing Estimated Completion Date: Ongoing Funding Source(s): Computer Replacement FINANCIAL SUMMARY 251602 Personal Computer Replacements Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Computer Replacement $266,000 $273,980 $282,199 $290,665 $299,385 AMOUNT $266,000 $273,980 $282,199 $290,665 $299,385 CAPITAL IMPROVEMENT PROGRAM INFORMATION TECHNOLOGY FISCAL YEAR 2026-2027 26 251610 Storage Area Network Replacement PROJECT DESCRIPTION IT forecasts costs to replace end-of-life SAN storage fabric switches in FY27. For FY28, IT forecasts replacement of the Civic Center SAN storage and also the backup system storage for Civic Center and the Police Department. For FY30, the Police Department SAN storage will be due for replacement. For FY31, IT forecasts the replacement of the Trusted System SAN storage. PROJECT DETAILS Project Type: Ongoing Estimated Completion Date: Ongoing Funding Source(s): Computer Replacement FINANCIAL SUMMARY 251610 Storage Area Network Replacement Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Computer Replacement $160,000 $400,000 $0 $180,000 $125,000 AMOUNT $160,000 $400,000 $0 $180,000 $125,000 CAPITAL IMPROVEMENT PROGRAM INFORMATION TECHNOLOGY FISCAL YEAR 2026-2027 27 262107 Main Library Facility Improvements CARRYOVER PROJECT PROJECT DESCRIPTION This project will encompass all facility improvements for the Main Library. In prior fiscal years, the north and south entrance automatic doors and the dumbwaiter elevator were replaced to improve accessibility and operations. Roof repairs were completed, the History Center sink was removed to address leaks affecting local archives and replaced with additional shelving to accommodate additional historical documents, and flooring in the Tower Reading Room was upgraded to carpet tile and the wood floor was refinished to extend the useful life and preserve the natural look of the wood in high-traffic areas. Additional improvements included replacement of carpet squares and baseboards in the Community Room to match library-wide finishes and replacement of ceiling wheels in the Steve Ambriz Reading Room to restore proper door function, with all work funded through the Building Forward Main Grant and library facility development fee revenues. The next phase of the project will focus on extensive repair and replacement of rain gutters at the Main Library across multiple locations. The existing rain gutter system has deteriorated beyond routine maintenance and no longer functions as designed. repairs to manage leaks, overflow, and drainage issues. This work is expected to include the removal of deteriorated gutter sections, replacement with new materials, repairs to downspouts and connections, and sealing to improve drainage and prevent future water intrusion, protect the building envelope, and reduce ongoing maintenance demands. This project will provide a long-term solution that improves facility resilience, preserves City assets, and minimizes the risk of water damage to public spaces and library materials. Staff is currently refining the scope of work, and preliminary cost estimates are anticipated to be approximately $200,000. PROJECT DETAILS Project Type: Ongoing Estimated Completion Date: June 2027 Funding Source(s): Library Facility Fees   FINANCIAL SUMMARY 262107 Main Library Facility Improvements Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Developer Impact Fees-Library $326,906 $21,000 $0 $0 $0 AMOUNT $326,906 $21,000 $0 $0 $0 Powered by OpenGov CAPITAL IMPROVEMENT PROGRAM LIBRARY FISCAL YEAR 2026-2027 28 255019 Police Facility Improvements PROJECT DESCRIPTION This project will encompass new furniture and miscellaneous facility improvements for police facilities including paint, carpet, lighting, window tint, and network cabling. This project will replace existing furniture with a new office design, refresh interior paint throughout the department and replace existing carpet and baseboards that have far exceeded its life expectancy. Additionally, the scope of work includes replacing existing lighting with energy efficient lighting to properly illuminate current workstations and offices. One division will be revitalized each year over a span of three years.    PROJECT DETAILS Project Type: One-Time Estimated Completion Date: 6/30/27 Funding Source(s): AB3229-COPS/STATE-(SUPPL LAW ENF SERVS; Police Facility Fees; CITY TRF: MERGED 2008 TAX EXEMPT BONDS FINANCIAL SUMMARY 255019 Police Facility Improvements Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount AB3229-Cops/State-(Suppl Law E $200,000 $0 $0 $0 $0 City Trf: Merged 2008 Tax Exempt Bonds $100,000 $0 $0 $0 $0 Police Facility Fees $245,000 $0 $0 $0 $0 AMOUNT $545,000 $0 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM POLICE DEPARTMENT FISCAL YEAR 2026-2027 29 203970 Rev Private Dev- Parker St Devel PROJECT DESCRIPTION This project will provide for the ultimate roadway configuration as the City builds out and adjacent parcels potentially redevelop. By reorganizing the existing paved roadway, this will provide features necessary to best serve various road users. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2029 Funding Source(s): Reimbursable Capital Projects   *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 203970 Rev Private Dev-Parker St Devel Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Reimbursable Capital Projects $0 $0 $100,000 $0 $0 AMOUNT $0 $0 $100,000 $0 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2026-2027 30 255003 Sewer Line Maintenance & Replacement PROJECT DESCRIPTION This project annually fixes hot spots due to root intrusion, offset joints, and damaged sewer mains. It also replaces both hydraulically and structurally deficient sewer mains. As part of the 2023 Sanitation Fee study, a new capital improvement component has been established to address the replacement and upgrade needs of the City’s sewer system. This fiscal year, $2.4 million is available to fund necessary sewer facility improvements at various locations citywide. PROJECT DETAILS Project Type: Ongoing Estimated Completion Date: Ongoing Funding Source(s): Sewer Construction FINANCIAL SUMMARY 255003 Sewer Line Maintenance & Replacement Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Sewer $2,511,946 $2,587,304 $2,664,923 $2,744,871 $2,882,115 AMOUNT $2,511,946 $2,587,304 $2,664,923 $2,744,871 $2,882,115 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2026-2027 31 255004 Sewer Cleaning & Video PROJECT DESCRIPTION The State's Waste Discharge Elimination (WDR) requires the City to complete a condition assessment of its entire 300+ mile sewer line system and develop a rehabilitation and replacement plan. Additional contract services are needed to comply with WDR requirements.   PROJECT DETAILS Project Type: Ongoing Estimated Completion Date: Ongoing Funding Source(s): Sewer FINANCIAL SUMMARY 255004 Sewer Cleaning & Video Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Sewer $500,000 $500,000 $500,000 $500,000 $500,000 AMOUNT $500,000 $500,000 $500,000 $500,000 $500,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2026-2027 32 255010 Chapman & Grand Left Turn Signal Modification PROJECT DESCRIPTION The project provides for a protected left-turn phase for the eastbound and westbound approaches on Chapman Avenue at Grand Street. The proposed signal modification will enhance the capacity and improve the traffic signal operation at the intersection. The project features decorative signal poles consistent with the Old Towne District theme. The scope of work includes installation of signal poles and gear, controller and cabinet, wiring, CCTV camera, electrical service; upgrading emergency vehicle preemption; and restoration of existing improvements. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2029 Funding Source(s): Transportations System (TSIP) FINANCIAL SUMMARY 255010 Chapman & Grand Left Turn Signal Modification Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount TSIP Citywide $75,000 $0 $450,000 $0 $0 AMOUNT $75,000 $0 $450,000 $0 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2026-2027 33 255011 Chapman & Cambridge Left Turn Signal Modification PROJECT DESCRIPTION The project provides for a protected left-turn phase for the eastbound, westbound, northbound, and southbound approaches at Chapman Avenue and Cambridge Street. The proposed signal modification will enhance the capacity and improve the traffic signal operation at the intersection. The scope of work includes installation of signal poles and gear, controller and cabinet, wiring, CCTV camera, and electrical service and restoration of existing improvements.   PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2029 Funding Source(s): City-Wide TSIP   FINANCIAL SUMMARY 255011 Chapman & Cambridge Left Turn Signal Modification Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount TSIP Citywide $75,000 $0 $450,000 $0 $0 AMOUNT $75,000 $0 $450,000 $0 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2026-2027 34 255012 Streetlight Pole Replacement Program PROJECT DESCRIPTION As a cost-saving measure, the City acquired an additional 4,359 streetlight poles from Southern California Edison (SCE) in Fiscal Year 2018. Over half the poles are steel poles. An annual pole replacement program is necessary to maintain the acquired streetlight infrastructure. This program will biannually replace 40 steel streetlight poles with City standard LED-retrofitted concrete poles and underground overhead wires. Additionally, this project provides for miscellaneous lighting, undergrounding, wiring, and pole knock downs. PROJECT DETAILS Project Type: Ongoing Estimated Completion Date: Ongoing Funding Source(s): Traffic Improvement - Measure M2; Capital Projects FINANCIAL SUMMARY 255012 Streetlight Pole Replacement Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Traffic Improvemnt -Measure M2 $30,000 $30,000 $30,000 $30,000 $30,000 Capital Projects $470,000 $470,000 $470,000 $470,000 $470,000 AMOUNT $500,000 $500,000 $500,000 $500,000 $500,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2026-2027 35 255013 Glassell St Signal Network Extension PROJECT DESCRIPTION The project will extend the existing City's Traffic Signal Network along Taft Avenue from Shaffer Street to Glassell Street and along Glassell Street from Taft Avenue to Lincoln Avenue. This will connect to the existing fiber lines on Glassell Street from Lincoln Avenue to Riverdale Avenue. The installation of fiber optic lines will enable the City's Traffic Management Center to communicate with the traffic signals along critical arterials to improve traffic signal operations and traffic flow. This will also allow immediate incident monitoring and response to reduce traffic congestion. Current funding is for design of the project while construction funding is requested. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: July 2027 Funding Source(s): City-Wide TSIP   *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 255013 Glassell St Signal Network Extension Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount TSIP Citywide $0 $100,000 $0 $0 $0 AMOUNT $0 $100,000 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2026-2027 36 255014 Katella Ave Signal Network Extension PROJECT DESCRIPTION The project will extend the existing City's Traffic Signal Network along Katella Avenue from Tustin Street to Santiago Boulevard and on Santiago Boulevard from Katella Avenue to Meats Avenue. The installation of fiber optic lines will enable the City's Traffic Management Center to communicate with the traffic signals along critical arterials to improve traffic signal operations and traffic flow. This will also allow immediate incident monitoring and response to reduce traffic congestion. Construction of improvements include upgrades to the controller cabinet and communication appurtenances. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2028 Funding Source(s): Traffic Improvement - Measure M2   FINANCIAL SUMMARY 255014 Katella Ave Signal Network Extension Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount TSIP Citywide $1,300,000 $0 $0 $0 $0 AMOUNT $1,300,000 $0 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2025-2026 37 255017 Storm Drain Improvements PROJECT DESCRIPTION This project replaces existing deficient drainage systems and constructs new storm drain lines as needed per the Master Plan of Drainage to alleviate localized flooding. PROJECT DETAILS Project Type: Ongoing Estimated Completion Date: Ongoing Funding Source(s): Sewer FINANCIAL SUMMARY 255017 Storm Drain Improvements Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Sewer $500,000 $500,000 $500,000 $500,000 $500,000 AMOUNT $500,000 $500,000 $500,000 $500,000 $500,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2026-2027 38 255027 Local Roadway Safety Plan PROJECT DESCRIPTION This project develops a Local Road Safety Plan (LRSP) that will define goals, objectives, and strategies to reduce accidents on local roads. The LRSP will also provide a framework to identify, analyze, and prioritize roadway safety improvements and offers a proactive approach to addressing safety needs while demonstrating agency responsiveness to safety challenges. The scope of work includes the following key tasks: state of the system review, accident history assessment, countermeasure development, implementation program, and development of the LRSP document. This project also includes an update which is required by CalTrans every five years. PROJECT DETAILS Project Type: Ongoing Estimated Completion Date: Ongoing Funding Source(s): Traffic Improvement - Measure M2 FINANCIAL SUMMARY 255027 Local Roadway Safety Plan Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Traffic Improvemnt -Measure M2 $0 $50,000 $0 $0 $0 AMOUNT $0 $50,000 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2026-2027 39 255071 Quiet Zone Maintenance PROJECT DESCRIPTION This project provides for the annual Quiet Zone and Safe Railroad Crossing maintenance agreement with Southern California Regional Rail Authority and any related maintenance or improvements necessary for compliance. PROJECT DETAILS Project Type: Ongoing Estimated Completion Date: Ongoing Funding Source(s): CAPITAL PROJECTS FINANCIAL SUMMARY 255017 Quiet Zone Maintenance Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Capital Projects $50,000 $52,500 $55,000 $57,500 $60,000 AMOUNT $50,000 $52,500 $55,000 $57,500 $60,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2026-2027 40 255072 Minor Traffic Control Devices PROJECT DESCRIPTION This project provides for minor traffic control devices such as signage, striping, lighting, undergrounding, wiring, and other traffic-related devices and appurtenances as directed by the Traffic Commission and City Traffic Engineer. PROJECT DETAILS Project Type: Ongoing Estimated Completion Date: Ongoing Funding Source(s): Traffic Improvement - Measure M2, Capital Projects   *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 255072 Minor Traffic Control Devices Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Traffic Improvemnt -Measure M2 $50,000 $50,000 $50,000 $50,000 $50,000 Capital Projects $200,000 $200,000 $200,000 $200,000 $200,000 AMOUNT $250,000 $250,000 $250,000 $250,000 $250,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2026-2027 41 255073 Traffic Signal Controller Changeout PROJECT DESCRIPTION The City maintains 158 traffic signals. Nearly two-thirds of the controllers have recently been updated or replaced to allow for better coordination with the City's Transportation Management Center (TMC). The project is an on-going process of updating or replacing controllers, signal cabinets and communication equipment, CCTV cameras, traffic signal battery backups, future signal controller needs, and upgrading TMC equipment and software. PROJECT DETAILS Project Type: Ongoing Estimated Completion Date: Ongoing Funding Source(s): Gas Tax Maintenance FINANCIAL SUMMARY 255073 Traffic Signal Controller Changeout Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Gas Tax Maintenance $125,000 $125,000 $125,000 $125,000 $125,000 AMOUNT $125,000 $125,000 $125,000 $125,000 $125,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2026-2027 42 255078 Well Rehabilitation PROJECT DESCRIPTION This project provides for on-going inspection, repair, and refurbishment of existing water wells. PROJECT DETAILS Project Type: Ongoing Estimated Completion Date: Ongoing Funding Source(s): Water FINANCIAL SUMMARY 255078 Well Rehabilitation Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Water $200,000 $200,000 $250,000 $250,000 $250,000 AMOUNT $200,000 $200,000 $250,000 $250,000 $250,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS - WATER FISCAL YEAR 2026-2027 43 255079 Water Plant Telemetry PROJECT DESCRIPTION This project provides for the maintenance of the Supervisory Control and Data Acquisition (SCADA) system. This computer-driven telemetry system allows for remote monitoring and automatic control of all water sources of supply, pumping, storage, and flow control facilities. PROJECT DETAILS Project Type: Ongoing Estimated Completion Date: Ongoing Funding Source(s): Water FINANCIAL SUMMARY 255079 Water Plant Telemetry Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Water $100,000 $100,000 $100,000 $100,000 $100,000 AMOUNT $100,000 $100,000 $100,000 $100,000 $100,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS - WATER FISCAL YEAR 2026-2027 44 255080 Emergency Generator PROJECT DESCRIPTION This project provides for the acquisition of one fixed 480-volt three-phase emergency generator to be used to supply emergency electricity to water pumping facilities during power outages. Locations of the remaining generators are scheduled for Reservoir 8 in FY 29. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2029 Funding Source(s): Water FINANCIAL SUMMARY 255080 Emergency Generator Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Water $300,000 $0 $300,000 $0 $0 AMOUNT $300,000 $0 $300,000 $0 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS - WATER FISCAL YEAR 2026-2027 45 255081 Well 29 Construction PROJECT DESCRIPTION Well 29 is a proposed new 3,000 gallons-per-minute groundwater production facility to replace Well 8 located at Katella Avenue and Struck Avenue. This project includes design, well drilling, pump installation, electrical, storm drain, piping connection, treatment, and an emergency power generator. The Orange County Water District is funding a treatment program to assist with construction costs. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: November 2027 Funding Source(s): Water, Reimbursible Funding through OCWD FINANCIAL SUMMARY 255081 Well 29 Construction Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Water $2,500,000 $0 $0 $0 $0 Reimbursable Capital Projects $2,500,000 $0 $0 $0 $0 AMOUNT $5,000,000 $0 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS - WATER FISCAL YEAR 2026-2027 46 255082 South Water Yard Storage Replacement PROJECT DESCRIPTION This project provides for the design and construction of the warehouse replacement. The existing 5,000 square feet warehouse will be renovated and used in conjunction with the proposed Fire Department Headquarter. The replacement warehouse will be constructed at the water division's south yard for parts and equipment storage. This project also provides for the cover structure over the water division's materials storage area in compliance with the National Pollutants Discharge Elimination System (NPDES) requirements. The structure prevents run-off from washing out construction material such as sands, asphalt, base, and soil into the storm drain system. It also helps reduce noise and assists with dust control. This project will also pursue sustainable energy and efficiency measures such as integrated solar panels.   PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2031 Funding Source(s): Water FINANCIAL SUMMARY 255082 South Water Yard Storage Replacement Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Water $0 $0 $0 $0 $300,000 AMOUNT $0 $0 $0 $0 $300,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS - WATER FISCAL YEAR 2026-2027 47 255083 Meter Replacement Program PROJECT DESCRIPTION This project provides for the repair or replacement of water meters in the water system to reduce water loss and accurately bill for water usage. As part of the on-going 15-year small meter replacement program, an average of 1,800 small meters are replaced per year. Additionally, this project allows for the automated method of gathering meter reads, consumption data, and other system information that will benefit water operations and customers. PROJECT DETAILS Project Type: Ongoing Estimated Completion Date: Ongoing Funding Source(s): Water FINANCIAL SUMMARY 255083 Meter Replacement Program Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Water $550,000 $550,000 $600,000 $600,000 $600,000 AMOUNT $550,000 $550,000 $600,000 $600,000 $600,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS - WATER FISCAL YEAR 2026-2027 48 255084 Exterior Cathodic Protection Systems PROJECT DESCRIPTION This project provides for ongoing inspection, repair, and replacement of interior and exterior cathodic protection systems for steel water tanks in the water system. Each of the steel tanks rely on a functioning cathodic protection system for corrosion protection. PROJECT DETAILS Project Type: Ongoing Estimated Completion Date: Ongoing Funding Source(s): Water FINANCIAL SUMMARY 255084 Exterior Cathodic Protection Systems Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Water $50,000 $50,000 $50,000 $50,000 $50,000 AMOUNT $50,000 $50,000 $50,000 $50,000 $50,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS - WATER FISCAL YEAR 2026-2027 49 255085 Pipeline Renewal Projects PROJECT DESCRIPTION This project provides for the design and construction of water mainline replacements for the City's water system. Approximately 1.5 miles of pipeline are targeted to be replaced annually due to increasing age, substandard sizing, corrosion, or high maintenance. PROJECT DETAILS Project Type: Ongoing Estimated Completion Date; Ongoing Funding Source(s): Water FINANCIAL SUMMARY 255085 Pipeline Renewal Projects Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Water $2,000,000 $2,100,000 $2,100,000 $2,100,000 $2,100,000 AMOUNT $2,000,000 $2,100,000 $2,100,000 $2,100,000 $2,100,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS - WATER FISCAL YEAR 2026-2027 50 255094 Traffic Signal Coordination PROJECT DESCRIPTION This project is for the on-going implementation of studies and improvements for traffic signals along the City's major arterials within its boundaries. The studies include traffic counts, analysis of traffic flows, provide signal timing, and synchronization. The project will provide for the traffic signal infrastructure improvements necessary to achieve optimum signal timing and synchronization. The coordinated signal timing will be implemented through the City's Traffic Management Center. The traffic signal coordination will reduce travel times, save on gas, and reduce vehicle emissions. Ongoing PROJECT DETAILS Project Type: Ongoing Estimated Completion Date: Ongoing Funding Source(s): Traffic Improvement - Measure M2 FINANCIAL SUMMARY 255094 Biennial Traffic Signal Coordination Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Traffic Improvemnt -Measure M2 $50,000 $50,000 $50,000 $50,000 $50,000 AMOUNT $50,000 $50,000 $50,000 $50,000 $50,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2026-2027 51 255906 Water Utility Security Improvements PROJECT DESCRIPTION This project provides funding to replace and construct Water Utility Security improvements at various water facilities as identified in the Water System Vulnerability Assessment. The improvement areas include block walls, fencing, surveillance cameras, and other improvements. PROJECT DETAILS Project Type: Ongoing Estimated Completion Date: Ongoing Funding Source(s): Water FINANCIAL SUMMARY 255096 Water Utility Security Improvements Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Water $300,000 $35,000 $35,000 $35,000 $35,000 AMOUNT $300,000 $35,000 $35,000 $35,000 $35,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS - WATER FISCAL YEAR 2026-2027 52 255097 Police Headquarter Exterior Wall Sealing PROJECT DESCRIPTION The ceramic tile exterior of the Police Headquarters requires cleaning and sealing every five years to prevent internal damage from rainwater. This project accumulates funding which is critical for the maintenance of the Police Headquarters and will also fund other water leak repair costs.   PROJECT DETAILS Project Type: Ongoing Estimated Completion Date: Ongoing Funding Source(s): City Trf: Merged 2008 Tax Exempt Bonds FINANCIAL SUMMARY 255097 Police Headquarter Exterior Wall Sealing Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount City Trf: Merged 2008 Tax Exempt Bonds $0 $100,000 $0 $0 $0 AMOUNT $0 $100,000 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM POLICE DEPARTMENT FISCAL YEAR 2026-2027 53 255098 Batavia & Taft Signal Network Extension PROJECT DESCRIPTION The project will extend the existing City's Traffic Signal Network along Taft Avenue from Shaffer Street to Main Street and along Batavia Street from Taft Avenue to Fletcher Avenue. The installation of fiber optic lines will enable the City's Traffic Management Center to communicate with the traffic signals along critical arterials to improve traffic signal operations, and traffic flow. This will also allow immediate incident monitoring and response to reduce traffic congestion. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: July 2030 Funding Source(s): City-Wide TSIP   *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 255098 Batavia and Taft Signal Network Extension Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount TSIP Citywide $0 $170,000 $0 $0 $0 AMOUNT $0 $170,000 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2026-2027 54 255104 Reservoir 7 Hydropneumatics Tank Replacement PROJECT DESCRIPTION This project provides for the design and construction of the replacement hydropneumatics tank and pump station at Reservoir 7 in southeast Orange. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2031 Funding Source(s): Water   *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 255104 Reservoir 7 Hydropneumatics Tank Replacement Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Park Acquisition (Infill)$60,000 $65,000 $70,000 $80,000 $85,000 AMOUNT $60,000 $65,000 $70,000 $80,000 $85,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS- WATER FISCAL YEAR 2026-2027 55 255701 Pavement Management Program Survey PROJECT DESCRIPTION Windshield field surveys of the City's pavement are conducted every two years for arterial streets and every six years for local streets to determine the pavement condition indexes for each segment. These surveys are conducted as a requirement for numerous grant programs, OCTA bi-annual reports, and overall pavement management programs. This project also includes traffic data collection including traffic counts, parking surveys, and speed surveys to be done bi-annually. PROJECT DETAILS Project Type: Ongoing Estimated Completion Date: Ongoing Funding Source(s): Traffic Improvement - Measure M2, TSIP FINANCIAL SUMMARY 255701 Pavement Management Program Survey Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount TSIP Citywide $40,000 $60,000 $40,000 $60,000 $40,000 Traffic Improvemnt -Measure M2 $70,000 $0 $70,000 $0 $70,000 AMOUNT $110,000 $60,000 $110,000 $60,000 $110,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2026-2027 56 255702 Pavement Management Program PROJECT DESCRIPTION The City's Pavement Management Program identifies the condition of 320 miles of streets and identifies the maintenance needs of this roadway system. This program requires $6 million annually for slurry sealing, asphalt overlays, and reconstructions to maintain the City's Pavement Condition Index rating. This fiscal year's CIP lists other road maintenance projects and CDBG projects. This project outlines the remaining funding needs from Gas Tax, Measure M2, and Capital Projects. Approximately $8.2 million of new funding will be allocated to the various roadway management projects for this fiscal year. PROJECT DETAILS Project Type: Ongoing Estimated Completion Date: Ongoing Funding Source(s): Traffic Improvement - M2, Gas Tax Maintenance, RMRA Road Maintenance Rehabilitation, Capital Projects FINANCIAL SUMMARY 255702 Pavement Management Program Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Traffic Improvemnt -Measure M2 $3,000,000 $3,000,000 $3,100,000 $3,100,000 $3,200,000 Gas Tax Maintenance $150,000 $150,000 $150,000 $150,000 $150,000 Rmra Road Maint Rehabilitation Account $3,500,000 $3,600,000 $3,700,000 $3,800,000 $3,900,000 Capital Projects $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 AMOUNT $8,650,000 $8,750,000 $8,950,000 $9,050,000 $9,250,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2026-2027 57 265001Corporate Yard Renovations PROJECT DESCRIPTION The next phase of the Corporation Yard Renovation will focus on critical infrastructure and site improvements to support ongoing operations and regulatory compliance. Planned work includes sewer pipe relocation, completion of adjacent property wall improvements, and construction of storage bunkers. This phase will continue to enhance site functionality, improve safety, and support compliance with NPDES and environmental requirements. PROJECT DETAILS Project Type:One-Time  Estimated Completion Date: June 2028  Funding Source(s): Capital Projects; Sewer   *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 265001 Corp Yard Renovations Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Sewer $30,000 $0 $0 $0 $0 Capital Projects $670,000 $0 $0 $0 $0 AMOUNT $700,000 $0 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2026-2027 58 265100 Reservoir 2A Site Remediation PROJECT DESCRIPTION This project provides for design, specifications, cost estimates, and construction of site stabilization for the Reservoir 2A site in the Vista Royale Tract, located in northwest Orange. This existing facility is being monitored for peripheral movement. The proposed remediation includes the installation of soldier piles and grade beams to minimize future differential movement on site. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2031 Funding Source(s): Water   FINANCIAL SUMMARY 265100 Reservoir 2A Site Remediation Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Water $50,000 $50,000 $50,000 $50,000 $50,000 AMOUNT $50,000 $50,000 $50,000 $50,000 $50,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS - WATER FISCAL YEAR 2026-2027 59 265101 Lower Serrano Pump Station PROJECT DESCRIPTION This project includes the design and construction to complete the 100-horsepower pressure pump station in northeast Orange. This pump station will move water from Zone 3 to Zone 4. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: July 2029 Funding Source(s): Water FINANCIAL SUMMARY 265101 Lower Serrano Pump Station Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Water $0 $500,000 $1,000,000 $0 $0 AMOUNT $0 $500,000 $1,000,000 $0 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS - WATER FISCAL YEAR 2026-2027 60 265102 Reservoir 3A Construction PROJECT DESCRIPTION This project provides for the design and construction of a one million gallon steel water tank at a site directly adjacent to the existing Reservoir 3. This tank will provide additional storage for existing residential needs and fire protection for Zone 3 in northeast Orange. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2029 Funding Source(s): Water FINANCIAL SUMMARY 265102 Reservoir 3A Construction Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Water $0 $400,000 $1,800,000 $0 $0 AMOUNT $0 $400,000 $1,800,000 $0 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS - WATER FISCAL YEAR 2026-2027 61 265103 Reservoir 4A Construction PROJECT DESCRIPTION This project provides for the design and construction of a three million gallon steel water tank at a site near the intersection of Cannon Street and Creekside Avenue. This tank will provide additional storage for existing residential needs and fire protection for Zone 1 in southeast Orange. PROJECT DETAILS Project Type: Ongoing Estimated Completion Date: June 2031 Funding Source(s): Water FINANCIAL SUMMARY 265103 Reservoir 4A Construction Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Water $0 $0 $0 $1,500,000 $1,500,000 AMOUNT $0 $0 $0 $1,500,000 $1,500,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS - WATER FISCAL YEAR 2026-2027 62 265104 Reservoir 5 Pump Station Replacement PROJECT DESCRIPTION This project provides for the design and construction of a replacement pump station at Reservoir 5 in southeast Orange. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2031 Funding Source(s): Water FINANCIAL SUMMARY 265104 Reservoir 5 Pump Station Replacement Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Water $0 $0 $0 $1,200,000 $1,200,000 AMOUNT $0 $0 $0 $1,200,000 $1,200,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS - WATER FISCAL YEAR 2026-2027 63 265108 Katella & Batavia Signal Network Extension PROJECT DESCRIPTION The project will extend the existing City's Traffic Signal Network along Katella Avenue from Main Street to Struck Avenue and along Batavia Street from Katella Avenue to Palm Avenue. The installation of fiber optic lines will enable the City's Traffic Management Center to communicate with the traffic signals along critical arterials to improve traffic signal operations, and traffic flow. This will also allow immediate incident monitoring and response to reduce traffic congestion. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2029 Funding Source(s): Transportation System (TSIP)   *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 265108 Katella & Batavia Signal Network Extension Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount TSIP Citywide $0 $0 $150,000 $0 $0 AMOUNT $0 $0 $150,000 $0 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2026-2027 64 265109 Santiago Canyon Road Signal Network Extension PROJECT DESCRIPTION The project will extend the existing City's Traffic Signal Network along Santiago Canyon Road from Cannon Street to Chapman Avenue. The installation of fiber optic lines will enable the City's Traffic Management Center to communicate with the traffic signals along critical arterials to improve traffic signal operations, and traffic flow. This will also allow immediate incident monitoring and response to reduce traffic congestion. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: December 2030 Funding Source(s): Transportation System (TSIP)   *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 265109 Santiago Canyon Road Signal Network Extension Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount TSIP Citywide $0 $0 $0 $250,000 $0 AMOUNT $0 $0 $0 $250,000 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2026-2027 65 275005 Elevator Replacement - Police Headquarters and Corporation Yard Buildings 1 & 2 PROJECT DESCRIPTION The elevators at Police Headquarters (2 units) and at Corporation Yard Buildings 1 and 2 (2 units each) have exceeded their 20-30-year useful lives and have experienced frequent mechanical and operational issues. This project will replace all four elevators with modern, code-compliant systems, including updated controls, safety devices, and finishes. Replacement will improve reliability, ensure compliance with safety and accessibility requirements, reduce ongoing maintenance costs, and maintain uninterrupted access for staff and visitors. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2027 Funding Source(s): Capital Projects   *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 275005 Elevator Replmnt- Police HQ & Corp Yard Bldg 1 & 2 Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Capital Projects $260,000 $0 $0 $0 $0 Police Facility Fees $260,000 $0 $0 $0 $0 AMOUNT $520,000 $0 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2026-2027 66 275006 Fleet Facility HVAC Installation and Interior Painting PROJECT DESCRIPTION The Fleet maintenance facility lacks a cooling system sufficient to meet OSHA heat illness prevention requirements, putting employees at risk during high-temperature conditions. This project will install a new HVAC system to provide adequate cooling and air circulation throughout the shop, ensuring regulatory compliance, improved employee safety, and enhanced productivity. In addition, the interior walls and surfaces of the facility will be painted to refresh the workspace, protect building surfaces, and improve overall working conditions. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2027 Funding Source(s): Capital Projects   *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 275006 Fleet Facility HVAC Installation & Interior Painting Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Capital Projects $575,000 $0 $0 $0 $0 AMOUNT $575,000 $0 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM DEPARTMENT TITLE FISCAL YEAR 2026-2027 67 275010 Police Headquarters Vehicle Access System Modernization PROJECT DESCRIPTION Capital replacement and modernization of the Police Department’s vehicle gate and access-control system at Police Headquarters, which has reached the end of its service life and is experiencing ongoing operational and maintenance issues. This project will replace gate controls, tracks, and motors for all three vehicle access gates and includes construction of a recessed concrete track slab, relocation of access keypads to ensure proper vehicle clearance, and repainting of the gates to enhance durability, safety, and security. These improvements maintain critical secured police facility infrastructure and support reliable emergency response operations and overall facility functionality. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2027 Funding Source(s): Capital Projects   *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 275010 Police HQ Vehicle Access System Modification Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Police Facility Fees $90,000 $0 $0 $0 $0 AMOUNT $90,000 $0 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2026-2027 68 275011 Water Yard North Yard Gate Replacement PROJECT DESCRIPTION The four vehicle access gates along the north side of the Water Yard have reached the end of their service life and require frequent maintenance. This project will replace the automatic gate operators, tracks, and control systems to restore reliable operation, improve site security, and reduce ongoing repair costs at this critical utility facility. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2027 Funding Source(s): Capital Projects   *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 275011 Water Yard North Yard Gate Replacement Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Water $120,000 $0 $0 $0 $0 AMOUNT $120,000 $0 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2026-2027 69 275012 Fleet Facility Corp Yard Roll-Up Door Replacement PROJECT DESCRIPTION The roll-up doors at Corporate Yard Building 1 have reached the end of their service life and are experiencing increasing mechanical failures. Two doors have already been replaced, and a third is being addressed with a current CIP. This project will replace the remaining nine garage doors, including new assemblies and motorized operators, to complete the facility-wide upgrade, improve reliability, and reduce maintenance and emergency repair costs. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2027 Funding Source(s): Capital Projects   *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 275012 Fleet Facility Corp Yard Roll-Up Door Replacement Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Capital Projects $270,000 $0 $0 $0 $0 AMOUNT $270,000 $0 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2026-2027 70 275132 Citywide Bicycle Lane Enhancements PROJECT DESCRIPTION This project will implement green-colored pavement to enhance the conspicuity of existing City bike lanes. Colored pavement within a bicycle lane increases the visibility of the facility, identifies potential areas of conflict, and reinforces priority to bicyclists in conflict areas. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2030 Funding Source(s): Capital Projects FINANCIAL SUMMARY 275132 Citywide Bicycle Lane Enhancements Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Capital Projects $0 $0 $0 $150,000 $0 AMOUNT $0 $0 $0 $150,000 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2026-2027 71 265099 Reservoir Recoating PROJECT DESCRIPTION This project is part of a long-term reservoir maintenance program that provides for the repair and replacement of exterior/interior protective coatings for all fifteen steel reservoirs in the water system. PROJECT DETAILS Project Type: Ongoing Estimated Completion Date: Ongoing Funding Source(s): Water FINANCIAL SUMMARY 265099 Reservoir Recoating Funds Description 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed 2031 Proposed Amount Water $0 $1,400,000 $0 $0 $0 AMOUNT $0 $1,400,000 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS - WATER FISCAL YEAR 2026-2027 72 257012 Skatepark at Grijalva Park CARRYOVER PROJECT PROJECT DESCRIPTION At the City Council meeting of November 15, 2022, the City Council approved the use of $1.75 million in park development fees collected from a housing development Orange Heights, to build a skatepark at Grijalva Park. In FY 24, the City began the design process which included collecting input from stakeholders and local skaters. The conceptual design was presented to the Park Planning and Community Events Commission in March 2024. Final plans and construction documents were approved in October 2025. Construction is anticipated to begin in Summer 2026. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: Winter 2027 Funding Source(s): Capital Projects; Grijalva Park Fund FINANCIAL SUMMARY No future funding proposed. Powered by OpenGov CAPITAL IMPROVEMENT PROGRAM COMMUNITY SERVICES FISCAL YEAR 2026-2027 73 257019 Hart Park Diamond 1 Field Improvements CARRYOVER PROJECT PROJECT DESCRIPTION Located at Hart Park, Diamond 1 is used as a collegiate level baseball field. Currently, the City partners with Chapman University (Chapman) and Orange Lutheran High School (OLU) to maintain this premier field. Installation of ball field netting along the first and third base foul lines will protect park users and the adjacent neighborhood from foul balls. Design was completed in FY 25. The City is working with Chapman and OLU to determine cost sharing for the project. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2028 Funding Source(s): Park Acquisition (Infill); Reimbursable Capital Projects   *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY No future funding proposed. Powered by OpenGov CAPITAL IMPROVEMENT PROGRAM COMMUNITY SERVICES FISCAL YEAR 2026-2027 74 257029 Grijalva Park Master Plan Update CARRYOVER PROJECT PROJECT DESCRIPTION The City owns the 42-acre Grijalva Park site which is being developed in phases. In 2003, Phase I was completed on 15 acres and includes an active park with soccer fields, a tot lot, and a small activity room. In 2005, a Grijalva Park Master Plan was developed for the remaining 27 acres which included a sports center/gymnasium, skate park, amphitheater, additional restrooms, picnic facilities, an aquatics center, and additional parking. In 2011, the Sports Center at Grijalva Park was opened, along with adjacent parking. Nine acres remained undeveloped. In 2019, the City Council gave their support for four community partners to fundraise to develop the vacant property. Since then, three groups began to fundraise for amenities including a skatepark, community arts theater, and community/library/senior center. In 2022, the City Council funded the skate park portion of the plan, which is a separate CIP.  City staff engaged with the Orange County Council of Governments (OCCOG) to develop a site-specific reuse plan for Grijalva Park. As the Master Plan has evolved since 2005 the reuse plan would reconceptualize the remaining undeveloped acres to understand what will feasibly fit within the allowable open space. The reconceptualized plan would also include an updated estimate regarding the parking necessary to accommodate all the proposed amenities and suggest what, if any, amendments or technical memoranda need to accompany the existing Mitigated Negative Declaration. The planning work is being conducted through the OC-COG US EPA Brownfield Grant where the City of Orange is a coalition partner and the project will be paid for with grant funding based on the cost of the current scope at approximately $160,000. This project also has carryover funding of $100,000 that may be used for any additional work not covered in the current scope.   PROJECT DETAILS Project Type: One-Time Estimated Completion Date: 2027 Funding Source(s): Park Acquisition (Infill) Total Budget: $100,000   *Project funding includes development impact fees. Funding is dependent on receipt of development revenue.     FINANCIAL SUMMARY No future funding proposed. Powered by OpenGov CAPITAL IMPROVEMENT PROGRAM COMMUNITY SERVICES FISCAL YEAR 2026-2027 75 257031 Ball Field Netting (Olive) CARRYOVER PROJECT PROJECT DESCRIPTION Olive Park is home to youth baseball programs. Park amenities include several ball fields that are adjacent to homes. The existing netting in some areas is damaged or non-existent, creating safety concerns for fly and foul balls. This project includes the design and construction of new netting. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: December 2026 Funding Source(s): Park Acquisition (Infill)   *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY No future funding proposed. Powered by OpenGov CAPITAL IMPROVEMENT PROGRAM COMMUNITY SERVICES FISCAL YEAR 2026-2027 76 267003 Parks Master Plan CARRYOVER PROJECT PROJECT DESCRIPTION The current Master Plan for Park Facilities, Recreation, and Community Services is from 1999. This project will develop a parks and recreation masterplan to determine long-term strategies that will guide how the City’s community parks and recreation facilities are developed, maintained, and optimized. The comprehensive document covers a range of topics, including Vision, Needs assessment, Priorities, Policies, and a financial plan. The masterplan considers the City’s existing park system, facilities, and programs and will examine the community’s recreational, programming, environmental, and maintenance needs. Practices for creating the parks and recreation masterplan will include collecting qualitative and quantitative data, engaging the community, creating an action plan, and outlining a plan for funding. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2028 Funding Source(s): Park Acquisition (Infill)   *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY No future funding proposed. Powered by OpenGov CAPITAL IMPROVEMENT PROGRAM COMMUNITY SERVICES FISCAL YEAR 2026-2027 77 267004 Hart Park Bandshell Roof Renovation CARRYOVER PROJECT PROJECT DESCRIPTION The Hart Park Bandshell is a historic structure within Hart Park. Natural wear and tear and damage caused by a fallen tree limb have caused the need to repair the historic roof. This project will be a tile lift and relay which involves removing the existing tile layer and underlayment of the roof and then reinstalling the tiles. New tiles will be installed to replace any broken tiles. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2027 Funding Source(s): Park Acquisition (Infill)   *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY No future funding proposed. Powered by OpenGov CAPITAL IMPROVEMENT PROGRAM COMMUNITY SERVICES FISCAL YEAR 2026-2027 78 255008 Santiago Bike Trail Phase IV CARRYOVER PROJECT PROJECT DESCRIPTION This project is the final phase of the Santiago Creek Bike Trail alignment in the Master Bikeway Plan. Construction of the multi-purpose trail will connect the existing bike trail west of Cannon Street and parallel the existing equestrian trail on the northern bank and terminate at the Santiago Oaks Regional Park. The project will construct an asphalt concrete bike trail and rehabilitate the existing equestrian trail with decomposed granite along with needed amenities such as rest areas and trash receptacles. The trail will allow for pedestrian and bicycle traffic along an eight-mile stretch of trails. The City received funding sources from OCTA's BCIP Grant for this project's preliminary engineering and environmental costs. Estimated construction costs are $10 million. The City has pursued additional grants for the construction phase. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: December 2027 Funding Source(s): Capital Projects   *Project funding includes development impact fees. Funding is dependent on receipt of development revenue.   FINANCIAL SUMMARY No future funding proposed. Powered by OpenGov CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2026-2027 79 255016 Tustin St Signal Synchronization CARRYOVER PROJECT PROJECT DESCRIPTION The Tustin Street Traffic Signal Synchronization project a multi-jurisdictional project between First Street in Tustin and Wabash Avenue in Yorba Linda. The corridor is over eleven miles and includes 55 signals across seven jurisdictions. 25 of the signals are within the City of Orange. The benefits of signal synchronization include a reduction in travel time, improvement in travel speed, greenhouse gas reduction, less fuel consumption, and an overall better travel experience. This project will be led by City of Orange and primarily funded through OCTA's M2. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2027 Funding Source(s): City-Wide TSIP; Reimbursable Capital Projects   FINANCIAL SUMMARY No future funding proposed. Powered by OpenGov CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2026-2027 80 255022 Pedestrian Beacon Upgrades CARRYOVER PROJECT PROJECT DESCRIPTION This project will upgrade and modernize existing flashing beacon systems at several pedestrian crossings throughout the City. Existing beacons that either flash perpetually or must be manually activated/de-activated will be replaced with push buttons that will activate the beacons on demand. In addition, circular beacons will be upgraded to newer rapid rectangular flashing beacons, which are expected to enhance visibility to motorists. The project will also involve minor modifications to/refurbishment of ancillary equipment, roadway features, and traffic control devices, including, but not limited to, poles, pavement markings, signs, and curb ramps. PROJECT DETAILS Project Type: Ongoing Estimated Completion Date: Ongoing Funding Source(s): Capital Projects; Reimbursable Capital Projects   FINANCIAL SUMMARY No future funding proposed. Powered by OpenGov CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2026-2027 81 255030 East Walnut Ave Infrastructure Improvement CARRYOVER PROJECT PROJECT DESCRIPTION This project will construct a new 48” RCP storm drain line on Walnut Avenue from Cambridge Street to California Street per the Master Plan of Drainage to alleviate the localized flooding issue on Walnut Avenue during a 25-year or higher storm events. Other improvements include replacement of deficient sewer and water mains. In addition, Walnut Avenue from Cambridge Street to Tustin Street roadway pavement will be rehabilitated, and the existing concrete curb will be replaced with new concrete curb and gutter. The project also includes replacing damaged sidewalk, reconstructing existing ADA ramps to conform to federal guidelines, adjusting utility covers to grade, and restriping the roadway. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: December 2026 Funding Source(s): Water   FINANCIAL SUMMARY No future funding proposed. Powered by OpenGov CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2026-2027 82 255031 Cannon Street Bridge Widening CARRYOVER PROJECT PROJECT DESCRIPTION This project widens portions of Cannon Street from Santiago Canyon Road to Serrano Avenue to add a third northbound thru lane. The scope of work includes widening the bridge as well as the roadway north of the bridge in order to maintain the continuity of the thru lane until Serrano Avenue where it would get dropped into a dedicated right-turn lane to eastbound Serrano Avenue. The existing painted median will be replaced with a raised median. All improvements fall within the City of Orange public right-of-way except for a portion between Taft Avenue and Serrano Avenue which falls in City of Villa Park public right-of-way. Current funding is for the preliminary engineering and environmental phase of the project. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: August 2026 Funding Source(s): City-Wide TSIP   FINANCIAL SUMMARY No future funding proposed. Powered by OpenGov CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2026-2027 83 255038 Pixley Neighborhood and Walnut Street Rehabilitation CARRYOVER PROJECT PROJECT DESCRIPTION This project will rehabilitate Parker Street, Pixley Street, Foley Place, Clark Street, Marietta Avenue, Washington Avenue, and Walnut Avenue, which includes but is not limited to, asphalt concrete grinding and overlay, and adjustment of manholes and water valves to grade. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2025 Funding Source(s): Community Development Block Grant   FINANCIAL SUMMARY No future funding proposed. Powered by OpenGov CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2026-2027 84 255039 Riverdale Avenue Complete Street Improvements CARRYOVER PROJECT PROJECT DESCRIPTION This project’s scope of work includes the reconfiguration of Riverdale Avenue from Glassell Street to Orange City limits that allows for the installation of bike and pedestrian facilities, traffic calming strategies and curb space management. Bike and pedestrian facilities include the installation of buffered Class II bike lanes in both directions, installation of painted medians and turn lanes, installation of traffic signs including bike lane, wayfinding and SART access signage, installation of street trees, safety enhancements including street light installation, ADA improvements that include compliant curb access ramps at all intersections and a full build- out of roadway pavement, curb, gutter and sidewalk gap closure for the westbound segment between Orange Olive and Orange City Limits. Traffic calming improvements include consistent and narrowed traffic lanes from 15 feet to 11 feet and lane reductions from two lanes in each direction to one lane in each direction. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2027 Funding Source(s): Traffic Improvement - Measure M2; Reimbursable Capital Projects   FINANCIAL SUMMARY No future funding proposed. Powered by OpenGov CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2026-2027 85 255074 Kraemer Blvd/Glassell St/Grand Ave RTSSP CARRYOVER PROJECT PROJECT DESCRIPTION The Kraemer Boulevard/Glassell Street/Grand Avenue Regional Traffic Signal Synchronization Program Project (KGG RTSSP) is a multi-jurisdictional project between Lambert Road and Kraemer Boulevard in the City of Brea to Dyer Road and Grand Avenue in the City of Santa Ana. The KGG RTSSP covers 62 signals along the 15.1 mile long corridor within the cities of Brea, Placentia, Anaheim, Orange and Santa Ana. Of those signals, 18 are within the City of Orange. The project is part of OCTA's Measure M2 Project P - Regional Traffic Signal Synchronization Program. The benefits of signal synchronization include a reduction in travel time, improvement in travel speed, greenhouse gas reduction, less fuel consumption, and an overall better travel experience. This project will be led by City of Santa Ana and primarily funded through OCTA's M2. All agencies are required to provide a minimum of 20% matching cash funds. Primary implementation, including construction, is scheduled to be completed in June 2027. A two-year maintenance and operation phase will be initiated after completion of primary implementation. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2027 Funding Source(s): Traffic Improvement - Measure M2   FINANCIAL SUMMARY No future funding proposed. Powered by OpenGov CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2026-2027 86 255075 Walnut Avenue & Orange Street New Traffic Signal CARRYOVER PROJECT PROJECT DESCRIPTION This project will provide for a new traffic signal at the intersection of Walnut Avenue and Orange Street. The traffic signal will improve the overal flow and safety of the intersection, including managing the flow of vehicles entering and exiting Chapman University's Anderson Parking Structure. The project will include new traffic signal poles, controller and cabinet, video detection, safety lighting, enhanced traffic signs and pavement markings. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: December 2026 Funding Source(s): Reimbursable Capital Projects   FINANCIAL SUMMARY No future funding proposed. Powered by OpenGov CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2026-2027 87 255086 CDBG Street Improvements Fiscal Year 2025-26 CARRYOVER PROJECT PROJECT DESCRIPTION This project will rehabilitate Wheeler Street, Killingworths Avenue, and Highland Street which includes but is not limited to, cold planning (milling) the existing asphalt, asphalt concrete overlay installation, reconstruction of sidewalks, curb and gutters, cross gutters, spandrels, sidewalk access ramps, and corresponding adjustment of manholes and water valves to grade. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2027 Funding Source(s): Community Development Block Grant   FINANCIAL SUMMARY No future funding proposed. Powered by OpenGov CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2026-2027 88 255090 Citywide Active Transportation Plan CARRYOVER PROJECT PROJECT DESCRIPTION This project will develop an Active Transportation Plan by analyzing socioeconomic and crash data to provide recommendations to improve walking and biking conditions at high need areas throughout the City. Using technical data and robust public engagement with disadvantaged community members and the community at large, the plan will incorporate both infrastructure and non-infrastructure recommendations addressing equity, engagement, evaluation, encouragement, and education efforts. As part of this effort, the Citywide Active Transportation Plan will also update the City’s Bikeway Master Plan. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: August 2027 Funding Source(s): City-Wide TSIP; Reimbursable Capital Projects   FINANCIAL SUMMARY No future funding proposed. Powered by OpenGov CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2026-2027 89 255106 Cambridge St Infrastructure Improvement CARRYOVER PROJECT PROJECT DESCRIPTION This project will upsize the existing 18” RCP storm drain line from Palm Avenue to Walnut Avenue per the Master Plan of Drainage to alleviate localized flooding on Cambridge Street during 25-year or higher storm events. Other improvements include replacement of deficient sewer and water mains. In addition, Cambridge Street roadway pavement will be rehabilitated, and the existing concrete curb will be replaced with new concrete curb and gutter. The project also includes replacing damaged sidewalk, reconstructing existing ADA ramps to conform to federal guidelines, adjusting utility covers to grade, and restriping the roadway. Staff is seeking federal funding through Hazard Mitigation grant for construction phase. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: September 2027 Funding Source(s):   FINANCIAL SUMMARY No future funding proposed. Powered by OpenGov CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2026-2027 90 255703 Structural Evaluation of City Bridges CARRYOVER PROJECT PROJECT DESCRIPTION Currently, there are eight roadway bridges located throughout the City that require maintenance. Caltrans has inspected those bridges and has made recommendations for maintenance and repair. A maintenance and retrofit plan are ready for implementation. The City is waiting for Caltrans to program construction funding due to existing funding being no longer available. The project is expected to receive funding for construction phase in FY 26. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: December 2027 Funding Source(s): Gas Tax Maintenance, Reimbursable Capital Projects   FINANCIAL SUMMARY No future funding proposed. Powered by OpenGov CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2026-2027 91 266003 ADA Improvements CARRYOVER PROJECT PROJECT DESCRIPTION This project will modify curbs and ramps at various locations throughout the City to comply with the Americans with Disabilities Act (ADA) regulations. This has been an ongoing project, partially funded with Community Development Block Grants (CDBG). PROJECT DETAILS Project Type: Ongoing Estimated Completion Date: Ongoing Funding Source(s): Community Development Block Grant (CDBG)   FINANCIAL SUMMARY No future funding proposed. Powered by OpenGov CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2026-2027 92