FY 24 Draft Five-Year Capital Improvement Plan2 0 2 3 -2 4
FI RST BUDGET STUDY SESSION
MARCH 28, 2023
5 Y E A R C A P I T A L I M P R O V E M E N T P L A N
FY 2023-2024 Budget
Funding Source Summary …………………………………………………………………………… 1
City Clerk ………………………………………………………………………………………...……… 3
Community Development …………………………………………………………………………….. 7
Community Services ……………………………………………………………………………..….. 13
Economic Development …………………………………………………………………………...... 39
Fire Department ………………………………………………………………………………………. 43
Information Technology ………………………………………………………………………….…. 63
Library ………………………………………………………………………………………………..... 87
Police Department ……………………………………………………………………………………. 91
Public Works ……………………………………………………………………………………......... 95
Public Works – Water …………………………………………………………………..………….. 157
TABLE OF CONTENTS
THIS PAGE INTENTIONALLYLEFT BLANK
FY 2023-2024 Budget
2023-2024 2024-2025 2025-2026 2026-2027 2027-2028 5 Year Total
120 Prop 172 --370,500 175,000 -545,500
130 PEG Program 67,500 67,500 67,500 67,500 67,500 337,500
220 Sewer 800,000 1,000,000 1,000,000 1,000,000 1,000,000 4,800,000
245 Ab 2766 Air Pollution Reduction 86,000 ----86,000
263 Traffic Improvemnt -Measure M2 2,825,000 2,990,000 3,125,000 3,290,000 3,275,000 15,505,000
270 Gas Tax Maintenance 100,000 500,000 450,000 250,000 200,000 1,500,000
274 Rmra Road Maint Rehabilitation Account 3,000,000 3,400,000 3,500,000 3,600,000 3,700,000 17,200,000
310 Community Development Block Grant 1,120,542 68,430 68,430 68,430 68,430 1,394,262
317 Home 389,008 ----389,008
355 Asset Seizure- Federal 110,000 ----110,000
500 Capital Projects 4,892,730 2,915,000 2,915,000 1,990,000 1,990,000 14,702,730
510 Park Acquisition (Infill)1,335,450 313,000 ---1,648,450
520 Sewer Construction 2,367,750 2,438,783 2,511,946 2,587,304 2,664,923 12,570,706
550 Reimbursable Capital Projects 4,548,570 2,075,000 750,000 -100,000 7,366,570
553 Capital Bond Proceeds 2,000,000 ----2,000,000
555 Parking In Lieu 52,000 2,000 2,000 2,000 2,000 60,000
600 Water 5,600,000 5,700,000 5,900,000 6,000,000 6,250,000 29,450,000
720 Equipment Replacement 4,063,998 ----4,170,998
790 Computer Replacement 1,797,500 2,041,500 2,392,500 1,967,500 2,146,500 10,345,500
954 City Trf: Merged 2008 Tax Exempt Bonds 1,076,000 170,000 70,000 70,000 70,000 1,456,000
Total 36,232,048 23,681,213 23,122,876 21,067,734 21,534,353 125,638,224
Project
FUNDING SOURCE SUMMARY
1
THIS PAGE INTENTIONALLYLEFT BLANK
2
FY 2023-2024 Budget
2023-2024 2024-2025 2025-2026 2026-2027 2027-2028 5 Year Total
20528 Rolling File Cabinet Replacement 25,000 25,000 25,000 --75,000
Total 25,000 25,000 25,000 --75,000
Project
Project Summary
CITY CLERK
3
THIS PAGE INTENTIONALLYLEFT BLANK
4
20528 ROLLING FILE CABINET REPLACEMENT
PROJECT DESCRIPTION
Originally installed in 1988, the rolling file cabinet in the City Clerk's office is fully utilized in the City's records
management program. The cabinet offers 18 storage shelves, each measuring 7' 6" across and 16 inches
deep which rotate on a mechanical crank to save space. During December of 2022, the mechanical crank
failed and the shelves would no longer rotate. Olpin Group, who installed the system, also provides
maintenance and upon inspection determined the system is outdated will need to be replaced within the next
three years, with a total replacement cost estimated to be $60,000-$80,000. This project will fund the rolling
file cabinet replacement over the next three fiscal years.
PROJECT DETAILS
Project Type: One-Time
Estimated Completion Date: June 2026
Funding Source(s): Capital Projects
FINANCIAL SUMMARY
20528
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Capital projects funds
(500) Capital Projects $25,000 $25,000 $25,000 $0 $0
CAPITAL PROJECTS FUNDS TOTAL $25,000 $25,000 $25,000 $0 $0
TOTAL $25,000 $25,000 $25,000 $0 $0
CAPITAL IMPROVEMENT PROGRAM
CITY CLERK
FISCAL YEAR 2023-2024
5
THIS PAGE INTENTIONALLYLEFT BLANK
6
FY 2023-2024 Budget
2023-2024 2024-2025 2025-2026 2026-2027 2027-2028 5 Year Total
11210 Home CHDO Allocation 64,835 ----64,835
11250 Home Developer Projects 324,173 ----324,173
Total 389,008 ----389,008
Carryover Projects - No New Funding Requested
20482 Land Use Tracking and Permitting Software
Project
Project Summary
COMMUNITY DEVELOPMENT
7
THIS PAGE INTENTIONALLYLEFT BLANK
8
11210 HOME CHDO ALLOCATION
PROJECT DESCRIPTION
Federal HOME Investment Partnerships Program (HOME) funding set aside for Community Housing
Development Organizations (CHDOs). The City-designated CHDO is Orange Housing Development
Corporation (OHDC). The project is to be determined. Appropriation of HOME funds for housing projects is
subject to City Council approval.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): HOME
FINANCIAL SUMMARY
11210
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Special revenue fund
(317) Home $64,835 $0 $0 $0 $0
SPECIAL REVENUE FUND TOTAL $64,835 $0 $0 $0 $0
TOTAL $64,835 $0 $0 $0 $0
CAPITAL IMPROVEMENT PROGRAM
COMMUNITY DEVELOPMENT
FISCAL YEAR 2023-2024
9
11250 HOME DEVELOPER PROJECTS
PROJECT DESCRIPTION
Federal HOME Investment Partnerships (HOME) Program funding allocation for affordable housing
development projects. Housing development projects need to be determined. Appropriation of funds for
affordable housing projects is subject to City Council approval.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Home
FINANCIAL SUMMARY
11250
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Special revenue fund
(317) Home $324,173 $0 $0 $0 $0
SPECIAL REVENUE FUND TOTAL $324,173 $0 $0 $0 $0
TOTAL $324,173 $0 $0 $0 $0
CAPITAL IMPROVEMENT PROGRAM
COMMUNITY DEVELOPMENT
FISCAL YEAR 2023-2024
10
20482 LAND USE TRACKING AND PERMITTING
SOFTWARE
CARRYOVER PROJECT
PROJECT DESCRIPTION
The current permitting software used in Community Development was purchased in 2010. The system has
become outdated and does not have the functionality needed to meet the growing demands for multi-
department and system integration. This project proposes to upgrade the current permit tracking software to a
comprehensive, flexible, fully integrated system that will automate workflow and tracking services for land use,
building permits and other general permits, have online and mobile functionality, and act as a central portal for
internal and external stakeholders to meet the current and future needs of the City.
The project cost entails system set-up, information migration, training, and technical support. Any annual
maintenance cost will be included in the annual budget.
PROJECT DETAILS
Project Type: Ongoing
Starting Fiscal Year: 2020-2021
Funding Source(s): Building Records Management Fee; Computer Replacement
Total Budget: $1,000,000
CAPITAL IMPROVEMENT PROGRAM
COMMUNITY DEVELOPMENT
FISCAL YEAR 2023-2024
11
THIS PAGE INTENTIONALLYLEFT BLANK
12
FY 2023-2024 Budget
2023-2024 2024-2025 2025-2026 2026-2027 2027-2028 5 Year Total
20059 Tot Lot Shade Sails 223,000 223,000 ---446,000
20437 Park Signage Installation 60,000 90,000 ---150,000
20438 El Camino Real Park Exercise Equipment 692,450 ----692,450
20476 El Modena Basin Area Improvements 212,500 ----212,500
20513 New Park in West Orange 200,000 ----200,000
20519 Skate Park at Grijalva 1,750,000 ----1,750,000
20520 Cerro Villa Open Space Improvements 35,000 ----35,000
20521 Yorba Dog Park Improvements 125,000 ----125,000
Total 3,297,950 313,000 ---3,610,950
Carryover Projects - No New Funding Requested
20315 Hart Park Pickleball and Fitness Circuit
20321 Grijalva Master Plan Update
20435 Olive Park Kitchen Update
20440 Rubberized Tot Lot Surface Replacement
20448 Restroom Interior Upgrades
20475 Resurfacing Bike Trails and Walking Paths
20477 Area Lighting Replacement at Grijalva
20478 Evaluation of Synthetic Turf Installation at Grijalva Park
20506 Ball Field Netting
20507 Park Facility Roof Repairs
20508 Irrigation Booster Pump Replacement
20514 Mural at El Camino Real Park
30048 El Modena Park Area Renovation
30053 Parking Lot Pavement Rehab
30133 Hart Park Field Improvements
Project
Project Summary
COMMUNITY SERVICES
13
THIS PAGE INTENTIONALLYLEFT BLANK
14
20059 TOT LOT SHADE SAILS
PROJECT DESCRIPTION
As a long-standing City Council initiative, shade sails will be installed over existing tot-lot equipment in City
parks to protect users from sun exposure, as well as equipment that can become very hot during the warmer
months. There are currently shade sails over the tot-lots at the following parks: Belmont, El Camino, El
Modena, Fred Barrera, Grijalva, Handy, La Veta, Olive, Shaffer, Steve Ambriz, and Serrano. In FY 24, shade
sails will be installed at Eisenhower (2) and Killefer Parks. In FY 25, shade sails will be installed at Hart and
Santiago Hills Parks. Shade sails will be installed over all tot lots in City park after this project is complete.
PROJECT DETAILS
Project Type: One-Time
Estimated Completion Date: June 2024
Funding Source(s): Park Acquisition (Infill)
*Project funding includes development impact fees.
Funding is dependent on receipt of development
revenue.
FINANCIAL SUMMARY
20059
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Capital projects funds
(510) Park Acquisition (Infill)$223,000 $223,000 $0 $0 $0
CAPITAL PROJECTS FUNDS TOTAL $223,000 $223,000 $0 $0 $0
TOTAL $223,000 $223,000 $0 $0 $0
CAPITAL IMPROVEMENT PROGRAM
COMMUNITY SERVICES
FISCAL YEAR 2023-2024
15
20437 PARK SIGNAGE INSTALLATION
PROJECT DESCRIPTION
Park signage consists of two major types: monument signs and regulatory signs. Phase one of this project
consisted of replacing monument signs at Eisenhower (2), El Modena, El Modena Basin, Hart (2), La Veta,
and Killefer Parks in FY 23. Phase two of this project will include an evaluation of existing regulatory signage
and replacement of missing and/or damaged regulatory signs throughout City parks and bike trails.
Fabrication and installation of monument signs, new park rules signs, and bike trail rules signage was
completed in FY 23. Replacement of missing and/or damaged regulatory signs throughout City parks will
occur in FY 24. In FY 25, the City will make landscape improvements and construct new pilasters adjacent to
the new Hart Park monument sign located at the Glassell Street entrance.
PROJECT DETAILS
Project Type: One-Time
Estimated Completion Date: June 2025
Funding Source(s): Park Acquisition (Infill)
*Project funding includes development impact fees.
Funding is dependent on receipt of development
revenue.
FINANCIAL SUMMARY
20437
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Capital projects funds
(510) Park Acquisition (Infill)$60,000 $90,000 $0 $0 $0
CAPITAL PROJECTS FUNDS TOTAL $60,000 $90,000 $0 $0 $0
TOTAL $60,000 $90,000 $0 $0 $0
CAPITAL IMPROVEMENT PROGRAM
COMMUNITY SERVICES
FISCAL YEAR 2023-2024
16
20438 EL CAMINO REAL PARK EXERCISE
EQUIPMENT AND COURT IMPROVEMENTS
PROJECT DESCRIPTION
In Summer 2022, pickleball court overlay lines were painted on two of the tennis courts at El Camino Real Park.
Due to consistent use of the overlaid pickleball courts and requests from court users, this project would include
resurfacing of all court surfaces and permanently convert two of the existing tennis courts to multiple pickleball
courts.
The proposed project will also include other improvements to El Camino Real Park, including the design and
installation of a lighted, shaded exercise equipment circuit and new LED light fixtures for the existing
tennis/pickleball courts.
The project is currently scheduled to begin in FY 24. Staff will seek grant funding for this project to offset the
expense to the Park Acquisition (Infill) (510) fund.
PROJECT DETAILS
Project Type: One-Time
Estimated Completion Date: June 2024
Funding Source(s): Park Acquisition (Infill)
*Project funding includes development impact fees.
Funding is dependent on receipt of development
revenue.
FINANCIAL SUMMARY
20438
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Capital projects funds
(510) Park Acquisition (Infill)$692,450 $0 $0 $0 $0
CAPITAL PROJECTS FUNDS TOTAL $692,450 $0 $0 $0 $0
TOTAL $692,450 $0 $0 $0 $0
CAPITAL IMPROVEMENT PROGRAM
COMMUNITY SERVICES
FISCAL YEAR 2023-2024
17
20476 EL MODENA BASIN AREA IMPROVEMENTS
PROJECT DESCRIPTION
Through a 1973 use agreement with Orange County Flood Control District (OCFD), the City operates the El
Modena Basin located north of the intersection of S. Hewes St. and E. Jordan Ave. as a public park. Currently,
the El Modena Basin’s amenities include a walking path around the interior open space. This project would
provide area lighting to portions of the walking path and improve the walking path for an enhanced experience
and evaluate a location for a future prefabricated restroom building. The current funding includes costs to
design the project. Preliminary construction costs for lighting and irrigation are approximately $2 million and
installation of a restroom is estimated to be an additional $300,000-$400,000, depending on location of the
restroom. Staff will request an additional expense allocation for construction based on cost estimates after
design. Design and construction will require approval from and lease negotiations with OCFD. Funding for
construction will need to be identified.
PROJECT DETAILS
Project Type: One-Time
Starting Fiscal Year: 2020-2021
Estimated Completion Date: June 2025
Funding Source(s): Park Acquisition (Infill)
FINANCIAL SUMMARY
20476
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Special revenue fund
(310) Community Development Block Grant $212,500 $0 $0 $0 $0
SPECIAL REVENUE FUND TOTAL $212,500 $0 $0 $0 $0
TOTAL $212,500 $0 $0 $0 $0
CAPITAL IMPROVEMENT PROGRAM
COMMUNITY SERVICES
FISCAL YEAR 2023-2024
18
20513 NEW PARK IN WEST ORANGE
PROJECT DESCRIPTION
A 2.4-acre piece of property managed by Orange County Flood Control (OCFC) located on W. Chapman
between interstate 5 and the 57 freeway has been identified as a location for a new park on the west side of
the City. The property is immediately adjacent to the Santa Ana River and bike trail (hence the working title,
“Riverview Park”). Adjacent to this property is a proposed workforce housing project sponsored by BLDG
Partners. The City worked with BLDG Partners and Agora Partners on the feasibility of building a park on the
aforementioned site. Agora Partners completed a conceptual plan for a passive park in FY 23.
Based on the conceptual plan and feedback from the County, next steps include, completing an environmental
review, design, and construction. Design is anticipated to start in FY 24. Staff is working with OCFC to enter
into a long-term lease on the property. Funding for construction will need to be identified, which includes
exploring grant opportunities.
PROJECT DETAILS
Project Type: One-Time
Estimated Completion Date: June 2028
Funding Source(s): Park Acquisition (Infill)
*Project funding includes development impact fees.
Funding is dependent on receipt of development
revenue.
FINANCIAL SUMMARY
20513
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Capital projects funds
(510) Park Acquisition (Infill)$200,000 $0 $0 $0 $0
CAPITAL PROJECTS FUNDS TOTAL $200,000 $0 $0 $0 $0
TOTAL $200,000 $0 $0 $0 $0
CAPITAL IMPROVEMENT PROGRAM
COMMUNITY SERVICES
FISCAL YEAR 2023-2024
19
20519 SKATE PARK AT GRIJALVA
PROJECT DESCRIPTION
The City owns the 42-acre Grijalva Park site which is being developed in phases. In 2005, a Grijalva Park
Master Plan was developed for the remaining 27 acres which included a skate park. Consequently, a skate
park was evaluated as part of the corresponding Mitigated Negative Declaration for the Grijalva Master Plan.
Therefore, the environmental review for this project is complete. At the City Council meeting of November 15,
2022, the City Council directed staff to use $1.75 million in park development fees collected from a housing
development in the east side of Orange known as Orange Heights to build a skate park at Grijalva park.
Project design will begin in the fall of 2023 and will include input from the City’s partner, Contenders Board
Shop. Construction is anticipated to begin in FY 25.
PROJECT DETAILS
Project Type: One-Time
Estimated Completion Date: June 2025
Funding Source(s): Capital Projects
FINANCIAL SUMMARY
20519
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Capital projects funds
(500) Capital Projects $1,750,000 $0 $0 $0 $0
CAPITAL PROJECTS FUNDS TOTAL $1,750,000 $0 $0 $0 $0
TOTAL $1,750,000 $0 $0 $0 $0
CAPITAL IMPROVEMENT PROGRAM
COMMUNITY SERVICES
FISCAL YEAR 2023-2024
20
20520 CERRO VILLA OPEN SPACE
IMPROVEMENTS
PROJECT DESCRIPTION
The City owns the Cerro Villa open space as a result of public benefit provided by the adjacent development in
1972. For the past 51 years, the area has been maintained as an open space park. This project would
enhance the space by installing a new pedestrian gate, natural material entry path, trash receptacle, minimal
signage, and natural material mile markers along the existing footpath. Additionally, the project would evaluate
the potential to install benches.
PROJECT DETAILS
Project Type: One-Time
Estimated Completion Date: June 2024
Funding Source(s): Park Acquisition (Infill)
*Project funding includes development impact fees.
Funding is dependent on receipt of development
revenue.
FINANCIAL SUMMARY
20520
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Capital projects funds
(510) Park Acquisition (Infill)$35,000 $0 $0 $0 $0
CAPITAL PROJECTS FUNDS TOTAL $35,000 $0 $0 $0 $0
TOTAL $35,000 $0 $0 $0 $0
CAPITAL IMPROVEMENT PROGRAM
COMMUNITY SERVICES
FISCAL YEAR 2023-2024
21
20521 YORBA DOG PARK IMPROVEMENTS
PROJECT DESCRIPTION
The dog park at Yorba Park currently uses a system of decomposed granite (DG) entry paths. Compaction of
the DG is difficult to maintain due to foot traffic in and out of the dog park areas, causing the DG to become
loose and uneven, which creates tripping hazards. The loose DG also enters the drainage system, causing
blockages and reoccurring maintenance issues. At the request of the Orange Dog Park Association, staff
evaluated options for improving this area. This project will replace the DG with new concrete walkways. In
addition, the project includes related irrigation and turf repairs. Installation of concrete walkways will reduce
overall ongoing maintenance costs.
PROJECT DETAILS
Project Type: One-Time
Estimated Completion Date: June 2024
Funding Source(s): Park Acquisition (Infill)
*Project funding includes development impact fees.
Funding is dependent on receipt of development
revenue.
FINANCIAL SUMMARY
20521
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Capital projects funds
(510) Park Acquisition (Infill)$125,000 $0 $0 $0 $0
CAPITAL PROJECTS FUNDS TOTAL $125,000 $0 $0 $0 $0
TOTAL $125,000 $0 $0 $0 $0
CAPITAL IMPROVEMENT PROGRAM
COMMUNITY SERVICES
FISCAL YEAR 2023-2024
22
20315 HART PARK PICKLEBALL AND FITNESS
CIRCUIT
CARRYOVER PROJECT
PROJECT DESCRIPTION
The proposed pickleball facility and fitness circuit will be designed to fulfill the recreational needs of the
surging pickleball community, as well as provide a space for passive walking and exercise. The new facilities
will be located in the southwest portion of the park, adjacent to the existing orange grove to create a unique
setting overlooking the park. Proposed facility amenities will include multiple lighted pickleball courts, shaded
outdoor fitness equipment, area and pathway lighting, paved access to courts and amenities, shaded
spectator seating, spaces for gathering, fencing, wind screens, benches, drinking fountains, trash receptacles,
bike racks, landscaping, and signage. In FY 22, Congressman Lou Correa secured $2 million in federal FY 22
Community Projects Funding for this project. The City committed $750,000 to the project as well.
The project includes multiple phases beginning with project design. In FY 23, the City contracted with a
qualified landscape architect to complete the design ties, which will take several months to complete. The
design phase will include completing any required environmental review and opportunities for public input,
including discussion at a Park Planning and Community Events Commission meeting. Following the design
process, the City will enter the construction phase in FY 24.
PROJECT DESCRIPTION
Project Type: One-Time
Starting Fiscal Year: 2016-2017
Estimated Completion Date: June 2027
Funding Source(s): Park Acquisition (Infill); Park
Acquisition & Development (Quimby); Reimbursable
Capital Projects
Total Budget: $2,750,000
CAPITAL IMPROVEMENT PROGRAM
COMMUNITY SERVICES
FISCAL YEAR 2023-2024
23
20321 GRIJALVA PARK MASTER PLAN UPDATE
CARRYOVER PROJECT
PROJECT DESCRIPTION
The City owns the 42-acre Grijalva Park site which is being developed in phases. In 2003, Phase I was
completed and included an active park with soccer fields, a tot lot, and a small activity room. In 2005, a Grijalva
Park Master Plan was developed for the remaining 27 acres which included a sports center/gymnasium, skate
park, amphitheater, additional restrooms, picnic facilities, an aquatics center, and additional parking. In 2011, the
Sports Center at Grijalva Park was opened, along with adjacent parking. Nine acres remained undeveloped. In
2019, City Council gave their support for four community partners to fundraise to develop the vacant property.
Amenities potentially included a skate park, aquatics center, arts theater, and community/library/senior center. In
November 2022, the City Council approved funding for the skate park portion of the project. This project will be
developed as a separate CIP.
Given that the locations identified for these new amenities are currently undeveloped land sitting atop a former
landfill, any potential project at this site may require California Environmental Quality Act (CEQA) review.
Additional planning and site testing may be required as the City explores these partnership opportunities.
PROJECT DETAILS
Project Type: One-Time
Starting Fiscal Year: 2016-2017
Estimated Completion Date: June 2024
Funding Source(s): Park Acquisition (Infill)
Total Budget: $100,000
CAPITAL IMPROVEMENT PROGRAM
COMMUNITY SERVICES
FISCAL YEAR 2023-2024
24
20435 OLIVE PARK KITCHEN UPDATE
CARRYOVER PROJECT
PROJECT DESCRIPTION
Olive Park is an 8.02-acre property and was acquired in 1975. The park features a community building, which
can accommodate up to 75 guests and is reservable for private functions. In FY 19, there were 130 bookings,
servicing approximately 8,000 park visitors. The facility’s popularity is due in part to its kitchen, which has not
been updated since its original construction. Due to its age and heavy use, the kitchen is in need of an update.
The project scope includes resurfacing the cabinets, replacing the countertops, and painting.
PROJECT DETAILS
Project Type: One-Time
Starting Fiscal Year: 2019-2020
Estimated Completion Date: June 2024
Funding Source(s): Park Acquisition (Infill)
Total Budget: $50,000*
CAPITAL IMPROVEMENT PROGRAM
COMMUNITY SERVICES
FISCAL YEAR 2023-2024
25
20440 RUBBERIZED TOT LOT SURFACE
REPLACEMENT
CARRYOVER PROJECT
PROJECT DESCRIPTION
Tot lot rubberized surfaces are installed to ensure playground safety, allow for ADA accessibility, and are an
aesthetic asset to park facilities. These surfaces have a longevity of approximately 10 years with proper
maintenance and care. The rubberized surface at the tot lot at Serrano Park was installed in 2011 and is now
due for replacement. This project is scheduled to be completed in FY 24. In addition to this project, the City
will replace the current engineered wood fiber safety surfacing at El Modena Park with rubberized surfacing.
Though this is a separate project to be completed through the El Modena Area Renovation Project (# 30048),
the resurfacing at Serrano Park will coincide with the installation at El Modena Park.
PROJECT DETAILS
Project Type: One-Time
Starting Fiscal Year: 2019-2020
Estimated Completion Date: June 2024
Funding Source(s): Park Acquisition (Infill)
Total Budget: $47,750
CAPITAL IMPROVEMENT PROGRAM
COMMUNITY SERVICES
FISCAL YEAR 2023-2024
26
20448 RESTROOM INTERIOR UPGRADES
CARRYOVER PROJECT
PROJECT DESCRIPTION
Nineteen of the City’s parks have restroom buildings, both interior and exterior. Many of these restrooms were
last renovated 15 to 20 years ago and are in need of evaluation to ensure the restrooms are functional and an
attractive space for public use. This project will involve initial evaluation of the current state of all restrooms at
City park facilities in FY 24 and renovation of facilities that are past their useful life or are in need of an update in
subsequent years. A specific scope will be developed for each restroom building depending on individual
needs. Preliminary cost estimates for construction are $1.3 million. Staff will request an additional allocation
based on cost estimates following the evaluation.
PROJECT DETAILS
Project Type: One-Time
Starting Fiscal Year: 2019-2020
Estimated Completion Date: June 2024
Funding Source(s): Park Acquisition (Infill)
Total Budget: $50,000
CAPITAL IMPROVEMENT PROGRAM
COMMUNITY SERVICES
FISCAL YEAR 2023-2024
27
20475 RESURFACING BIKE TRAILS AND WALKING
PATHS
CARRYOVER PROJECT
PROJECT DESCRIPTION
Several areas and sections of City bike trails and adjacent walking paths are degraded and in need of
maintenance/repair. In FY 22, the City completed an evaluation of specific areas of trails and walking paths
and developed a scope of work for the project to include crack sealing, slurry seal and re-stripe, and removal
and replacement of asphalt as required. Areas evaluated included:
Maintenance and repair work is anticipated to be completed in FY 24.
City-owned portions of the Santiago Creek Bike Trail between Hart Park and Cannon St.1.
The bike trail adjacent to the El Modena open space on Cannon St.2.
The asphalt walking paths within Hart Park including the pavement near the existing tennis courts and
the pavement in the area directly behind and to the east of Baseball Field 1.
3.
PROJECT DETAILS
Project Type: One-Time
Starting Fiscal Year: 2020-2021
Estimated Completion Date: June 2024
Funding Source(s): Park Acquisition (Infill); Park
Acquisition & Development (Quimby)
Total Budget: $402,019
*Project funding includes development impact
fees. Funding is dependent on receipt of de-
velopment revenue.
CAPITAL IMPROVEMENT PROGRAM
COMMUNITY SERVICES
FISCAL YEAR 2023-2024
28
20477 AREA LIGHTING REPLACEMENT AT
GRIJALVA PARK
CARRYOVER PROJECT
PROJECT DESCRIPTION
Currently, there are a total of 54 light poles providing area/pathway lighting for Grijalva Park (side A). The
lighting was designed with metal poles mounted on concrete foundations at ground level. Deterioration near
the base of these poles has resulted in the need to replace several light poles in past years. Despite past
measures taken to protect the poles, deterioration continues due to continued corrosion. Several light poles
have now been removed, including two which came down during heavy winds. Nine poles in total have been
removed due to safety concerns and all others are being evaluated regularly. The objective of this project is to
replace all the area lighting to include new poles and fixtures, designed to resist corrosion.
In FY 23, the City contracted with a design/engineering firm to provide design specifications and construction
documents for the replacement of the lighting. The design was completed in FY 23 and construction is
scheduled to be completed in FY 24. Additionally, this project will be partially funded through the Per Capita
Allocation program funded through Prop 68.
PROJECT DETAILS
Project Type: One-Time
Starting Fiscal Year: 2020-2021
Estimated Completion Date: June 2024
Funding Source(s): Park Acquisition (Infill);
Reimbursable Capital Projects
Total Budget: $614,400
*Project funding includes development impact fees.
Funding is dependent on receipt of development
revenue.
CAPITAL IMPROVEMENT PROGRAM
COMMUNITY SERVICES
FISCAL YEAR 2023-2024
29
20478 EVALUATION OF SYNTHETIC TURF
INSTALLATION - GRIJALVA PARK
CARRYOVER PROJECT
PROJECT DESCRIPTION
As noted in the Department’s Parks Master Plan, the number one deficiency is the supply of lighted soccer
fields. Acquiring new land for construction of new soccer fields within the City is difficult and cost prohibitive. In
an effort to provide the much needed additional playing fields and programming, the City is considering
converting three existing natural turf fields at Grijalva Park to synthetic turf. Synthetic turf fields don’t require
extensive closures for annual maintenance or renovation due to rain and/or compaction. Because the existing
turf soccer fields were built on top of a former landfill, staff is conducting a feasibility study and site testing to
identify the feasibility and best plan for implementation of the synthetic field conversion. Design and
construction would be part of a future CIP depending on the results of the feasibility study.
PROJECT DETAILS
Project Type: One-Time
Starting Fiscal Year: 2020-2021
Estimated Completion Date: June 2024
Funding Source(s): Park Acquisition (Infill)
Total Budget: $164,770
*Project funding includes development impact fees.
Funding is dependent on receipt of development
revenue.
CAPITAL IMPROVEMENT PROGRAM
COMMUNITY SERVICES
FISCAL YEAR 2023-2024
30
20506 BALL FIELD NETTING
CARRYOVER PROJECT
PROJECT DESCRIPTION
The City has active baseball and softball fields at 9 of its 22 parks (El Camino Real, El Modena, Handy, Hart,
Killefer, McPherson, Olive, Shaffer, and Steve Ambriz Parks). Many of these ballfields are located adjacent to
residential housing, creating safety and liability concerns due to foul balls. In FY 23, staff hired a consultant to
provide an assessment of the ballfields at all 9 park locations to determine the need for field netting. The
assessments proposed that ball field netting is needed at without netting at the following three parks: El
Modena, McPherson, and Steve Ambriz Park.
Through a separate CIP project titled Hart Park Field Improvements (project # 30133), the City and its
partners (Chapman University and Orange Lutheran High School) will install foul ball netting along the first and
third baselines to protect the perimeter from foul balls at Diamond 1 located at Hart Park.
PROJECT DETAILS
Project Type: One-Time
Starting Fiscal Year: 2021-2022
Estimated Completion Date: June 2024
Funding Source(s): Park Acquisition (Infill)
Total Budget: $1,420,900
*Project funding includes development impact fees.
Funding is dependent on receipt of development
revenue.
CAPITAL IMPROVEMENT PROGRAM
COMMUNITY SERVICES
FISCAL YEAR 2023-2024
31
20507 PARK FACILITY ROOF REPAIRS
CARRYOVER PROJECT
PROJECT DESCRIPTION
Maintenance of the roofs on park buildings is critical to the overall preservation of the buildings. Most park
building roofs are generally in good to fair condition due to ongoing replacement efforts over the last several
years. In 2021, the City evaluated the facility roofs at the restroom and picnic pavilion at La Veta Park, the
picnic pavilion at Olive Park, and the restroom building at Santiago Hills Park, in addition to the snack bar
facility maintained by the City at Sycamore Elementary School. These evaluations revealed that each facility
roof requires some level of reroofing. This project will conduct necessary re-roofing at all these facilities.
PROJECT DETAILS
Project Type: One-Time
Starting Fiscal Year: 2021-2022
Estimated Completion Date: June 2024
Funding Source(s): Park Acquisition (Infill)
Total Budget: $322,710
*Project funding includes development impact fees.
Funding is dependent on receipt of development revenue.
CAPITAL IMPROVEMENT PROGRAM
COMMUNITY SERVICES
FISCAL YEAR 2023-2024
32
20508 IRRIGATION BOOSTER PUMP
REPLACEMENT
CARRYOVER PROJECT
PROJECT DESCRIPTION
The irrigation booster pump at El Camino Real Park assists in increasing water pressure and flow to the park's
irrigation system. The existing pump is creating a water hammer effect, causing mainline breaks in the past.
The current pump is failing and is beyond repair. This project would replace the booster pump to ensure that
the irrigation system receives the proper water pressure and flow.
PROJECT DETAILS
Project Type: One-Time
Starting Fiscal Year: 2021-2022
Estimated Completion Date: June 2023
Funding Source(s): Park Acquisition (Infill)
Total Budget: $120,680
*Project funding includes development impact fees.
Funding is dependent on receipt of development
revenue.
CAPITAL IMPROVEMENT PROGRAM
COMMUNITY SERVICES
FISCAL YEAR 2023-2024
33
20514 MURAL AT EL CAMINO REAL PARK
CARRYOVER PROJECT
PROJECT DESCRIPTION
This project will create a mural on the east and west side of the handball courts at El Camino Real Park. The
project will occur in phases. Phase 1 consists of staff led community outreach efforts to collect input on
design.
Phase 2 includes developing a scope of work and a request for proposal (RFP) based on the community’s
input to select a qualified artist. The final phase includes installation of the mural and treatment of the new
public art with an anti-graffiti coating. Funding for Phase 1 has been identified. Funding for the artist selection,
design, installation, and graffiti coating treatment has not been identified; however, staff will work with the
community member who brought forward the request to identify sponsors, donations, or grants to fund the
remaining phases.
Note: The included photo serves as an example, and does not depict the actual artwork.
PROJECT DETAILS
Project Type: One-Time
Starting Fiscal Year: 2022-2023
Estimated Completion Date: June 2027
Funding Source(s): Park Acquisition (Infill);
Reimbursable Capital Projects
Total Budget: $2,500
CAPITAL IMPROVEMENT PROGRAM
COMMUNITY SERVICES
FISCAL YEAR 2023-2024
34
30048 EL MODENA PARK AREA RENOVATION
CARRYOVER PROJECT
PROJECT DESCRIPTION
El Modena Park was constructed in the early 1970s and several amenities are in need of repair in order to
maintain a safe and functional park environment for patrons. A phased maintenance renovation will include
irrigation improvements, tot lot shade sails, rubberized surfacing at the tot lot, and asphalt, concrete, and
drainage repairs to the parking lot. Phase 1 was completed in FY 23 and included the irrigation improvements
and installation of the tot lot shade structure. Phase 2, installation of rubberized surfacing at the tot lot, will be
completed in FY 24 and will be completed in conjunction with resurfacing of the rubberized surface at Serrano
through project # 20440. Additional phases will be developed as funding is available.
PROJECT DETAILS
Project Type: Ongoing
Starting Fiscal Year: 2013-2014
Funding Source(s): El Modena Park Facility - Cell
Tower Fee
Total Budget: $638,092
CAPITAL IMPROVEMENT PROGRAM
COMMUNITY SERVICES
FISCAL YEAR 2023-2024
35
30053 PARKING LOT PAVEMENT REHABILITATION
CARRYOVER PROJECT
PROJECT DESCRIPTION
The asphalt parking lot pavement in the parks are in various stages of degradation and will require protective
measures over the next several years. Some lots require complete removal and replacement of asphalt
pavement, some can be ground down and capped with new asphalt, and other lots require slurry coating and
new striping to protect them from further degradation. Lots were prioritized according to condition. Successful
rehabilitations were completed as follows: Killefer parking lot in FY 17, Eisenhower and El Camino parking lots in
FY 19, and Olive and Grijalva parking lots in FY 21. The parking lot at Handy Park was incorporated into the
Handy Park Maintenance Renovation project and was completed in FY 22. The City evaluated the parking lots at
Fred Barrera, McPherson, Serrano, and Santiago Hills Park in FY 22. Design began in FY 23 and construction is
scheduled to be completed at all four park locations in FY 24. The project will be ongoing and future locations
will be identified through site evaluations of the remaining Park parking lots in later years.
PROJECT DETAILS
Project Type: Ongoing
Starting Fiscal Year: 2013-2014
Funding Source(s): Park Acquisition (Infill); El Modena Park Facility - Cell Tower Fee
Total Budget: $1,175,600
*Project funding includes development impact fees. Funding is dependent on receipt of development revenue.
CAPITAL IMPROVEMENT PROGRAM
COMMUNITY SERVICES
FISCAL YEAR 2023-2024
36
30133 HART PARK DIAMOND 1 FIELD
IMPROVEMENTS
CARRYOVER PROJECT
PROJECT DESCRIPTION
Located at Hart Park, Diamond 1 is used as a collegiate level playing baseball field. Currently, the City
partners with Chapman University and Orange Lutheran High School to maintain this premier field. Installation
of ball field netting along the first and third base foul lines will protect park users and the adjacent
neighborhood from foul balls. The City is working with Chapman University to approve a design for fencing
and netting for this field. Additionally, new LED field lighting will be an option considered as a part of the
overall improvements. The City will manage and oversee the project and will allocate the total amount of the
project cost once a scope is identified. The City will work with the two regular users for reimbursement per
percentage of use, to be negotiated before award of construction.
PROJECT DETAILS
Project Type: One-Time
Starting Fiscal Year: 2019-2020
Estimated Completion Date: June 2025
Funding Source(s): Park Acquisition (Infill);
Reimbursable Capital Projects
Total Budget: $250,000
*Project funding includes development impact fees.
Funding is dependent on receipt of development
revenue.
CAPITAL IMPROVEMENT PROGRAM
COMMUNITY SERVICES
FISCAL YEAR 2023-2024
37
THIS PAGE INTENTIONALLYLEFT BLANK
38
FY 2023-2024 Budget
Carryover Projects - No New Funding Requested
20247 SOARA Capital Projects
Project Summary
ECONOMIC DEVELOPMENT
39
THIS PAGE INTENTIONALLYLEFT BLANK
40
20247 SOARA CAPITAL PROJECTS
CARRYOVER PROJECT
PROJECT DESCRIPTION
In October 2014, the State Department of Finance approved a Bond Proceeds Funding Agreement in which the
remaining redevelopment bond proceeds were approved for transfer to the City during the ROPS 14-15B period.
This Agreement authorizes the City to expend the redevelopment bond proceeds in a manner that is consistent
with the original bond covenants and of benefit to the Orange Merged and Amended Redevelopment Project
Area, including public infrastructure improvements.
PROJECT DETAILS
Project Type: One-Time
Starting Fiscal Year: 2014-2015
Estimated Completion Date: June 2024
Funding Source(s): City Trf: Tustin Project - Taxable Bonds; City Trf: Nw & Sw Merged 2003 Taxable Bonds;
City Trf: Nw & Sw Merged 2003 Tax Exempt; City Trf: Merged 2008 Tax Exempt Bonds
Total Budget: $10,189,917
CAPITAL IMPROVEMENT PROGRAM
ECONOMIC DEVELOPMENT
FISCAL YEAR 2023-2024
41
THIS PAGE INTENTIONALLYLEFT BLANK
42
FY 2023-2024 Budget
2023-2024 2024-2025 2025-2026 2026-2027 2027-2028 5 Year Total
12506 Body Armor --60,000 --60,000
12955 Mobile Data Computers -119,000 --119,000 238,000
20105 Automatic Chest Compression Device ---175,000 -175,000
20166 EMS Gurney Replacement --60,000 --60,000
20169 WMD-DuoDote Autoinjector Replacement --30,500 --30,500
20502 Fire Station Apparatus Bay Door --220,000 --220,000
Total -119,000 370,500 175,000 119,000 783,500
Carryover Projects - No New Funding Requested
20104 SCBA Retrofit & Replacement
20501 USAR Tools and Equipment Replacement
20505 Fire Station 5 Work Out Room Addition
Project
Project Summary
FIRE DEPARTMENT
43
FY 2023-2024 Budget
2023-2024 2024-2025 2025-2026 2026-2027 2027-2028 5 Year Total
12406 Signal Pre-Emption Installation 40,000 40,000 40,000 40,000 40,000 200,000
12540 Thermal Image Cameras -250,000 ---250,000
12955 Mobile Data Computers -119,000 --119,000 238,000
20124 Turnout Replc/1851 Cleaning 90,000 95,000 95,000 100,000 100,000 480,000
20171 EPCR Replacement Program 65,000 -70,000 -70,000 205,000
20334 Fire Station Maint & Renov 50,000 50,000 50,000 50,000 50,000 250,000
20384 Vehicle Extrication Tool 75,000 ----75,000
20393 Defibrillator, AED and Battery Replacement 250,000 250,000 250,000 250,000 -1,000,000
30032 Wellness Equipment Replacement -45,000 -45,000 -90,000
Total 570,000 849,000 505,000 485,000 379,000 2,788,000
Developer Impact Fee Projects
FIRE DEPARTMENT
Project
Funding for the below projects includes development impact fees and is dependent on receipt of development revenue.
44
12406 SIGNAL PRE-EMPTION INSTALLATION
PROJECT DESCRIPTION
The Opticom Traffic Pre-emption project involves the purchase and installation of traffic signal pre-emption
equipment on the City’s major roadways, intersections, and fire apparatus. Pre-emption equipment installed on
fire apparatus triggers the associated equipment within traffic signals to control signal lights for oncoming fire
apparatus right-of-way during Code 3 responses. The first step of the project was completed and included the
installation of infrared technology in all signals along Chapman Avenue and 23 Fire Department vehicles.
Additional installations were performed for select signals on Chapman, Tustin, Main, Katella, Taft, Glassell,
Batavia, Collins, State College/City Drive, Lincoln and Santiago. Pre-emption equipment installations are
coordinated with Public Works and the Traffic Division during scheduled improvements to intersections. The
second step of the project was completed and involved the installation and retrofit of updated global positioning
system (GPS) signal pre-emption equipment. This equipment activates signal pre-emption based on estimated
time of arrival or distance by fire apparatus which prioritizes right-of-way during multiple unit responses.
Approximately three to four signals are retrofitted annually as an ongoing project at a cost of $40,000.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Fire Facility Fee Districts All Com
6/07*
*Project funding includes development impact fees.
Funding is dependent on receipt of development
revenue.
FINANCIAL SUMMARY
12406
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Capital projects funds
(560) Fire Facility Fee Districts All Com 6/07 $40,000 $40,000 $40,000 $40,000 $40,000
CAPITAL PROJECTS FUNDS TOTAL $40,000 $40,000 $40,000 $40,000 $40,000
TOTAL $40,000 $40,000 $40,000 $40,000 $40,000
CAPITAL IMPROVEMENT PROGRAM
FIRE DEPARTMENT
FISCAL YEAR 2023-2024
45
12506 BODY ARMOR
PROJECT DESCRIPTION
Replacement program for body armor and supplemental associated equipment. Fire Department body armor
consists of a ballistic style protective helmet and a chest-worn ballistic body vest. The project objective is to
provide fire suppression personnel with body armor and supporting equipment during "active shooter" and
"civil disturbance" type responses. As part of this program, ballistic helmets were purchased in FY 15 along
with supplemental individual first aid kits (IFAK). The IFAK equipment is required per the Orange County
Annex Plan. Body armor equipment has a useful life of seven years. Approximately two-thirds of the ballistic
equipment was replaced in FY 19 utilizing UASI Grant funds. In FY 21, CIP funds were used to complete the
current inventory, which provides one set of body armor per post position, on each emergency apparatus.
Next body armor replacement anticipated in FY 26.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Capital Projects; Prop 172
FINANCIAL SUMMARY
12506
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Special revenue fund
(120) Prop 172 $0 $0 $60,000 $0 $0
SPECIAL REVENUE FUND TOTAL $0 $0 $60,000 $0 $0
TOTAL $0 $0 $60,000 $0 $0
CAPITAL IMPROVEMENT PROGRAM
FIRE DEPARTMENT
FISCAL YEAR 2023-2024
46
12540 THERMAL IMAGE CAMERAS
PROJECT DESCRIPTION
Six-year replacement program for Thermal Imaging Cameras (TICs). The project objective is to maintain a
reliable and serviceable stock of TICs in the Fire Department. Useful life of current TICs is six years. The new
cameras replace the older units, which after repairs over the years gradually lose their effectiveness. In some
cases, the needed parts for repairs are no longer supported by the manufacturer. The Fire Department
purchased new TICs in 2018. Next TIC replacement anticipated in FY 25.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Fire Facility Fee Districts All Com
6/07*
*Project funding includes development impact fees.
Funding is dependent on receipt of development
revenue.
FINANCIAL SUMMARY
12540
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Capital projects funds
(560) Fire Facility Fee Districts All Com 6/07 $0 $250,000 $0 $0 $0
CAPITAL PROJECTS FUNDS TOTAL $0 $250,000 $0 $0 $0
TOTAL $0 $250,000 $0 $0 $0
CAPITAL IMPROVEMENT PROGRAM
FIRE DEPARTMENT
FISCAL YEAR 2023-2024
47
12955 MOBILE DATA COMPUTERS
PROJECT DESCRIPTION
Replace 32 mobile data computers (MDC) every three years. MDC technology is continuously being improved
and updated. MDCs require periodic replacement in order to maintain compatibility with dispatch centers,
Automatic Vehicle Locator (AVL), and portable notebooks. The MDC equipment was last replaced in FY 20. Next
MDC replacement anticipated in FY 25.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Fire Facility Fee Districts All Com
6/07; Computer Replacement
*Project funding includes development impact fees.
Funding is dependent on receipt of development
revenue.
FINANCIAL SUMMARY
12955
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Internal service funds
(790) Computer Replacement $0 $119,000 $0 $0 $119,000
INTERNAL SERVICE FUNDS TOTAL $0 $119,000 $0 $0 $119,000
Capital projects funds
(560) Fire Facility Fee Districts All Com 6/07 $0 $119,000 $0 $0 $119,000
CAPITAL PROJECTS FUNDS TOTAL $0 $119,000 $0 $0 $119,000
TOTAL $0 $238,000 $0 $0 $238,000
CAPITAL IMPROVEMENT PROGRAM
FIRE DEPARTMENT
FISCAL YEAR 2023-2024
48
20105 AUTOMATIC CHEST COMPRESSION
DEVICE
PROJECT DESCRIPTION
Purchase ten Autopulse Automatic Chest Compression Devices (ACCD) and provide replacement of ACCDs
every five years thereafter. The project objective is to maintain a reliable and serviceable stock of ACCDs in the
Fire Department and adhere to OCEMS Policy #325.00, which would increase the number of ACCDs from five to
ten and redistributed from the four rescue ambulances to the seven engines and two trucks. Useful life of current
ACCDs is five years. The new machines replace the older units, which after repairs over the years gradually lose
their effectiveness. In some cases, the needed parts for repairs are no longer supported by the manufacturer.
The last replacement of ACCD equipment was in FY 22. Next ACCD replacement anticipated in FY 27.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Fire Facility Fee Districts All Com
6/07; Proposition 172
FINANCIAL SUMMARY
20105
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Special revenue fund
(120) Prop 172 $0 $0 $0 $175,000 $0
SPECIAL REVENUE FUND TOTAL $0 $0 $0 $175,000 $0
TOTAL $0 $0 $0 $175,000 $0
CAPITAL IMPROVEMENT PROGRAM
FIRE DEPARTMENT
FISCAL YEAR 2023-2024
49
20124 TURNOUT EQUIPPING & REPLACEMENT
PROJECT DESCRIPTION
This project provides the funding to purchase turnout safety gear for new recruits and replace turnouts for 108
fire suppression personnel and seven administrative staff members as they become damaged or have
reached their life expectancy of ten years. It also provides funding for annual cleaning and inspection of 230
sets of turnout gear in accordance with NFPA 1851 standards. The average cost of safety gear is $8,500 per
person. Ongoing annual maintenance and inspection costs of approximately $15,000 are already included as
part of the operating budget. The replacement cycle to capture existing turnout equipment expiration dates is
ongoing.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Fire Facility Fee Districts All Com
6/07*
*Project funding includes development impact fees.
Funding is dependent on receipt of development
revenue.
FINANCIAL SUMMARY
20124
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Capital projects funds
(560) Fire Facility Fee Districts All Com 6/07 $90,000 $95,000 $95,000 $100,000 $100,000
CAPITAL PROJECTS FUNDS TOTAL $90,000 $95,000 $95,000 $100,000 $100,000
TOTAL $90,000 $95,000 $95,000 $100,000 $100,000
CAPITAL IMPROVEMENT PROGRAM
FIRE DEPARTMENT
FISCAL YEAR 2023-2024
50
20166 EMS GURNEY REPLACEMENT
PROJECT DESCRIPTION
Replace Emergency Medical Services (EMS) gurneys as they reach the end of their ten year service life. Current
EMS gurneys are battery-operated devices which move EMS patients from an emergency incident to the rear of
the Rescue Ambulance. These gurneys provide total patient lifting assistance for fire personnel, which reduces
workplace injuries. This project includes the replacement of two gurneys that have reached the end of their
service life and the ongoing purchase of two new gurneys every three years. Next gurney replacement
anticipated in FY 26.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Prop 172
FINANCIAL SUMMARY
20166
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Special revenue fund
(120) Prop 172 $0 $0 $60,000 $0 $0
SPECIAL REVENUE FUND TOTAL $0 $0 $60,000 $0 $0
TOTAL $0 $0 $60,000 $0 $0
CAPITAL IMPROVEMENT PROGRAM
FIRE DEPARTMENT
FISCAL YEAR 2023-2024
51
20169 WMD-DUODOTE AUTO INJECTOR
REPLACEMENT
PROJECT DESCRIPTION
Establish a two-year replacement program for Weapons of Mass Destruction (WMD) auto injectors. These
personal syringe-like devices are pre-filled with medication used to combat the effects of chemical, biological,
radiological, and nuclear weapons commonly used in terrorist attacks. Auto injectors are used throughout the
country to protect public safety personnel. The current expiration date for all Fire Department auto injectors is
August 2025. Next WMD auto injector replacement anticipated in FY 26.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Capital Projects; Fire Facility Fee
Districts All Com 6/07; Prop 172
FINANCIAL SUMMARY
20169
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Special revenue fund
(120) Prop 172 $0 $0 $30,500 $0 $0
SPECIAL REVENUE FUND TOTAL $0 $0 $30,500 $0 $0
TOTAL $0 $0 $30,500 $0 $0
CAPITAL IMPROVEMENT PROGRAM
FIRE DEPARTMENT
FISCAL YEAR 2023-2024
52
20171 EPCR REPLACEMENT PROGRAM
PROJECT DESCRIPTION
Establish a two-year replacement program for Emergency Medical Services (EMS) Electronic Patient Care Report
(EPCR) iPads. The Fire Department currently has 55 IPads equipped with cellular activation to be used for
gathering real-time patient data in the field. ePCR equipment was implemented on January 1, 2012 according to
the Health Insurance Portability and Accountability Act (HIPAA) and Department of Health and Human Services
(HHS) National Standards and mandatory requirements. IPads, protective cases, vehicle chargers and keyboard
equipment were replaced in FY 19. Next ePCR replacement anticipated in FY 24.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Fire Facility Fee Districts All Com
6/07*
*Project funding includes development impact fees.
Funding is dependent on receipt of development
revenue.
FINANCIAL SUMMARY
20171
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Capital projects funds
(560) Fire Facility Fee Districts All Com 6/07 $65,000 $0 $70,000 $0 $70,000
CAPITAL PROJECTS FUNDS TOTAL $65,000 $0 $70,000 $0 $70,000
TOTAL $65,000 $0 $70,000 $0 $70,000
CAPITAL IMPROVEMENT PROGRAM
FIRE DEPARTMENT
FISCAL YEAR 2023-2024
53
20334 FIRE STATION REPAIRS
PROJECT DESCRIPTION
The Fire Station Maintenance project provides funding to address maintenance issues which go beyond current
replacement capacities. This project establishes funding to replace aging HVAC units, duct work, thermostats
and other climate control measures to improve facility efficiency. This project also provides funding for painting
and exterior repair to Fire Department buildings to provide protection from weather. Following the 2016 Facilities
Condition Assessment Report, many fire stations have been in need of new carpet, flooring, electrical, and
plumbing improvements.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Fire Facility Fees District All Com
6/07*
*Project funding includes development impact fees.
Funding is dependent on receipt of development
revenue.
FINANCIAL SUMMARY
20334
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Capital projects funds
(560) Fire Facility Fee Districts All Com 6/07 $50,000 $50,000 $50,000 $50,000 $50,000
CAPITAL PROJECTS FUNDS TOTAL $50,000 $50,000 $50,000 $50,000 $50,000
TOTAL $50,000 $50,000 $50,000 $50,000 $50,000
CAPITAL IMPROVEMENT PROGRAM
FIRE DEPARTMENT
FISCAL YEAR 2023-2024
54
20384 VEHICLE EXTRICATION RESCUE TOOL
REPLACEMENT
PROJECT DESCRIPTION
This project will establish funding to replace four sets of aging vehicle extrication power rescue tools. The project
objective is to maintain a reliable and serviceable stock of vehicle extrication rescue tools in the Fire
Department. Ten years is the reasonable life expectancy of these tools as long as adequate servicing has been
conducted. The Fire Department currently maintains and operates four sets of vehicle extrication rescue tools for
each of the two front line trucks, one front line Urban Search and Rescue unit, and one reserve truck. Three sets
of vehicle extrication tools were purchased in 2019. The fourth set will reach its service life in 2024. The
approximate cost for each set of vehicle extrication rescue tools is $75,000. Next vehicle extrication rescue tool
replacement anticipated in FY 24.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Fire Facility Fee Districts All Com
6/07*
*Project funding includes development impact fees.
Funding is dependent on receipt of development
revenue.
FINANCIAL SUMMARY
20384
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Capital projects funds
(560) Fire Facility Fee Districts All Com 6/07 $75,000 $0 $0 $0 $0
CAPITAL PROJECTS FUNDS TOTAL $75,000 $0 $0 $0 $0
TOTAL $75,000 $0 $0 $0 $0
CAPITAL IMPROVEMENT PROGRAM
FIRE DEPARTMENT
FISCAL YEAR 2023-2024
55
20393 DEFIBRILLATOR, AED & BATTERY
REPLACEMENT
PROJECT DESCRIPTION
This project replaces 25 Paramedic cardiac defibrillators every five years. The current units in service were
purchased in 2021. Cardiac defibrillators, AEDs and batteries require annual testing and calibration by the
manufacturer to assure proper function. Using properly maintained units protects the Fire Department, and
ultimately the City, from potential litigation. When a unit extends beyond its useful life, it becomes increasingly
difficult and cost prohibitive to have the unit tested and calibrated by the manufacturer. In some cases
manufacturer support is not available. New cardiac defibrillators were purchased in FY 22. Next defibrillator, AED
and battery replacement anticipated in FY 27.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Fire Facility Fee Districts All Com
6/07*
*Project funding includes development impact fees.
Funding is dependent on receipt of development
revenue.
FINANCIAL SUMMARY
20393
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Capital projects funds
(560) Fire Facility Fee Districts All Com 6/07 $250,000 $250,000 $250,000 $250,000 $0
CAPITAL PROJECTS FUNDS TOTAL $250,000 $250,000 $250,000 $250,000 $0
TOTAL $250,000 $250,000 $250,000 $250,000 $0
CAPITAL IMPROVEMENT PROGRAM
FIRE DEPARTMENT
FISCAL YEAR 2023-2024
56
20502 FIRE STATION APPARATUS BAY DOOR
REPLACEMENT
PROJECT DESCRIPTION
The Fire Station Apparatus Bay Door Replacement project provides funding to replace the aging apparatus bay
doors at Stations 3, 5, 6 in FY 23 and Stations 7 and 8 in FY 26. Over the past five years, the Fire Department
has seen a dramatic increase in the need to have the apparatus bay doors serviced and/or repaired at the fire
stations. Most recently, the front apparatus bay door at Fire Station 4 was damaged beyond repair and it took
several months to receive a replacement. When apparatus bay doors become damaged and inoperable, it affects
emergency response times and causes unnecessary damage to apparatus that are having to be parked outside
in the elements. Recommendations have been made by several door companies to replace the existing sectional
panel doors with steel slat roll-up doors for reliability and longevity.
PROJECT DETAILS
Project Type: One-Time
Estimated Completion Date: June 2026
Funding Source(s): Capital Projects; Prop 172
FINANCIAL SUMMARY
20502
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Special revenue fund
(120) Prop 172 $0 $0 $220,000 $0 $0
SPECIAL REVENUE FUND TOTAL $0 $0 $220,000 $0 $0
TOTAL $0 $0 $220,000 $0 $0
CAPITAL IMPROVEMENT PROGRAM
FIRE DEPARTMENT
FISCAL YEAR 2023-2024
57
30032 WELLNESS EQUIPMENT REPLACEMENT
PROJECT DESCRIPTION
The Orange Fire Department (OFD) currently embraces the International Association of Fire Chiefs (IAFC)
sponsored wellness program, so as to provide for a stronger and more physically fit workforce, in order to deliver
service that ensure public safety. In order to be successful with this program, wellness equipment is provided at
each of the eight fire stations. In an effort to maintain the effectiveness of this wellness program it is necessary to
initiate a long term replacement plan, due to the significant amount of time and money spent repairing the
current inventory. Additionally, some of the machines are aged to a point to where it is impossible to find
replacement parts. This project will be ongoing based on equipment needs at each station.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Fire Facility Districts All Com 6/07*
*Project funding includes development impact fees.
Funding is dependent on receipt of development
revenue.
FINANCIAL SUMMARY
30032
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Capital projects funds
(560) Fire Facility Fee Districts All Com 6/07 $0 $45,000 $0 $45,000 $0
CAPITAL PROJECTS FUNDS TOTAL $0 $45,000 $0 $45,000 $0
TOTAL $0 $45,000 $0 $45,000 $0
CAPITAL IMPROVEMENT PROGRAM
FIRE DEPARTMENT
FISCAL YEAR 2023-2024
58
20104 SCBA RETROFIT & REPLACEMENT
CARRYOVER PROJECT
PROJECT DESCRIPTION
Purchase 105 Self Contained Breathing Apparatus (SCBA) harnesses and associated equipment. The Fire
Department embraces national firefighting safety standards set forth by the National Fire Protection
Association (NFPA). SCBA are used to provide firefighter safety during fire attack, search, rescue, and other
emergencies involving Immediately Dangerous to Life and Health environments. This proposed equipment
has a 10-year life expectancy. New SCBA equipment was purchased in FY 20. Next SCBA replacement
anticipated in FY 30.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Fire Facility Fee Districts All Com
6/07
Total Budget: $950,000
CAPITAL IMPROVEMENT PROGRAM
FIRE DEPARTMENT
FISCAL YEAR 2023-2024
59
20501 USAR TOOLS AND EQUIPMENT
REPLACEMENT
CARRYOVER PROJECT
PROJECT DESCRIPTION
The Orange City Fire Department currently staffs and operates one of five Type 1 Heavy USAR units in Orange
County. This unit may be dispatched locally or regionally on complex USAR incidents to provide highly
specialized equipment and trained personnel to mitigate the following types of emergencies:
This apparatus is equipped with a large variety of specialty power tools and equipment which require ongoing
maintenance and repair. These tools and equipment include: power saws, drill hammers, on-board air
compressor, Stanley Tool, rope/rigging equipment, shoring equipment, confined space air and communication
lines. Most of the equipment that is currently housed on USAR 6 is over 20 years old and has reached its service
life. The Fire Department must replace this equipment in order to continue providing urban search and rescue
services safely and effectively.
Confined Space Rescue1.
Trench Rescue2.
Swift Water Rescue3.
Lifting and moving of heavy objects4.
High-angle rope rescue5.
Low-angle rope rescue6.
PROJECT DETAILS
Project Type: One-Time
Starting Fiscal Year: 2021-2022
Estimated Completion Date: December 2023
Funding Source(s): Capital Projects
Total Budget: $200,000
CAPITAL IMPROVEMENT PROGRAM
FIRE DEPARTMENT
FISCAL YEAR 2023-2024
60
20505 FIRE STATION 5 EXERCISE ROOM
ADDITION
CARRYOVER PROJECT
PROJECT DESCRIPTION
Fire Station 5 was built in 1965 and did not account for the space needed to store and utilize exercise equipment.
This equipment, along with the department’s wellness program, are essential in providing a stronger and more
physically fit workforce. The exercise equipment is currently housed on the apparatus bay floor of Station 5,
which severely limits the ability to park emergency apparatus inside the structure. The addition of an exercise
room to the rear of Station 5 will provide flexibility for the future operational needs of the Fire Department by
creating more space for personnel and apparatus. The existing fire station will remain largely unchanged, with
the exception of some minor aesthetic improvements to match the new room addition. The estimated cost of this
project is $360,000, per cost estimate provided by WLC Architects.
PROJECT DETAILS
Project Type: One-Time
Estimated Completion Date: December 2023
Funding Source(s): Capital Projects
Total Budget: $414,000
CAPITAL IMPROVEMENT PROGRAM
FIRE DEPARTMENT
FISCAL YEAR 2023-2024
61
THIS PAGE INTENTIONALLYLEFT BLANK
62
FY 2023-2024 Budget
2023-2024 2024-2025 2025-2026 2026-2027 2027-2028 5 Year Total
20272 GIS Enterprise Development 60,000 60,000 60,000 60,000 60,000 300,000
20278 Server Refreshes / memory expansion 50,000 50,000 50,000 50,000 50,000 250,000
20279 Sharepoint -10,000 10,000 10,000 10,000 40,000
20281 IT System Improvements 75,000 75,000 75,000 75,000 75,000 375,000
20282 Personal Computer Replacements 200,000 200,000 200,000 200,000 200,000 1,000,000
20284 Document Management Improvements -20,000 20,000 20,000 20,000 80,000
20338 Strategic Plan Update 30,000 ---60,000 90,000
20339 Network Refresh 50,000 50,000 50,000 50,000 50,000 250,000
20342 Conference Room Audio/Video -20,000 20,000 20,000 20,000 80,000
20388 Civic Center Fiber Improvements -20,000 20,000 20,000 20,000 80,000
20391 Financial System Replacement 300,000 200,000 200,000 200,000 200,000 1,100,000
20413 UPS Replacements 80,000 65,000 45,000 45,000 45,000 280,000
20456 Physical Security Platform Replacements 1,000,000 200,000 200,000 200,000 200,000 1,800,000
20510 Storage Area Network Replacement 150,000 150,000 100,000 100,000 100,000 600,000
20516 Video Production and Broadcast Refresh 135,000 135,000 135,000 135,000 135,000 675,000
30071 Fiber Optic Cable Replacements 100,000 100,000 100,000 100,000 100,000 500,000
Total 2,230,000 1,355,000 1,285,000 1,285,000 1,345,000 7,500,000
Carryover Projects - No New Funding Requested
20266 Park Video Surveillance & Security
20277 KACE for PD
20285 Work Order Management Consulting
20347 Enterprise Access System
20455 Multi-Factor Authentication
Project
Project Summary
INFORMATION TECHNOLOGY
63
THIS PAGE INTENTIONALLYLEFT BLANK
64
20272 GIS ENTERPRISE DEVELOPMENT
PROJECT DESCRIPTION
The ESRI Enterprise Advantage Program (EEAP) is a flexible framework to help the City reach its vision of
adopting ArcGIS to meet objectives of several departments, including Public Works, Community Development,
Community Services, Fire, and Police. The program provides consulting services, proactive technical advisory,
annual planning/review meetings, a collaboratively developed technical work plan, participation in community
technology webcasts as well as access to premium technical support and training.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Computer Replacement
FINANCIAL SUMMARY
20272
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Internal service funds
(790) Computer Replacement $60,000 $60,000 $60,000 $60,000 $60,000
INTERNAL SERVICE FUNDS TOTAL $60,000 $60,000 $60,000 $60,000 $60,000
TOTAL $60,000 $60,000 $60,000 $60,000 $60,000
CAPITAL IMPROVEMENT PROGRAM
INFORMATION TECHNOLOGY
FISCAL YEAR 2023-2024
65
20278 SERVER REFRESHES
PROJECT DESCRIPTION
This project provides for replacement of aged servers. The most significant need is an accumulation of funds for
the replacement of eight Virtual Machine (VM) hosts and other physical servers by FY 24.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Computer Replacement
FINANCIAL SUMMARY
20278
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Internal service funds
(790) Computer Replacement $50,000 $50,000 $50,000 $50,000 $50,000
INTERNAL SERVICE FUNDS TOTAL $50,000 $50,000 $50,000 $50,000 $50,000
TOTAL $50,000 $50,000 $50,000 $50,000 $50,000
CAPITAL IMPROVEMENT PROGRAM
INFORMATION TECHNOLOGY
FISCAL YEAR 2023-2024
66
20279 SHAREPOINT IMPLEMENTATION
PROJECT DESCRIPTION
In FY 17, the City implemented a new SharePoint employee portal site to replace the old intranet. This project
provides for professional services for anticipated new and improved uses such as document collaboration,
workflow, and further development of the employee portal.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Computer Replacement
FINANCIAL SUMMARY
20279
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Internal service funds
(790) Computer Replacement $0 $10,000 $10,000 $10,000 $10,000
INTERNAL SERVICE FUNDS TOTAL $0 $10,000 $10,000 $10,000 $10,000
TOTAL $0 $10,000 $10,000 $10,000 $10,000
CAPITAL IMPROVEMENT PROGRAM
INFORMATION TECHNOLOGY
FISCAL YEAR 2023-2024
67
20281 IT SYSTEM IMPROVEMENTS
PROJECT DESCRIPTION
This request is for as-needed small projects and IT capital expenditures. Specific scope and cost will be
determined during the budgeted fiscal year. This could include such items as wireless access points, phone
handset replacements and enhancements, desktop application licensing, and data center infrastructure
improvements.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Computer Replacement
FINANCIAL SUMMARY
20281
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Internal service funds
(790) Computer Replacement $75,000 $75,000 $75,000 $75,000 $75,000
INTERNAL SERVICE FUNDS TOTAL $75,000 $75,000 $75,000 $75,000 $75,000
TOTAL $75,000 $75,000 $75,000 $75,000 $75,000
CAPITAL IMPROVEMENT PROGRAM
INFORMATION TECHNOLOGY
FISCAL YEAR 2023-2024
68
20282 PERSONAL COMPUTER REPLACEMENTS
PROJECT DESCRIPTION
A recurring annual replacement of the City's aging PC (desktops, laptops, tablets) inventory is recommended.
This initiative is a recommended guideline to replace a fourth of the City's PC inventory to prevent the inventory
from becoming excessively aged and prevent impact to staff productivity due to PC failures. In FY 24, the
program will be reassessed.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Computer Replacement
FINANCIAL SUMMARY
20282
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Internal service funds
(790) Computer Replacement $200,000 $200,000 $200,000 $200,000 $200,000
INTERNAL SERVICE FUNDS TOTAL $200,000 $200,000 $200,000 $200,000 $200,000
TOTAL $200,000 $200,000 $200,000 $200,000 $200,000
CAPITAL IMPROVEMENT PROGRAM
INFORMATION TECHNOLOGY
FISCAL YEAR 2023-2024
69
20284 DOCUMENT MANAGEMENT
IMPROVEMENTS
PROJECT DESCRIPTION
In FY 18, the City upgraded its document management system to the latest version of LaserFiche and upgraded
its licensing to LaserFiche's latest platform, which is its largest enterprise licensing option. For FY 24, the City
will continue to integrate additional features that are now available as a result of these upgrades. The budgeted
amounts represent professional services that will assist in their implementation.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Computer Replacement
FINANCIAL SUMMARY
20284
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Internal service funds
(790) Computer Replacement $0 $20,000 $20,000 $20,000 $20,000
INTERNAL SERVICE FUNDS TOTAL $0 $20,000 $20,000 $20,000 $20,000
TOTAL $0 $20,000 $20,000 $20,000 $20,000
CAPITAL IMPROVEMENT PROGRAM
INFORMATION TECHNOLOGY
FISCAL YEAR 2023-2024
70
20338 STRATEGIC PLAN UPDATE
PROJECT DESCRIPTION
The City's former 3-year strategic IT plan was delivered in 2013. Therefore, IT Services recognizes the City is due
for another strategic plan review. Due to recent structural changes with the IT Department, a Strategic Plan is still
anticipated. Funding in out-years is set aside for future strategic plan review.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Computer Replacement
FINANCIAL SUMMARY
20338
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Internal service funds
(790) Computer Replacement $30,000 $0 $0 $0 $60,000
INTERNAL SERVICE FUNDS TOTAL $30,000 $0 $0 $0 $60,000
TOTAL $30,000 $0 $0 $0 $60,000
CAPITAL IMPROVEMENT PROGRAM
INFORMATION TECHNOLOGY
FISCAL YEAR 2023-2024
71
20339 NETWORK REFRESH
PROJECT DESCRIPTION
This project replaces various network appliances and infrastructure as they approach end of support.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Computer Replacement
FINANCIAL SUMMARY
20339
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Internal service funds
(790) Computer Replacement $50,000 $50,000 $50,000 $50,000 $50,000
INTERNAL SERVICE FUNDS TOTAL $50,000 $50,000 $50,000 $50,000 $50,000
TOTAL $50,000 $50,000 $50,000 $50,000 $50,000
CAPITAL IMPROVEMENT PROGRAM
INFORMATION TECHNOLOGY
FISCAL YEAR 2023-2024
72
20342 CONFERENCE ROOM AUDIO/VIDEO
PROJECT DESCRIPTION
Currently, City conference rooms have been furnished with audio/video equipment for meeting collaboration and
presentations. This project includes the continued effort to maintain audio and video equipment in various
conference room locations as well as refresh ageing audio/video conference room equipment.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Computer Replacement
FINANCIAL SUMMARY
20342
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Internal service funds
(790) Computer Replacement $0 $20,000 $20,000 $20,000 $20,000
INTERNAL SERVICE FUNDS TOTAL $0 $20,000 $20,000 $20,000 $20,000
TOTAL $0 $20,000 $20,000 $20,000 $20,000
CAPITAL IMPROVEMENT PROGRAM
INFORMATION TECHNOLOGY
FISCAL YEAR 2023-2024
73
20388 CIVIC CENTER FIBER IMPROVEMENTS
PROJECT DESCRIPTION
The City's fiber infrastructure is aging. There is need to repair and improve fiber that supports City network
communications.
Locations to be determined based on need and circumstance.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Computer Replacement
FINANCIAL SUMMARY
20388
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Internal service funds
(790) Computer Replacement $0 $20,000 $20,000 $20,000 $20,000
INTERNAL SERVICE FUNDS TOTAL $0 $20,000 $20,000 $20,000 $20,000
TOTAL $0 $20,000 $20,000 $20,000 $20,000
CAPITAL IMPROVEMENT PROGRAM
INFORMATION TECHNOLOGY
FISCAL YEAR 2023-2024
74
20391 FINANCIAL SYSTEM REPLACEMENT
PROJECT DESCRIPTION
Tyler Technologies has indicated they are no longer improving or marketing the City’s current EDEN financial
system product. Consistent with prior years, IT Services recommends the City continues accumulating funds to
replace this system. It is anticipated a consultant will be retained in FY23 to commence the initial design for a
new ERP with testing in FY25 and Go Live in FY26.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Computer Replacement
FINANCIAL SUMMARY
20391
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Internal service funds
(790) Computer Replacement $300,000 $200,000 $200,000 $200,000 $200,000
INTERNAL SERVICE FUNDS TOTAL $300,000 $200,000 $200,000 $200,000 $200,000
TOTAL $300,000 $200,000 $200,000 $200,000 $200,000
CAPITAL IMPROVEMENT PROGRAM
INFORMATION TECHNOLOGY
FISCAL YEAR 2023-2024
75
20413 UPS REPLACEMENTS
PROJECT DESCRIPTION
Provide uninterruptable power supplies (UPS) and related electrical work to datacenter UPS and intermediate
distribution frames (IDFs), or network equipment closets, to ensure that network and server infrastructure and
audio visual equipment stays available in the event of a power outage.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Computer Replacement
FINANCIAL SUMMARY
20413
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Internal service funds
(790) Computer Replacement $80,000 $65,000 $45,000 $45,000 $45,000
INTERNAL SERVICE FUNDS TOTAL $80,000 $65,000 $45,000 $45,000 $45,000
TOTAL $80,000 $65,000 $45,000 $45,000 $45,000
CAPITAL IMPROVEMENT PROGRAM
INFORMATION TECHNOLOGY
FISCAL YEAR 2023-2024
76
20456 PHYSICAL SECURITY PLATFORM
REPLACEMENTS
PROJECT DESCRIPTION
This request recognizes the need with an aging security platform to replace or add cameras, wireless radios,
additional door locations, intrusion detection zones, consulting services, network, servers, and storage
replacement and expansion by FY 24.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Computer Replacement; Capital Bond Proceeds
FINANCIAL SUMMARY
20456
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Capital projects funds
(553) CAPITAL BOND PROCEEDS $1,000,000 $0 $0 $0 $0
CAPITAL PROJECTS FUNDS TOTAL $1,000,000 $0 $0 $0 $0
Internal service funds
(790) Computer Replacement $0 $200,000 $200,000 $200,000 $200,000
INTERNAL SERVICE FUNDS TOTAL $0 $200,000 $200,000 $200,000 $200,000
TOTAL $1,000,000 $200,000 $200,000 $200,000 $200,000
CAPITAL IMPROVEMENT PROGRAM
INFORMATION TECHNOLOGY
FISCAL YEAR 2023-2024
77
20510 STORAGE AREA NETWORK
REPLACEMENT
PROJECT DESCRIPTION
The Storage Area Network (SAN) for the Police Department will reach end of support in FY 24. Backup storage
for the two datacenters will reach end of support in FY 25. The requested budget over the next few fiscal years
accumulates towards those respective replacements goals. A recurring CIP budget is recommended to refresh
SAN hardware on an ongoing basis for future repairs.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Computer Replacement
FINANCIAL SUMMARY
20510
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Internal service funds
(790) Computer Replacement $150,000 $150,000 $100,000 $100,000 $100,000
INTERNAL SERVICE FUNDS TOTAL $150,000 $150,000 $100,000 $100,000 $100,000
TOTAL $150,000 $150,000 $100,000 $100,000 $100,000
CAPITAL IMPROVEMENT PROGRAM
INFORMATION TECHNOLOGY
FISCAL YEAR 2023-2024
78
20516 VIDEO PRODUCTION AND BROADCAST
REFRESH
PROJECT DESCRIPTION
The City possesses three separate Audio Video (AV) systems rebuilt between 2015 and 2017 and includes the
Council AV System, the City’s TV Production System (cameras, etc.) and the City’s TV Channel Playback system.
The project anticipates a 5-year replacement schedule with annual upgrades to target the most vulnerable and
critical systems through an annual assessment and evaluation of the current conditions to determine the overall
health of the equipment and avoid failures.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Computer Replacement; 1% PEG Program
FINANCIAL SUMMARY
20516
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Special revenue fund
(130) 1% Peg Program $67,500 $67,500 $67,500 $67,500 $67,500
SPECIAL REVENUE FUND TOTAL $67,500 $67,500 $67,500 $67,500 $67,500
Internal service funds
(790) Computer Replacement $67,500 $67,500 $67,500 $67,500 $67,500
INTERNAL SERVICE FUNDS TOTAL $67,500 $67,500 $67,500 $67,500 $67,500
TOTAL $135,000 $135,000 $135,000 $135,000 $135,000
CAPITAL IMPROVEMENT PROGRAM
INFORMATION TECHNOLOGY
FISCAL YEAR 2023-2024
79
30071 FIBER OPTIC CABLE REPLACEMENTS
PROJECT DESCRIPTION
Having City locations on our own fiber increases security and bandwidth. The project will be used to replace
aging IT Fiber infrastructure. The City's east fiber ring replacement is anticipated to occur in FY 24.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Capital Projects; Computer Replacement
FINANCIAL SUMMARY
30071
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Internal service funds
(790) Computer Replacement $100,000 $100,000 $100,000 $100,000 $100,000
INTERNAL SERVICE FUNDS TOTAL $100,000 $100,000 $100,000 $100,000 $100,000
TOTAL $100,000 $100,000 $100,000 $100,000 $100,000
CAPITAL IMPROVEMENT PROGRAM
INFORMATION TECHNOLOGY
FISCAL YEAR 2023-2024
80
20266 PARK VIDEO SURVEILLANCE & SECURITY
CARRYOVER PROJECT
PROJECT DESCRIPTION
This project will expand video surveillance systems at several park locations. These sophisticated systems will
continue to deter ongoing illegal activities such as graffiti, general vandalism, criminal activity, park hour
violations, campfire, and overnight camping. Video surveillance systems have been installed at Handy, Hart,
Shaffer, Plaza, and Yorba Parks, and the Sports Center at Grijalva Park. The City will evaluate the security camera
needs at other park locations in FY 24. The project will be ongoing and future locations will be identified
dependent upon the ability to connect park sites to the city's network.
PROJECT DETAILS
Project Type: Ongoing
Starting Fiscal Year: 2015-2016
Funding Source(s): Park Acquisition (Infill); Capital
Bond Proceeds; Grijalva Park Fund
Total Budget: $629,656
CAPITAL IMPROVEMENT PROGRAM
INFORMATION TECHNOLOGY
FISCAL YEAR 2023-2024
81
20277 KACE FOR POLICE
CARRYOVER PROJECT
PROJECT DESCRIPTION
The KACE appliance is useful at the Civic Center for helpdesk management, IT asset inventory management,
software distribution, and software license management. This initiative is for licensing and professional services
to expand the use of this product at the Police Department facility.
PROJECT DETAILS
Project Type: One-Time
Starting Fiscal Year: 2015-2016
Estimated Completion Date: June 2024
Funding Source(s): Computer Replacement
Total Budget: $25,000
CAPITAL IMPROVEMENT PROGRAM
INFORMATION TECHNOLOGY
FISCAL YEAR 2023-2024
82
20285 WORK ORDER MANAGEMENT
CONSULTING
CARRYOVER PROJECT
PROJECT DESCRIPTION
During FY 17, an effort was made to evaluate and select a consultant to assist the City to replace the existing
Maintstar work order management system, which was implemented by the City 19 years ago. It is recommended
to review and consider a replacement. The new system will include an inventory of all City assets and
infrastructure, provide data and insight to guide capital project needs, record data on maintenance on each
asset, and allow for work order requests for internal and external uses. This system would be used in tandem
with a Citizen Request Management system, which would allow citizens and businesses to report issues online
and receive updates as to the status of their request. Finally, the system would provide much of the data needed
for reimbursement in the event of a major emergency or disaster.
PROJECT DETAILS
Project Type: One-Time
Starting Fiscal Year: 2015-2016
Estimated Completion Date: June 2024
Funding Source(s): Computer Replacement; Sanitation and Sewer; Water
Total Budget: $1,054,800
CAPITAL IMPROVEMENT PROGRAM
INFORMATION TECHNOLOGY
FISCAL YEAR 2023-2024
83
20347 ENTERPRISE ACCESS SYSTEM
CARRYOVER PROJECT
PROJECT DESCRIPTION
The City possesses three different access control systems, which causes confusion with badge access
management where staff require access to facilities across these three systems. In FY 17, the City acquired a
Genetec security solution. This project anticipates licensing and hardware to implement access control
exploiting the capabilities of the recently acquired Genetec system. In addition to replacing the existing access
control system locations enabled today, this initiative envisions adding access control for seven park facilities.
Ongoing for FY 24, consider augmenting for intrusion detection for all City facility locations and expand access
control to include fire stations and the branch libraries.
PROJECT DETAILS
Project Type: One-Time
Starting Fiscal Year: 2017-2018
Estimated Completion Date: June 2024
Funding Source(s): Park Acquisition (Infill); Fire Facility Fee Districts All; Police Facility Fees; Library Facility
Fees; Capital Bond Proceeds; Computer Replacement
Total Budget: $1,658,036
CAPITAL IMPROVEMENT PROGRAM
INFORMATION TECHNOLOGY
FISCAL YEAR 2023-2024
84
20455 MULTI-FACTOR AUTHENTICATION
CARRYOVER PROJECT
PROJECT DESCRIPTION
Multi-factor authentication allows for three factors of identification:
What you know is generally a password. This initiative considers either "what you have" or "what you are" using
an access badge or biometrics. A card reader or camera at every PC location would be needed. If a password is
somehow compromised, the additional required factor for credentialed access will prevent gaining credentialed
access and therefore greatly increase the City's security posture.
What you know1.
What you have2.
What you are3.
PROJECT DETAILS
Project Type: One-Time
Starting Fiscal Year: 2019-2020
Estimated Completion Date: June 2024
Funding Source(s): Computer Replacement
Total Budget: $210,000
CAPITAL IMPROVEMENT PROGRAM
INFORMATION TECHNOLOGY
FISCAL YEAR 2023-2024
85
THIS PAGE INTENTIONALLYLEFT BLANK
86
FY 2023-2024 Budget
Carryover Projects - No New Funding Requested
30056 HVAC Replacement-Library
Project Summary
LIBRARY
87
THIS PAGE INTENTIONALLYLEFT BLANK
88
30056 HVAC REPLACEMENT
CARRYOVER PROJECT
PROJECT DESCRIPTION
The HVAC of the original building at the Orange Public Library & History Center is over 30 years old and is
nearing the end of its service life. The unit is inefficient, and replacement parts are becoming difficult to locate,
resulting in loss of control and uncomfortable temperatures for Library patrons, volunteers, and staff. Phase I
involved the creation of a design to replace the one-of-a-kind unit and was completed in FY 20. Phase II will
include the HVAC replacement as well as upgrades to the transformer and is expected to be completed by June
2024. Replacement of this unit was also included in the recommendations of the energy efficiency audit and the
Facilities Condition Assessment that were completed. Funding for this project reflects projected energy savings
related to an Energy Coalition Grant and revenue received from the Building Forward Main Grant.
PROJECT DETAILS
Project Type: One-Time
Starting Fiscal Year: 2014-2015
Estimated Completion Date: June 2024
Funding Source(s): Reimbursable Capital Projects;
Capital Projects; Library Facility Fees
Total Budget: $567,670
CAPITAL IMPROVEMENT PROGRAM
LIBRARY SERVICES
FISCAL YEAR 2023-2024
89
THIS PAGE INTENTIONALLYLEFT BLANK
90
FY 2023-2024 Budget
2023-2024 2024-2025 2025-2026 2026-2027 2027-2028 5 Year Total
20335 Mobile Data Computers 110,000 ----110,000
30196 Police Enterprise System 635,000 635,000 1,175,000 750,000 750,000 3,945,000
Total 745,000 635,000 1,175,000 750,000 750,000 4,055,000
Project
Project Summary
POLICE DEPARTMENT
91
THIS PAGE INTENTIONALLYLEFT BLANK
92
20335 POLICE VEHICLE MOBILE DATA
COMPUTER REPLACEMENT
PROJECT DESCRIPTION
The Police Department’s Mobile Data Computer (MDC) replacement project identifies the need to maintain
contemporary and functional MDCs in the patrol fleet. This project will replace a quarter of the MDCs, on an
annual basis, for a total project cost of $440,000. Included in the purchase is approximately 65 mobile data
computers, a two-year extended warranty that will provide five years of coverage and docking stations. The
previous MDC replacement project was completed in June 2021.
PROJECT DETAILS
Project Type: One-Time
Estimated Completion Date: June 2027
Funding Source(s): Asset Seizure - Federal
FINANCIAL SUMMARY
20335
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Special revenue fund
(355) Asset Seizure- Federal $110,000 $0 $0 $0 $0
SPECIAL REVENUE FUND TOTAL $110,000 $0 $0 $0 $0
TOTAL $110,000 $0 $0 $0 $0
CAPITAL IMPROVEMENT PROGRAM
POLICE DEPARTMENT
FISCAL YEAR 2023-2024
93
30196 POLICE ENTERPRISE SYSTEM
PROJECT DESCRIPTION
The Police Enterprise System project provides a flexible platform to help the Police Department reach its
vision of adopting a network solution that allows all systems to connect and integrate with one another to meet
the objectives of the department. The system consolidates and manages police hardware and software
including existing Tasers, body worn, fleet, and interview cameras, along with the evidence.com portal, which
is cloud based for data storage and sharing, Records software, and Dispatch software used for basic
operations. The project is led by the Police Department and primarily funded through the Computer
Replacement fund for a total project cost of $7.5 million over ten years.
PROJECT DETAILS
Project Type: One-Time
Estimated Completion Date: June 2032
Funding Source(s): Computer Replacement
FINANCIAL SUMMARY
30196
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Internal service funds
(790) Computer Replacement $635,000 $635,000 $1,175,000 $750,000 $750,000
INTERNAL SERVICE FUNDS TOTAL $635,000 $635,000 $1,175,000 $750,000 $750,000
TOTAL $635,000 $635,000 $1,175,000 $750,000 $750,000
CAPITAL IMPROVEMENT PROGRAM
POLICE DEPARTMENT
FISCAL YEAR 2023-2024
94
FY 2023-2024 Budget
2023-2024 2024-2025 2025-2026 2026-2027 2027-2028 5 Year Total
11328 ADA Improvements 68,430 68,430 68,430 68,430 68,430 342,150
12982 Corp Yard Renovations 1,000,000 1,150,000 1,150,000 - - 3,300,000
13115 Pavement Management Program Survey - 70,000 - 70,000 - 140,000
13120 Pavement Management Program 6,800,000 7,550,000 7,900,000 8,050,000 8,200,000 38,500,000
13816 Structural Evaluation of City Bridges - 2,000,000 - - - 2,000,000
14997 Municipal Parking Lot Maintenance 22,000 22,000 22,000 22,000 22,000 110,000
15508 Sewer Line Maintenance & Replacement 2,367,750 2,438,783 2,511,946 2,587,304 2,664,923 12,570,706
15509 Sewer Cleaning & Video 400,000 500,000 500,000 500,000 500,000 2,400,000
16065 Quiet Zone/Rr Xing Safety 50,000 50,000 50,000 50,000 50,000 250,000
16302 Minor Traffic Control Devices 250,000 250,000 250,000 250,000 250,000 1,250,000
16304 Biennial Traffic Signal Coordination - 95,000 - 95,000 - 190,000
16305 Traffic Signal Controller Changeout 100,000 100,000 100,000 100,000 100,000 500,000
16469 Traffic Signal Equipment Painting 45,000 45,000 45,000 45,000 45,000 225,000
19809 City Facility Improvements 881,000 - - - - 881,000
19826 Police HQ Exterior Wall Sealing 20,000 20,000 20,000 20,000 20,000 100,000
19999 Motor Vehicle Replacements 4,448,998 - - - - 4,448,998
20374 Streetlight Pole Replacement Program 500,000 500,000 500,000 500,000 500,000 2,500,000
20397 Parker Street Restriping - - - - 100,000 100,000
20430 Storm Drain Improvements 400,000 500,000 500,000 500,000 500,000 2,400,000
20461 Main Library Improvements 130,000 - - - - 130,000
20483 Police Facility Improvements 100,000 100,000 - - - 200,000
20494 Administration Building Lobby Improvements 445,000 - - - - 445,000
20518 Pedestrian Beacon Upgrades 277,300 - - - - 277,300
20522 Old Towne Parking Management System 50,000 - - - - 50,000
30019 Santiago Canyon Road Multipurpose Trail - 75,000 750,000 - - 825,000
30150 Local Roadway Safety Plan - - - - 50,000 50,000
30165 Grand St Parking Lot Improvement 750,000 - - - - 750,000
30220 Neighborhood Street Rehabilitation 839,612 - - - - 839,612
Total 19,945,090 15,534,213 14,367,376 12,857,734 13,070,353 75,774,766
Carryover Projects - No New Funding Requested
20191 Main Street Signal Synchronization
20255 Santiago Hills LAD- General Renovations
20325 Santiago Bike Trail Phase IV
20329 Chapman & Batavia Left Turn Signal Modification
20353 Chapman & Grand Left Turn Signal Modification
20354 Chapman & Cambridge Left Turn Signal Modification
20376 Garden Grove Boulevard Signal Synchronization
20381 Katella Avenue Signal Synchronization
20382 Katella Avenue Signal Network Extension
20383 Cannon & Serrano Intersection Modification
20425 Tustin St Signal Synchronization
20443 Orange Community Shuttle Feasibility Study
20444 Police HQ Atrium Rehabilitation
20462 Taft Library Improvements
20463 El Modena Library Improvements
20465 Fire Stations Facility Improvements
20485 Tustin Street BioClean Installation
20500 Sycamore and Palmyra Neighborhoods Street Rehabilitation
30059 OC & PT Various Improvements
30115 Glassell & Palmyra Signal Installation
30163 Chapman Ave BioClean Installation
30166 Cambridge St Infrastructure Improvement
30167 Katella Ave Street Rehabilitation
30168 Walnut Ave Infrastructure Improvement
30174 Cannon Street Widening
30194 Santiago Canyon Road Rehabilitation
30215 Taft & Lewis Storm Project X Tier 1
Project Summary
PUBLIC WORKS
Project
95
FY 2023-2024 Budget
2023-2024 2024-2025 2025-2026 2026-2027 2027-2028 5 Year Total
11328 ADA Improvements 200,000 - - - - 200,000
20378 Katella & Batavia Signal Network Extension - 150,000 - - - 150,000
20379 Batavia & Taft Signal Network Extension 620,000 - - - - 620,000
20380 Glassell St Signal Network Extension 1,020,000 - - - - 1,020,000
20525 Santiago Canyon Road Signal Network Extension - - - - 250,000 250,000
20527 Bicycle Master Plan Update 100,000 - - - - 100,000
Total 1,940,000 150,000 - - 250,000 2,340,000
Developer Impact Fee Projects
PUBLIC WORKS
Funding for the below projects includes development impact fees and is dependent on receipt of development revenue.
Project
96
11328 ADA IMPROVEMENTS
PROJECT DESCRIPTION
This project will modify curbs and ramps at various locations throughout the City to comply with the Americans
with Disabilities Act (ADA) regulations. This has been an ongoing project, partially funded with Community
Development Block Grants (CDBG).
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): TSIP Citywide; Community
Development Block Grant; Capital Projects
*Project funding includes development impact fees.
Funding is dependent on receipt of development
revenue.
FINANCIAL SUMMARY
11328
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Special revenue fund
(310) Community Development Block Grant $68,430 $68,430 $68,430 $68,430 $68,430
(287) TSIP Citywide $200,000 $0 $0 $0 $0
SPECIAL REVENUE FUND TOTAL $268,430 $68,430 $68,430 $68,430 $68,430
TOTAL $268,430 $68,430 $68,430 $68,430 $68,430
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
97
12982 CORP YARD RENOVATIONS
PROJECT DESCRIPTION
Renovation of the Corporation Yard has completed the final design. This project will focus on improving space
allocation, enhancing paths of travel and safety, maximizing equipment and vehicle storage, and redistributing
departments’ storage areas of Police, Community Services, and Public Works. Upgrades will also include
necessary improvements to comply with NPDES/environmental requirements. The first construction phase
includes undergrounding utilities, completing the perimeter wall, lightings, landscaping, pavement
reconstruction, and building the material storage for environmental compliance. Construction of the first phase
is expected to begin in the Summer of 2023. The second phase of the project includes the replacement of
modified wooden sheds / storage containers to prefabricated metal storage buildings along with building a
permanent transfer station for environmental compliance. City staff is evaluating options for funding for the
second phase.
PROJECT DETAILS
Project Type: One-Time
Estimated Completion Date: June 2026
Funding Source(s): Sewer; Gas Tax Maintenance;
Capital Projects; Capital Bond Proceeds
FINANCIAL SUMMARY
12982
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Capital projects funds
(500) Capital Projects $0 $1,000,000 $1,000,000 $0 $0
(553) CAPITAL BOND PROCEEDS $1,000,000 $0 $0 $0 $0
CAPITAL PROJECTS FUNDS TOTAL $1,000,000 $1,000,000 $1,000,000 $0 $0
Special revenue fund
(270) Gas Tax Maintenance $0 $150,000 $150,000 $0 $0
SPECIAL REVENUE FUND TOTAL $0 $150,000 $150,000 $0 $0
TOTAL $1,000,000 $1,150,000 $1,150,000 $0 $0
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
98
13115 PAVEMENT MANAGEMENT PROGRAM
SURVEY
PROJECT DESCRIPTION
Windshield field surveys of the City's pavement are conducted every two years for arterial streets and every six
years for local streets to determine the pavement condition indexes for each segment. These surveys are
conducted as a requirement for numerous grant programs, OCTA bi-annual reports, and overall pavement
management programs. This project also includes traffic data collection including traffic counts, parking surveys,
and speed surveys to be done bi-annually.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Traffic Improvement - Measure M2;
TSIP Citywide
FINANCIAL SUMMARY
13115
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Special revenue fund
(263) Traffic Improvemnt -Measure M2 $0 $70,000 $0 $70,000 $0
SPECIAL REVENUE FUND TOTAL $0 $70,000 $0 $70,000 $0
TOTAL $0 $70,000 $0 $70,000 $0
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
99
13120 PAVEMENT MANAGEMENT PROGRAM
PROJECT DESCRIPTION
The City's Pavement Management Program identifies the condition of 320 miles of streets and identifies the
maintenance needs of this roadway system. This program requires $6 million annually for slurry sealing, asphalt
overlays, and reconstructions to maintain the City's Pavement Condition Index rating. This fiscal year's CIP lists
other road maintenance projects and CDBG projects. This project outlines the remaining funding needs from
Gas Tax, Measure M2, and Capital Projects. Approximately $6.8 million of new funding will be allocated to the
various roadway management projects for this fiscal year.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Traffic Improvement - Measure M2;
Gas Tax Maintenance; Rmra Road Maintenance
Rehabilitation Account; Capital Projects; Reimbursable
Capital Projects
FINANCIAL SUMMARY
13120
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Special revenue fund
(274) Rmra Road Maint Rehabilitation Account $3,000,000 $3,400,000 $3,500,000 $3,600,000 $3,700,000
(263) Traffic Improvemnt -Measure M2 $2,700,000 $2,700,000 $3,000,000 $3,000,000 $3,100,000
(270) Gas Tax Maintenance $0 $250,000 $200,000 $150,000 $100,000
SPECIAL REVENUE FUND TOTAL $5,700,000 $6,350,000 $6,700,000 $6,750,000 $6,900,000
Capital projects funds
(500) Capital Projects $1,100,000 $1,200,000 $1,200,000 $1,300,000 $1,300,000
CAPITAL PROJECTS FUNDS TOTAL $1,100,000 $1,200,000 $1,200,000 $1,300,000 $1,300,000
TOTAL $6,800,000 $7,550,000 $7,900,000 $8,050,000 $8,200,000
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
100
13816 STRUCTURAL EVALUATION OF CITY
BRIDGES
PROJECT DESCRIPTION
Currently, there are eight roadway bridges located throughout the City that require maintenance. Caltrans has
inspected those bridges and has made recommendations for maintenance and repair. A maintenance and
retrofit plan are ready for implementation. The City is waiting for Caltrans to program construction funding due
to existing funding being no longer available. The project is expected to receive funding for construction phase
in FY 24-25.
PROJECT DETAILS
Project Type: One-Time
Estimated Completion Date: December 2026
Funding Source(s): Gas Tax Maintenance;
Reimbursable Capital Projects
FINANCIAL SUMMARY
13816
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Capital projects funds
(550) Reimbursable Capital Projects $0 $2,000,000 $0 $0 $0
CAPITAL PROJECTS FUNDS TOTAL $0 $2,000,000 $0 $0 $0
TOTAL $0 $2,000,000 $0 $0 $0
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
101
14997 MUNICIPAL PARKING LOT MAINTENANCE
PROJECT DESCRIPTION
This project rehabilitates municipal parking lots every seven years and any maintenance issues annually. Work
consists of slurry sealing, crack filling, removing and replacing defective asphalt concrete paving, striping,
asphalt concrete overlays, miscellaneous delineation, and wheel stops. This project also includes the
maintenance and renovation of trash enclosures.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Capital Projects; Parking In Lieu
FINANCIAL SUMMARY
14997
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Capital projects funds
(500) Capital Projects $20,000 $20,000 $20,000 $20,000 $20,000
(555) Parking In Lieu $2,000 $2,000 $2,000 $2,000 $2,000
CAPITAL PROJECTS FUNDS TOTAL $22,000 $22,000 $22,000 $22,000 $22,000
TOTAL $22,000 $22,000 $22,000 $22,000 $22,000
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
102
15508 SEWER LINE MAINTENANCE &
REPLACEMENT
PROJECT DESCRIPTION
This project annually fixes hot spots due to root intrusion, offset joints, and damaged sewer mains. It also
replaces both hydraulically and structurally deficient sewer mains. As part of the 2023 Sanitation Fee study, a
new capital improvement component has been established to address the replacement and upgrade needs of
the City’s sewer system. This fiscal year, $2.4 million is available to fund necessary sewer facility improvements
at various locations citywide.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Sewer Construction
FINANCIAL SUMMARY
15508
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Enterprise Fund
(520) Sewer Construction $2,367,750 $2,438,783 $2,511,946 $2,587,304 $2,664,923
ENTERPRISE FUND TOTAL $2,367,750 $2,438,783 $2,511,946 $2,587,304 $2,664,923
TOTAL $2,367,750 $2,438,783 $2,511,946 $2,587,304 $2,664,923
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
103
15509 SEWER CLEANING & VIDEO
PROJECT DESCRIPTION
The State's Waste Discharge Elimination (WDR) requires the City to complete a condition assessment of its entire
300+ mile sewer line system and develop a rehabilitation and replacement plan. Additional contract services are
needed to comply with WDR requirements.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Sewer
FINANCIAL SUMMARY
15509
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Enterprise Fund
(220) Sewer $400,000 $500,000 $500,000 $500,000 $500,000
ENTERPRISE FUND TOTAL $400,000 $500,000 $500,000 $500,000 $500,000
TOTAL $400,000 $500,000 $500,000 $500,000 $500,000
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
104
16065 QUIET ZONE MAINTENANCE
PROJECT DESCRIPTION
This project provides for the annual Quiet Zone and Safe Railroad Crossing maintenance agreement with
Southern California Regional Rail Authority and any related maintenance or improvements necessary for
compliance.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Capital Projects; City Trf: Merged
2008 Tax Exempt Bonds
FINANCIAL SUMMARY
16065
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Capital projects funds
(954) City Trf: Merged 2008 Tax Exempt Bonds $50,000 $50,000 $50,000 $50,000 $50,000
CAPITAL PROJECTS FUNDS TOTAL $50,000 $50,000 $50,000 $50,000 $50,000
TOTAL $50,000 $50,000 $50,000 $50,000 $50,000
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
105
16302 MINOR TRAFFIC CONTROL DEVICES
PROJECT DESCRIPTION
This project provides for minor traffic control devices such as signage, striping, lighting, undergrounding, wiring,
and other traffic-related devices and appurtenances as directed by the Traffic Commission and City Traffic
Engineer.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Traffic Improvement - Measure M2;
Capital Projects
FINANCIAL SUMMARY
16302
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Capital projects funds
(500) Capital Projects $200,000 $200,000 $200,000 $200,000 $200,000
CAPITAL PROJECTS FUNDS TOTAL $200,000 $200,000 $200,000 $200,000 $200,000
Special revenue fund
(263) Traffic Improvemnt -Measure M2 $50,000 $50,000 $50,000 $50,000 $50,000
SPECIAL REVENUE FUND TOTAL $50,000 $50,000 $50,000 $50,000 $50,000
TOTAL $250,000 $250,000 $250,000 $250,000 $250,000
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
106
16304 BIENNIAL TRAFFIC SIGNAL
COORDINATION
PROJECT DESCRIPTION
This project is for the on-going implementation of studies and improvements for traffic signals along the City's
major arterials within its boundaries. The studies include traffic counts, analysis of traffic flows, provide signal
timing, and synchronization. The project will provide for the traffic signal infrastructure improvements
necessary to achieve optimum signal timing and synchronization. The coordinated signal timing will be
implemented through the City's Traffic Management Center. Changes in traffic flow require updating at two-
year intervals. The traffic signal coordination will reduce travel times, save on gas, and reduce vehicle
emissions.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Traffic Improvement - Measure M2
FINANCIAL SUMMARY
16304
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Special revenue fund
(263) Traffic Improvemnt -Measure M2 $0 $95,000 $0 $95,000 $0
SPECIAL REVENUE FUND TOTAL $0 $95,000 $0 $95,000 $0
TOTAL $0 $95,000 $0 $95,000 $0
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
107
16305 TRAFFIC SIGNAL CONTROLLER
CHANGEOUT
PROJECT DESCRIPTION
The City maintains 158 traffic signals. Nearly two-thirds of the controllers have recently been updated or replaced
to allow for better coordination with the City's Transportation Management Center (TMC). The project is an on-
going process of updating or replacing controllers, signal cabinets and communication equipment, CCTV
cameras, traffic signal battery backups, future signal controller needs, and upgrading TMC equipment and
software.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Gas Tax Maintenance; Capital
Projects
FINANCIAL SUMMARY
16305
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Special revenue fund
(270) Gas Tax Maintenance $100,000 $100,000 $100,000 $100,000 $100,000
SPECIAL REVENUE FUND TOTAL $100,000 $100,000 $100,000 $100,000 $100,000
TOTAL $100,000 $100,000 $100,000 $100,000 $100,000
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
108
16469 TRAFFIC SIGNAL EQUIPMENT PAINTING
PROJECT DESCRIPTION
This project provides for the painting, wrapping, or application of an anti-graffiti coating to traffic signal
equipment at intersections within the City. The paint on the City's traffic signal equipment (signal and pedestrian
heads, pedestrian push buttons, and cabinets) requires routine maintenance to prevent deterioration. The City
has 158 signalized intersections and this project would fund a portion of the intersections as needed.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Traffic Improvement - Measure M2;
TSIP Citywide
FINANCIAL SUMMARY
16469
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Special revenue fund
(263) Traffic Improvemnt -Measure M2 $45,000 $45,000 $45,000 $45,000 $45,000
SPECIAL REVENUE FUND TOTAL $45,000 $45,000 $45,000 $45,000 $45,000
TOTAL $45,000 $45,000 $45,000 $45,000 $45,000
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
109
19809 CITY FACILITY IMPROVEMENTS
PROJECT DESCRIPTION
The Citywide Facilities Conditions Assessment (FCA) report identifies high priority facilities projects, and will
continually be used as a tool in planning the City’s future facility improvements. Work Items include
improvements at the Civic Center and other City facilities. Projects prioritized for Fiscal Year 2023-2024 are as
follows:
Roof replacement at Fire Station 7 and Corp Yard Building 11.
Plumbing repairs and upgrades at the Civic Center2.
Installation of iron fencing at the Police Department to enhance security3.
Interior upgrades at the Community Services building4.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Sanitation and Sewer; Reimbursable Capital Projects; Major Building Improvements;
Capital Projects; City Trf: Merged 2008 Tax Exempt Bonds
FINANCIAL SUMMARY
19809
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Capital projects funds
(500) Capital Projects $725,000 $0 $0 $0 $0
(954) City Trf: Merged 2008 Tax Exempt Bonds $156,000 $0 $0 $0 $0
CAPITAL PROJECTS FUNDS TOTAL $881,000 $0 $0 $0 $0
TOTAL $881,000 $0 $0 $0 $0
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
110
19826 POLICE HEADQUARTERS EXTERIOR WALL
SEALING
PROJECT DESCRIPTION
The ceramic tile exterior of the Police Headquarters requires cleaning and sealing every five years to prevent
internal damage from rainwater. This project accumulates funding which is critical for the maintenance of the
Police Headquarters and will also fund other water leak repair costs.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Major Building Improvements;
Capital Projects; City Trf: Merged 2008 Tax Exempt
Bonds
FINANCIAL SUMMARY
19826
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Capital projects funds
(954) City Trf: Merged 2008 Tax Exempt Bonds $20,000 $20,000 $20,000 $20,000 $20,000
CAPITAL PROJECTS FUNDS TOTAL $20,000 $20,000 $20,000 $20,000 $20,000
TOTAL $20,000 $20,000 $20,000 $20,000 $20,000
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
111
19999 MOTOR VEHICLE REPLACEMENTS
PROJECT DESCRIPTION
This project funds the replacement vehicles in the City's fleet. Fiscal Year 2024 replacements include four
vehicles for the Fire Department, thirteen vehicles for the Police Department, and eight vehicles for Public
Works. In addition, the Air Pollution Reduction (AQMD) Fund will fund the replacement of one electric vehicle
for Community Development and one electric vehicle for Public Works. Lastly, the Energy Efficiency and
Conservation Block Grant will fund three electric vehicles for the Police Department and two electric vehicles
for Public Works.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Ab 2766 Air Pollution Reduction;
Water; Equipment Replacement; Reimbursable Capital
Projects
FINANCIAL SUMMARY
19999
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Internal service funds
(720) Equipment Replacement $4,063,998 $0 $0 $0 $0
INTERNAL SERVICE FUNDS TOTAL $4,063,998 $0 $0 $0 $0
Capital projects funds
(550) Reimbursable Capital Projects $299,000 $0 $0 $0 $0
CAPITAL PROJECTS FUNDS TOTAL $299,000 $0 $0 $0 $0
Special revenue fund
(245) Ab 2766 Air Pollution Reduction $86,000 $0 $0 $0 $0
SPECIAL REVENUE FUND TOTAL $86,000 $0 $0 $0 $0
TOTAL $4,448,998 $0 $0 $0 $0
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
112
20374 STREETLIGHT POLE REPLACEMENT
PROGRAM
PROJECT DESCRIPTION
As a cost-saving measure, the City acquired an additional 4,359 streetlight poles from Southern California
Edison (SCE) in Fiscal Year 2018. Over half the poles are steel poles. An annual pole replacement program is
necessary to maintain the acquired streetlight infrastructure. This program will biannually replace 40 steel
streetlight poles with City standard LED-retrofitted concrete poles and underground overhead wires. Additionally,
this project provides for miscellaneous lighting, undergrounding, wiring, and pole knock downs.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Capital Projects
FINANCIAL SUMMARY
20374
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Capital projects funds
(500) Capital Projects $470,000 $470,000 $470,000 $470,000 $470,000
CAPITAL PROJECTS FUNDS TOTAL $470,000 $470,000 $470,000 $470,000 $470,000
Special revenue fund
(263) Traffic Improvemnt -Measure M2 $30,000 $30,000 $30,000 $30,000 $30,000
SPECIAL REVENUE FUND TOTAL $30,000 $30,000 $30,000 $30,000 $30,000
TOTAL $500,000 $500,000 $500,000 $500,000 $500,000
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
113
20378 KATELLA & BATAVIA SIGNAL NETWORK
EXTENSION
PROJECT DESCRIPTION
The project will extend the existing City's Traffic Signal Network along Katella Avenue from Main Street to
Struck Avenue and along Batavia Street from Katella Avenue to Palm Avenue. The installation of fiber optic
lines will enable the City's Traffic Management Center to communicate with the traffic signals along critical
arterials to improve traffic signal operations, and traffic flow. This will also allow immediate incident monitoring
and response to reduce traffic congestion.
PROJECT DETAILS
Project Type: One-Time
Estimated Completion Date: July 2024
Funding Source(s): TSIP Citywide*
*Project funding includes development impact fees.
Funding is dependent on receipt of development
revenue.
FINANCIAL SUMMARY
20378
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Special revenue fund
(287) TSIP Citywide $0 $150,000 $0 $0 $0
SPECIAL REVENUE FUND TOTAL $0 $150,000 $0 $0 $0
TOTAL $0 $150,000 $0 $0 $0
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
114
20379 BATAVIA & TAFT SIGNAL NETWORK
EXTENSION
PROJECT DESCRIPTION
The project will extend the existing City's Traffic Signal Network along Taft Avenue from Shaffer Street to Main
Street and along Batavia Street from Taft Avenue to Fletcher Avenue. The installation of fiber optic lines will
enable the City's Traffic Management Center to communicate with the traffic signals along critical arterials to
improve traffic signal operations, and traffic flow. This will also allow immediate incident monitoring and
response to reduce traffic congestion.
PROJECT DETAILS
Project Type: One-Time
Estimated Completion Date: July 2024
Funding Source(s): TSIP Citywide*
*Project funding includes development impact fees.
Funding is dependent on receipt of development
revenue.
FINANCIAL SUMMARY
20379
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Special revenue fund
(287) TSIP Citywide $620,000 $0 $0 $0 $0
SPECIAL REVENUE FUND TOTAL $620,000 $0 $0 $0 $0
TOTAL $620,000 $0 $0 $0 $0
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
115
20380 GLASSELL STREET SIGNAL NETWORK
EXTENSION
PROJECT DESCRIPTION
The project will extend the existing City's Traffic Signal Network along Taft Avenue from Shaffer Street to
Glassell Street and along Glassell Street from Taft Avenue to Lincoln Avenue. This will connect to the existing
fiber lines on Glassell Street from Lincoln Avenue to Riverdale Avenue. The installation of fiber optic lines will
enable the City's Traffic Management Center to communicate with the traffic signals along critical arterials to
improve traffic signal operations and traffic flow. This will also allow immediate incident monitoring and
response to reduce traffic congestion. Current funding is for design of the project while construction funding is
requested.
PROJECT DETAILS
Project Type: One-Time
Estimated Completion Date: July 2024
Funding Source(s): TSIP Citywide*
*Project funding includes development impact fees.
Funding is dependent on receipt of development
revenue.
FINANCIAL SUMMARY
20380
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Special revenue fund
(287) TSIP Citywide $1,020,000 $0 $0 $0 $0
SPECIAL REVENUE FUND TOTAL $1,020,000 $0 $0 $0 $0
TOTAL $1,020,000 $0 $0 $0 $0
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
116
20397 PARKER STREET RESTRIPING
PROJECT DESCRIPTION
This project will provide for the ultimate roadway configuration as the City builds out and adjacent parcels
potentially redevelop. By reorganizing the existing paved roadway, this will provide features necessary to best
serve various road users.
PROJECT DETAILS
Project Type: One-Time
Estimated Completion Date: July 2028
Funding Source(s): Reimbursable Capital Projects
FINANCIAL SUMMARY
20397
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Capital projects funds
(550) Reimbursable Capital Projects $0 $0 $0 $0 $100,000
CAPITAL PROJECTS FUNDS TOTAL $0 $0 $0 $0 $100,000
TOTAL $0 $0 $0 $0 $100,000
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
117
20430 STORM DRAIN IMPROVEMENTS
PROJECT DESCRIPTION
This project replaces existing deficient drainage systems and constructs new storm drain lines as needed per the
Master Plan of Drainage to alleviate localized flooding.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Sewer
FINANCIAL SUMMARY
20430
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Enterprise Fund
(220) Sewer $400,000 $500,000 $500,000 $500,000 $500,000
ENTERPRISE FUND TOTAL $400,000 $500,000 $500,000 $500,000 $500,000
TOTAL $400,000 $500,000 $500,000 $500,000 $500,000
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
118
20461 MAIN LIBRARY FACILITY IMPROVEMENTS
PROJECT DESCRIPTION
This project will encompass all facility improvements for Main Library. The north and south entrance automatic
doors need to be replaced. The dumbwaiter elevator which transports surplus books to the basement needs to
be replaced. Funding for replacement of the entrance doors and dumbwaiter projects reflects revenue received
from the Building Forward Main Grant.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Library Facility Fees; Major
Building Improvements; Capital Projects
FINANCIAL SUMMARY
20461
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Capital projects funds
(500) Capital Projects $130,000 $0 $0 $0 $0
CAPITAL PROJECTS FUNDS TOTAL $130,000 $0 $0 $0 $0
TOTAL $130,000 $0 $0 $0 $0
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
119
20483 POLICE FACILITY IMPROVEMENTS
PROJECT DESCRIPTION
This project will encompass miscellaneous facility improvements for police facilities including paint, carpet, and
lighting. This project will refresh interior paint throughout the department and replace existing carpet and
baseboards that have far exceeded its life expectancy. Additionally, the scope of work includes replacing existing
lighting with energy efficient lighting to properly illuminate current workstations and offices. One division will be
revitalized with new carpet and lighting each year over a span of three years.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Police Facility Fees; Capital
Projects; City Trf: Merged 2008 Tax Exempt Bonds
FINANCIAL SUMMARY
20483
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Capital projects funds
(954) City Trf: Merged 2008 Tax Exempt Bonds $100,000 $100,000 $0 $0 $0
CAPITAL PROJECTS FUNDS TOTAL $100,000 $100,000 $0 $0 $0
TOTAL $100,000 $100,000 $0 $0 $0
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
120
20494 ADMINISTRATION BUILDING LOBBY
IMPROVEMENTS
PROJECT DESCRIPTION
This project will remodel the City Clerk’s Office and Lobby with a design aesthetic that pays homage to the mid-
century architecture of the building. One of the goals of the design will be to provide functionality and integration
of current technology within a historic resource. The Administration Building’s Lobby will be remodeled to add
additional office spaces to better serve the City Clerk’s functions. The project will include new work stations,
electrical and HVAC improvements, floor asbestos abatement, and carpet replacement. This will assist the City
Clerk's customer service efforts. In addition, the City Clerk’s front counter area will be improved to allow more
efficient interactions with the public. The budget will also include new furniture for the Weimer Room.
PROJECT DETAILS
Project Type: One-Time
Estimated Completion Date: December 2024
Funding Source(s): Capital Projects
FINANCIAL SUMMARY
20494
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Capital projects funds
(954) City Trf: Merged 2008 Tax Exempt Bonds $1,578,622 $0 $0 $0 $0
(553) CAPITAL BOND PROCEEDS $642,050 $0 $0 $0 $0
(500) Capital Projects $445,000 $0 $0 $0 $0
CAPITAL PROJECTS FUNDS TOTAL $2,665,672 $0 $0 $0 $0
TOTAL $2,665,672 $0 $0 $0 $0
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
121
20518 PEDESTRIAN BEACON UPGRADES
PROJECT DESCRIPTION
This project will upgrade and modernize existing flashing beacon systems at several pedestrian crossings
throughout the City. Existing beacons that either flash perpetually or must be manually activated/de-activated
will be replaced with push buttons that will activate the beacons on demand. In addition, circular beacons will
be upgraded to newer rapid rectangular flashing beacons, which are expected to enhance visibility to
motorists. The project will also involve minor modifications to/refurbishment of ancillary equipment, roadway
features, and traffic control devices, including, but not limited to, poles, pavement markings, signs, and curb
ramps.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Capital Projects; Reimbursable
Capital Projects
FINANCIAL SUMMARY
20518
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Capital projects funds
(550) Reimbursable Capital Projects $249,570 $0 $0 $0 $0
(500) Capital Projects $27,730 $0 $0 $0 $0
CAPITAL PROJECTS FUNDS TOTAL $277,300 $0 $0 $0 $0
TOTAL $277,300 $0 $0 $0 $0
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
122
20522 EVALUATION OF SMART PARKING DEVICES
FOR OLD TOWNE
PROJECT DESCRIPTION
Identified as a game-changing tool for parking management, “smart” parking technologies can increase the
efficiency of existing parking infrastructure by providing real time, app-based information that’s easily
accessible to visitors. In addition, smart parking equipment can be designed for compatibility with future
mobility initiatives, and serve as the foundation for other types of parking management programs currently
being reviewed. The purpose of this evaluation is to explore and identify feasible options for smart parking
systems and products, including those that are cost-effective, reliable, have the potential for phased
deployment best fitting the City’s needs, and can be aesthetically customized to blend in with Old Towne
Orange.
PROJECT DETAILS
Project Type: One-Time
Estimated Completion Date: July 2024
Funding Source(s): Old Towne Parking Facility
FINANCIAL SUMMARY
20522
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Capital projects funds
(555) Parking In Lieu $50,000 $0 $0 $0 $0
CAPITAL PROJECTS FUNDS TOTAL $50,000 $0 $0 $0 $0
TOTAL $50,000 $0 $0 $0 $0
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
123
20525 SANTIAGO CANYON ROAD SIGNAL
NETWORK EXTENSION
PROJECT DESCRIPTION
The project will extend the existing City's Traffic Signal Network along Santiago Canyon Road from Cannon
Street to Chapman Avenue. The installation of fiber optic lines will enable the City's Traffic Management
Center to communicate with the traffic signals along critical arterials to improve traffic signal operations, and
traffic flow. This will also allow immediate incident monitoring and response to reduce traffic congestion.
PROJECT DETAILS
Project Type: One-Time
Estimated Completion Date: December 2029
Funding Source(s): TSIP Citywide*
*Project funding includes development impact fees.
Funding is dependent on receipt of development
revenue.
FINANCIAL SUMMARY
20525
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Special revenue fund
(287) TSIP Citywide $0 $0 $0 $0 $250,000
SPECIAL REVENUE FUND TOTAL $0 $0 $0 $0 $250,000
TOTAL $0 $0 $0 $0 $250,000
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
124
20527 BICYCLE MASTER PLAN UPDATE
PROJECT DESCRIPTION
The city’s Bicycle Master Plan is due for a major update. As the region builds out, traffic forecasts can evolve,
along with preferred modes of transportation and recreation. The resulting change presents both an
opportunity and responsibility to revise the city’s bicycle network in a manner that best serves future needs.
This update will include a comprehensive examination of the city’s existing and future bikeway system
(including bicycle routes, lanes, paths, and multi-use trails,) validating future facilities that were previously
identified while exploring new possibilities. It would also take a holistic approach, considering local
connections and integration with the regional bikeway system that surrounds Orange. And, it will contemplate
the appropriateness of new bicycle facility treatments, technologies, and design standards that were not yet
recognized or developed at the time of the previous update, with the goal of making the city’s roads safer and
more comfortable for all users. The final document is expected to increase accessibility to grant funding.
PROJECT DETAILS
Project Type: One-Time
Estimated Completion Date: December 2024
Funding Source(s): TSIP Citywide*
*Project funding includes development impact fees.
Funding is dependent on receipt of development
revenue.
FINANCIAL SUMMARY
20527
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Special revenue fund
(287) TSIP Citywide $100,000 $0 $0 $0 $0
SPECIAL REVENUE FUND TOTAL $100,000 $0 $0 $0 $0
TOTAL $100,000 $0 $0 $0 $0
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
125
30019 SANTIAGO CANYON ROAD MULTIPURPOSE
TRAIL
PROJECT DESCRIPTION
Construction of a multipurpose trail adjacent to Santiago Canyon Road connecting the existing trail at the
reserve neighborhood to Cannon Street. The trail would be constructed of decomposed granite, and would
allow travel for pedestrians, equestrians, and bicycles. Community Services will be seeking grant funding
sources for both the design and implementation of the project.
PROJECT DETAILS
Project Type: One-Time
Estimated Completion Date: June 2026
Funding Source(s): Reimbursable Capital Projects
FINANCIAL SUMMARY
30019
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Capital projects funds
(550) Reimbursable Capital Projects $0 $75,000 $750,000 $0 $0
CAPITAL PROJECTS FUNDS TOTAL $0 $75,000 $750,000 $0 $0
TOTAL $0 $75,000 $750,000 $0 $0
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
126
30150 LOCAL ROADWAY SAFETY PLAN
PROJECT DESCRIPTION
This project develops a Local Road Safety Plan (LRSP) that will define goals, objectives, and strategies to
reduce accidents on local roads. The LRSP will also provide a framework to identify, analyze, and prioritize
roadway safety improvements and offers a proactive approach to addressing safety needs while
demonstrating agency responsiveness to safety challenges. The scope of work includes the following key
tasks: state of the system review, accident history assessment, countermeasure development, implementation
program, and development of the LRSP document. This project also includes an update which is required by
CalTrans every 5 years.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Traffic Improvement - Measure M2;
Reimbursable Capital Projects
FINANCIAL SUMMARY
30150
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Special revenue fund
(263) Traffic Improvemnt -Measure M2 $0 $0 $0 $0 $50,000
SPECIAL REVENUE FUND TOTAL $0 $0 $0 $0 $50,000
TOTAL $0 $0 $0 $0 $50,000
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
127
30165 GRAND STREET PARKING LOT
IMPROVEMENT
PROJECT DESCRIPTION
This project includes demolition of City properties on the west side of Grand Street and would include the
consolidation of City parking lots. The scope of work also includes earthwork, construction of new asphalt
concrete pavement, driveways, curb and gutter, and sidewalk, installation of a new irrigation system,
landscaping, parking lot lighting, signage, and parking lot striping.
PROJECT DETAILS
Project Type: One-Time
Estimated Completion Date: June 2025
Funding Source(s): Capital Bond Proceeds; City Trf:
Merged 2008 Tax Exempt Bonds
FINANCIAL SUMMARY
30165
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Capital projects funds
(954) City Trf: Merged 2008 Tax Exempt Bonds $750,000 $0 $0 $0 $0
CAPITAL PROJECTS FUNDS TOTAL $750,000 $0 $0 $0 $0
TOTAL $750,000 $0 $0 $0 $0
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
128
30220 FISCAL YEAR 2024 CDBG NEIGHBORHOOD
STREET REHABILITATION
PROJECT DESCRIPTION
This project will rehabilitate Flower Street, Grand Street, Highland Street, La Veta Park Circle, Tularosa
Avenue, and Pine Street within various neighborhoods city-wide, which includes but is not limited to, cold
planning (milling) the existing asphalt, asphalt concrete overlay installation, slurry seal, reconstruction of
sidewalks, curb and gutters, driveways, cross gutters, spandrels, and corresponding adjustment of manholes
and water valves to grade on residential streets.
PROJECT DETAILS
Project Type: One-Time
Estimated Completion Date: February 2024
Funding Source(s): Community Development Block
Grant
FINANCIAL SUMMARY
30220
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Special revenue fund
(310) Community Development Block Grant $839,612 $0 $0 $0 $0
SPECIAL REVENUE FUND TOTAL $839,612 $0 $0 $0 $0
TOTAL $839,612 $0 $0 $0 $0
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
129
20191 MAIN STREET SIGNAL SYNCHRONIZATION
CARRYOVER PROJECT
PROJECT DESCRIPTION
The Main Street Traffic Signal Synchronization Project is a multi-jurisdictional project between Culver Drive in
Irvine and Taft Avenue in Orange. The corridor is about twelve miles and includes 69 signals across the four
jurisdictions of Irvine, Caltrans, Santa Ana, and Orange. The corridor is between CHOC Court and Taft
Avenue and includes twelve traffic signals. The benefits of signal synchronization include a reduction in travel
time, improvement in travel speed, greenhouse gas reduction, less fuel consumption, and an overall better
travel experience. This Project will be led by OCTA. The programmed funds represent a 20% City fair share
contribution to the TSSP grant through M2 funding.
PROJECT DETAILS
Project Type: One-Time
Starting Fiscal Year: 2017-2018
Estimated Completion Date: December 2023
Funding Source(s): TSIP Citywide
Total Budget: $272,350
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
130
20255 SANTIAGO HILLS LAD GENERAL
RENOVATION
ONGOING PROJECT
PROJECT DESCRIPTION
Santiago Hills Landscape Assessment District (SHAD) residents voted in 2015 to increase their assessment
so that the landscape can be maintained, repaired, and renovated over time. This project represents a long-
term Capital Improvement effort to re-landscape SHAD as funding accumulates beyond what is needed for
ongoing maintenance. With the community’s input, funds will be utilized for landscape renovation to replace
plants, shrubs, and irrigation, which are beyond their useful life. In FY 21, the community identified the
following priorities.
The first two of the priorities were completed in FY 21. The third priority began in FY 23. Construction of the
project will continue as the fund balance is rebuilt. Additional priorities will need to be identified with further
community input in future years.
Renovation of the second half of Skylark, including the four corners on Skylark and Canyon View
Avenue
1.
Renovation of three small medians on Canyon View Avenue between Skylark and Old Camp Road, on
Skylark at Canyon View Avenue, and on White Oak Ridge at Canyon View Avenue
2.
Renovation of the corners at White Oak Ridge.3.
PROJECT DETAILS
Project Type: Ongoing
Starting Fiscal Year: 2015-2016
Funding Source(s): Santiago Hills Landscape
Maintenance 1986 & 2015
Total Budget: $800,000
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
131
20325 SANTIAGO BIKE TRAIL PHASE IV
CONTINUING PROJECT
PROJECT DESCRIPTION
This project is the final phase of the Santiago Creek Bike Trail alignment in the Master Bikeway Plan.
Construction of the multi-purpose trail will connect the existing bike trail west of Cannon Street and parallel the
existing equestrian trail on the northern bank and terminate at the Santiago Oaks Regional Park. The project
will construct an asphalt concrete bike trail and rehabilitate the existing equestrian trail with decomposed
granite along with needed amenities such as rest areas and trash receptacles. The trail will allow for
pedestrian and bicycle traffic along an eight-mile stretch of trails. The City received funding sources from
OCTA's BCIP Grant for this project's preliminary engineering and environmental costs. Estimated construction
costs are $10 million.
PROJECT DETAILS
Project Type: One-Time
Starting Fiscal Year: 2016-2017
Estimated Completion Date: December 2023
Funding Source(s): Capital Projects; Reimbursable
Capital Projects
Total Budget: $443,326
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
132
20329 CHAPMAN & BATAVIA LEFT TURN SIGNAL
MODIFICATION
CARRYOVER PROJECT
PROJECT DESCRIPTION
The project will provide for a protected left-turn phase for the northbound and southbound approaches on
Batavia Street at Chapman Avenue to improve operational efficiency and enhance safety. The addition of a
protected left turn is an effective countermeasure that can reduce the possibility of crashes. The scope of work
includes installation of signal poles and gear, controller and cabinet, CCTV camera, new conduits, wiring,
battery back-up system, loop detectors, ADA ramps, and restoration of existing improvements.
PROJECT DETAILS
Project Type: One-Time
Starting Fiscal Year: 2016-2017
Estimated Completion Date: December 2023
Funding Source(s): Reimbursable Capital Projects;
Traffic Improvement - Measure M2
Total Budget: $499,800
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
133
20353 CHAPMAN & GRAND LEFT TURN SIGNAL
MODIFICATION
CARRYOVER PROJECT
PROJECT DESCRIPTION
The project provides for a protected left-turn phase for the eastbound and westbound approaches on
Chapman Avenue at Grand Street. The proposed signal modification will enhance the capacity and improve
the traffic signal operation at the intersection. The project features decorative signal poles consistent with the
Old Towne District theme. The scope of work includes installation of signal poles and gear, controller and
cabinet, wiring, CCTV camera, electrical service; upgrading emergency vehicle preemption; and restoration of
existing improvements.
PROJECT DETAILS
Project Type: One-Time
Starting Fiscal Year: 2016-2017
Estimated Completion Date: June 2025
Funding Source(s): TSIP Citywide
Total Budget: $450,000
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
134
20354 CHAPMAN & CAMBRIDGE LEFT TURN
SIGNAL MODIFICATION
CARRYOVER PROJECT
PROJECT DESCRIPTION
The project provides for a protected left-turn phase for the eastbound, westbound, northbound, and southbound
approaches at Chapman Avenue and Cambridge Street. The proposed signal modification will enhance the
capacity and improve the traffic signal operation at the intersection. The scope of work includes installation of
signal poles and gear, controller and cabinet, wiring, CCTV camera, and electrical service and restoration of
existing improvements.
PROJECT DETAILS
Project Type: One-Time
Starting Fiscal Year: 2016-2017
Estimated Completion Date: June 2025
Funding Source(s): TSIP Citywide
Total Budget: $425,000
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
135
20376 GARDEN GROVE BOULEVARD SIGNAL
SYNCHRONIZATION
CARRYOVER PROJECT
PROJECT DESCRIPTION
The Garden Grove Boulevard Traffic Signal Synchronization Corridor is a multi-jurisdictional project between
Valley View Street in Garden Grove and Bristol Street in Santa Ana. The corridor is 8.7 miles and includes 34
signals across the five jurisdictions of Garden Grove, Caltrans, Westminster, Santa Ana, and Orange. In
Orange, there are two traffic signals along Garden Grove Boulevard, located at Lewis Street (shared with
Garden Grove) and at The City Drive. The benefits of signal synchronization include a reduction in travel time,
improvement in travel speed, greenhouse gas reduction, less fuel consumption, and an overall better travel
experience. This project will be led by OCTA. The programmed funds are City fair share contribution to the
TSSP grant, funded by M2.
PROJECT DETAILS
Project Type: One-Time
Starting Fiscal Year: 2017-2018
Estimated Completion Date: September 2023
Funding Source(s): TSIP Citywide
Total Budget: $7,000
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
136
20381 KATELLA AVENUE SIGNAL
SYNCHRONIZATION
CARRYOVER PROJECT
PROJECT DESCRIPTION
As part of an ongoing project, which began over ten years ago, the Katella Avenue Traffic Signal
Synchronization Corridor is a multi-jurisdictional project between the I-605 on-ramp in Los Alamitos and
Jamboree Road/Santiago Canyon Road in Orange. The corridor is 19.6 miles and includes 73 signals across
the nine jurisdictions of Los Alamitos, Caltrans, Cypress, Stanton, County of Orange, Garden Grove, Anaheim,
Villa Park, and Orange. In Orange, the corridor is between Struck Avenue and Santiago Canyon
Road/Jamboree Road and includes nineteen traffic signals. The benefits of signal synchronization include a
reduction in travel time, improvement in travel speed, greenhouse gas reduction, less fuel consumption, and
an overall better travel experience. This project will be led by OCTA. The programmed funds are the City's fair
share contribution to the TSSP grant-funded by M2.
PROJECT DETAILS
Project Type: One-Time
Starting Fiscal Year: 2017-2018
Estimated Completion Date: September 2023
Funding Source(s): TSIP Citywide
Total Budget: $250,000
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
137
20382 KATELLA AVENUE SIGNAL NETWORK
EXTENSION
CARRYOVER PROJECT
PROJECT DESCRIPTION
The project will extend the existing City's Traffic Signal Network along Katella Avenue from Tustin Street to
Santiago Boulevard and on Santiago Boulevard from Katella Avenue to Meats Avenue. The installation of fiber
optic lines will enable the City's Traffic Management Center to communicate with the traffic signals along
critical arterials to improve traffic signal operations and traffic flow. This will also allow immediate incident
monitoring and response to reduce traffic congestion. Construction of improvements include upgrades to the
controller cabinet and communication appurtenances.
PROJECT DETAILS
Project Type: One-Time
Starting Fiscal Year: 2017-2018
Estimated Completion Date: July 2024
Funding Source(s): TSIP Citywide
Total Budget: $1,400,000
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
138
20383 CANNON & SERRANO INTERSECTION
MODIFICATION
CARRYOVER PROJECT
PROJECT DESCRIPTION
This project will add a second dedicated right-turn lane on northbound Cannon Street to eastbound Serrano
Avenue, in order to accommodate the increase in right-turn movements. The project will also widen the northerly
curb face on Serrano Avenue in order to mitigate the bottlenecking effect of the existing two left-turn lanes for
Southbound Serrano Avenue. Public Works is working on the construction phase of the project and anticipates
completion by July 2023.
PROJECT DETAILS
Project Type: One-Time
Starting Fiscal Year: 2017-2018
Estimated Completion Date: July 2023
Funding Source(s): Traffic Improvement - Measure M2;
TSIP Citywide; Reimbursable Capital Projects
Total Budget: $1,092,419
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
139
20425 TUSTIN STREET SIGNAL
SYNCHRONIZATION
CARRYOVER PROJECT
PROJECT DESCRIPTOIN
The Tustin Street Traffic Signal Synchronization project a multi-jurisdictional project between First Street in Tustin
and Wabash Avenue in Yorba Linda. The corridor is over eleven miles and includes 55 signals across seven
jurisdictions. 25 of the signals are within the City of Orange. The benefits of signal synchronization include a
reduction in travel time, improvement in travel speed, greenhouse gas reduction, less fuel consumption, and an
overall better travel experience. This project will be led by City of Orange and primarily funded through OCTA's
M2.
PROJECT DETAILS
Project Type: One-Time
Starting Fiscal Year: 2019-2020
Estimated Completion Date: June 2025
Funding Source(s): TSIP Citywide; Reimbursable
Capital Projects
Total Budget: $3,485,588
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
140
20443 ORANGE COMMUNITY SHUTTLE
FEASIBILITY STUDY
CARRYOVER PROJECT
PROJECT DESCRIPTION
This project will explore opportunities and benefits for a new community shuttle service. The service could
provide an alternative to driving while connecting key destinations such as the Outlets of Orange, medical
corridor, Old Towne, and Chapman University.
PROJECT DETAILS
Project Type: One-Time
Starting Fiscal Year: 2019-2020
Estimated Completion Date: June 2024
Funding Source(s): Traffic Improvement - Measure M2;
Reimbursable Capital Projects
Total Budget: $75,000
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
141
20444 POLICE HEADQUARTERS ATRIUM
REHABILITATION
CARRYOVER PROJECT
PROJECT DESCRIPTION
The Citywide Facilities Conditions Assessment (FCA) was completed in 2016 and identified that the Police
Station Headquarters atrium glazing has reached the end of its life cycle. Public Works is working on the
construction phase of the project which consists of all required work to replace the existing skylight roof system
with a new metal deck and standing seam metal roof system and replace the facility’s HVAC system chiller, air
handlers and other components. The work also includes the installation of photovoltaic panels and
corresponding infrastructure on the existing building’s flat roof area. The electrical power generating system
shall be rated 153.6 kW (STC). System output may range between 228,204 kWh and 245,810 kWh per year.
PROJECT DETAILS
Project Type: One-Time
Starting Fiscal Year: 2019-2020
Estimated Completion Date: December 2023
Funding Source(s): Capital Bond Proceeds
Total Budget: $5,000,000
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
142
20462 TAFT LIBRARY FACILITY IMPROVEMENTS
CARRYOVER PROJECT
PROJECT DESCRIPTION
This project will encompass all facility improvements for Taft Library. The automatic entrance doors need to be
replaced. The windows are in need of replacement and reframing due to aging and vandalism. Funding for
replacement of the entrance doors and windows projects reflects revenue received from the Building Forward
Taft Grant.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Library Facility Fees; Major
Building Improvements; Capital Projects
Total Budget: $377,125
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
143
20463 EL MODENA LIBRARY FACILITY
IMPROVEMENTS
CARRYOVER PROJECT
PROJECT DESCRIPTION
This project will encompass all facility improvements for El Modena Library. The automatic entrance doors need
to be replaced. Roofing improvements are needed to mitigate leaks and restore its useful life. Funding for
replacement of the entrance doors and roofing projects reflects revenue received from the Building Forward El
Modena Grant.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Library Facility Fees; Major
Building Improvements; Capital Projects
Total Budget: $395,375
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
144
20465 FIRE STATIONS FACILITY IMPROVEMENTS
CARRYOVER PROJECT
PROJECT DESCRIPTION
This project will encompass miscellaneous improvements at all eight fire stations. This project will revitalize the
carpeting in three fire stations (2, 6, & 7). The carpets have seen a lot of wear and tear over the years and are
past their life expectancy. One station will be re-carpeted each year over a span of three years. This project will
also refresh outdated paint at two fire stations (2 & 3).
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Fire Facility Fee Districts All Com
6/07
Total Budget: $193,870
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
145
20485 TUSTIN STREET BIOCLEAN INSTALLATION
CARRYOVER PROJECT
PROJECT DESCRIPTION
This project will install a BioClean Separating Baffle Box or equal on Tustin Street north of Santiago Creek
Bridge. The existing storm drain system is a 4’x4’ reinforced concrete box that ultimately discharges into
Santiago Creek. The project will also install 11 connector pipe screens on Katella Avenue, Main Street, and La
Veta Avenue to capture litter from commercial sites.
PROJECT DETAILS
Project Type: One-Time
Starting Fiscal Year: 2020-2021
Estimated Completion Date: December 2023
Funding Source(s): Sewer; Reimbursable Capital
Projects
Total Budget: $627,200
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
146
20500 SYCAMORE & PALMYRA NEIGHBORHOODS
STREET REHABILITATION
CARRYOVER PROJECT
PROJECT DESCRIPTION
This project will rehabilitate Sycamore Avenue, Holly Street, Ash Street, Palmyra Avenue, Flower Street, and
Lilac Lane in the Sycamore and Palmyra Neighborhoods, which includes but not is limited to cold planing
(miling) the existing asphalt, asphalt concrete overlay installation, slurry seal, reconstruction of sidewalks, curb
and gutters, driveways, cross gutters, and corresponding adjustment of manholes and water valves to grade
on residential streets.
PROJECT DETAILS
Project Type: One-Time
Starting Fiscal Year: 2022-2023
Estimated Completion Date: December 2024
Funding Source(s): Community Block Grant
Total Budget: $629,530
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
147
30059 OCPT FACILITY IMPROVEMENTS
CARRYOVER PROJECT
PROJECT DESCRIPTION
The 501(c)(3) non-profit, Orange Children and Parents Together (OCPT) has an agreement with the City to utilize
facility space at the El Modena Branch Library. As part of their agreement, the City utilizes OCPT funding to make
various improvements at the facility to comply with State inspections and an aging facility.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): OCPT Building Maintenance
Total Budget: $95,000
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
148
30115 GLASSELL & PALMYRA SIGNAL
INSTALLATION
CARRYOVER PROJECT
PROJECT DESCRIPTION
The project will provide for the installation of a traffic signal at the intersection of Glassell Street and Palmyra
Avenue. The signalization of the intersection is an effective countermeasure that can reduce the possibility of
traffic incidents. The scope of work includes installation of signal poles, controller and cabinet, CCTV camera,
new conduit, signal wiring, loop detectors, ADA ramps, wireless antenna, dual meter service, emergency vehicle
preemption, and audible pedestrian push buttons.
PROJECT DETAILS
Project Type: One-Time
Starting Fiscal Year: 2018-2019
Estimated Completion Date: December 2024
Funding Source(s): Reimbursable Capital Projects
Total Budget: $708,200
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
149
30163 CHAPMAN AVENUE BIOCLEAN
INSTALLATION
CARRYOVER PROJECT
PROJECT DESCRIPTION
This project will install a BioClean Separating Baffle Box or equal on Chapman Avenue approximately 150 feet
west of Eckhoff Street. The existing storm drain system is a 66" storm drain line that ultimately discharges into
Bitterbush Channel located 2,000 feet downstream of the proposed location. The project will also install 13
connector pipe screens on Main Street, Brian Street, Chapman Avenue, and Katella Avenue to capture litter
from commercial and residential sites draining into the Santa Ana River.
PROJECT DETAILS
Project Type: One-Time
Starting Fiscal Year: 2020-2021
Estimated Completion Date: December 2023
Funding Source(s): Sewer; Reimbursable Capital
Projects
Total Budget: $386,004
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
150
30166 CAMBRIDGE STREET INFRASTRUCTURE
IMPROVEMENT
CARRYOVER PROJECT
PROJECT DESCRIPTION
This project will upsize the existing 18” Reinforced Concrete Pipe (RCP) storm drain line from Palm Avenue to
Walnut Avenue per the Master Plan of Drainage to alleviate localized flooding on Cambridge Street during 25-
year or higher storm events. Other improvements include replacement of deficient sewer and water mains. In
addition, Cambridge Street roadway pavement will be rehabilitated, and the existing concrete curb will be
replaced with new concrete curb and gutter. The project also includes replacing damaged sidewalk,
reconstructing existing ADA ramps to conform to federal guidelines, adjusting utility covers to grade, and
restriping the roadway. Staff is seeking federal funding through Hazard Mitigation grant for construction phase.
PROJECT DETAILS
Project Type: One-Time
Starting Fiscal Year: 2020-2021
Estimated Completion Date: December 2023
Funding Source(s): Sewer; Capital Projects; Sewer
Construction; Water
Total Budget: $2,103,000
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
151
30167 KATELLA AVENUE STREET
REHABILITATION
CARRYOVER PROJECT
PROJECT DESCRIPTION
This project includes rehabilitation pavement surfacing, replacement of failed pavement areas, replacement of
broken curb and gutter, reconstruction of ADA ramps to conform to federal guidelines, adjusting utility covers to
grade, and restriping the roadway on Katella Avenue from SR-55 to Harding Street. In addition, the existing
landscaped raised median will be enhanced with modifications to the irrigation system and with drought tolerant
and California native landscape.
PROJECT DETAILS
Project Type: One-Time
Starting Fiscal Year: 2020-2021
Estimated Completion Date: December 2023
Funding Source(s): Traffic Improvement - Measure M2
Total Budget: $870,000
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
152
30168 EAST WALNUT AVENUE INFRASTRUCTURE
IMPROVEMENT
CARRYOVER PROJECT
PROJECT DESCRIPTION
This project will construct a new 48” Reinforced Concrete Pipe (RCP) storm drain line on Walnut Avenue from
Cambridge Street to California Street per the Master Plan of Drainage to alleviate the localized flooding issue
on Walnut Avenue during a 25-year or higher storm events. Other improvements include replacement of
deficient sewer and water mains. In addition, Walnut Avenue from Cambridge Street to Tustin Street roadway
pavement will be rehabilitated, and the existing concrete curb will be replaced with new concrete curb and
gutter. The project also includes replacing damaged sidewalk, reconstructing existing ADA ramps to conform
to federal guidelines, adjusting utility covers to grade, and restriping the roadway.
PROJECT DETAILS
Project Type: One-Time
Starting Fiscal Year: 2020-2021
Estimated Completion Date: December 2023
Funding Source(s): Sewer; Traffic Improvement -
Measure M2; Sewer Construction; Water
Total Budget: $2,749,000
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
153
30174 CANNON STREET BRIDGE WIDENING
CARRYOVER PROJECT
PROJECT DESCRIPTION
This project widens portions of Cannon Street from Santiago Canyon Road to Serrano Avenue to add a third
northbound thru lane. The scope of work includes widening the bridge as well as the roadway north of the
bridge in order to maintain the continuity of the thru lane until Serrano Avenue where it would get dropped into a
dedicated right-turn lane to eastbound Serrano Avenue. The existing painted median will be replaced with a
raised median. All improvements fall within the City of Orange public right-of-way except for a portion between
Taft Avenue and Serrano Avenue which falls in City of Villa Park public right-of-way. Current funding is for the
preliminary engineering and environmental phase of the project.
PROJECT DETAILS
Project Type: One-Time
Starting Fiscal Year: 2020-2021
Estimated Completion Date: December 2023
Funding Source(s): TSIP Citywide; Reimbursable
Capital Projects
Total Budget: $206,250
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
154
30194 SANTIAGO CANYON ROAD
REHABILITATION
CARRYOVER PROJECT
PROJECT DESCRIPTION
This project will rehabilitate roadway pavement on Santiago Canyon Road from Newport Boulevard to
Jamboree Road. The work will include pavement rehabilitation, replacement of failed pavement areas,
damaged sidewalk and curb and gutter, removal and construction of existing ADA ramps to conform to federal
guidelines, adjustment of utility covers to grade, and restriping the roadway. The City was awarded funding
through OCTA's Pavement Management Relief Funding to assist with the construction of this project.
PROJECT DETAILS
Project Type: One-Time
Starting Fiscal Year: 2022-2023
Estimated Completion Date: December 2023
Funding Source(s): RMRA Road Maintenance
Rehabilitation; Reimbursable Capital Projects
Total Budget: $981,242
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
155
30215 TAFT AVENUE BIOCLEAN INSTALLATION &
LEWIS STREET WATER QUALITY IMPROVEMENTS
CARRYOVER PROJECT
PROJECT DESCRIPTION
This project will install a BioClean Debris Separating Baffle Box (DSBB) or equal on Taft Avenue east of the
intersection of Taft Avenue and O’Donnell Way. The existing storm drain system is a 36” reinforced concrete
pipe that ultimately discharges into Buckeye Channel. The project will also install seven connector pipe
screens (CPS) on various streets within the City. Four CPS units will be installed on Taft Avenue to capture
litter from manufacturing sites along Taft Avenue. Three CPS units will be installed on Lewis Street to capture
litter from commercial and residential sites along Lewis Street and Metropolitan Drive.
PROJECT DETAILS
Project Type: One-Time
Starting Fiscal Year: 2022-2023
Estimated Completion Date: December 2023
Funding Source(s): Sewer; Reimbursable Capital
Projects
Total Budget: $530,000
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS
FISCAL YEAR 2023-2024
156
FY 2023-2024 Budget
2023-2024 2024-2025 2025-2026 2026-2027 2027-2028 5 Year Total
18101 Water Utility Security Improvements 25,000 25,000 25,000 25,000 25,000 125,000
18102 Meter Replacement Program 175,000 175,000 175,000 175,000 175,000 875,000
18120 Well 28 Construction 4,000,000 ----4,000,000
18214 Well Rehabilitation 150,000 150,000 150,000 150,000 150,000 750,000
18225 Lower Serrano Pump Station ---1,800,000 1,600,000 3,400,000
18301 Exterior Cathodic Protection Systems 50,000 50,000 50,000 50,000 50,000 250,000
18302 Reservoir Recoating -50,000 750,000 --800,000
18315 Reservoir 3A Construction ---500,000 2,000,000 2,500,000
18324 Reservoir 2A Site Remediation ---1,000,000 -1,000,000
18400 Pipeline Renewal Projects 1,500,000 1,700,000 2,000,000 2,000,000 2,000,000 9,200,000
18912 Water Plant Telemetry 50,000 50,000 50,000 50,000 50,000 250,000
18925 Emergency Generator 250,000 --250,000 -500,000
20312 Well 29 Construction 3,200,000 3,500,000 2,700,000 --9,400,000
20429 South Yard Storage Replacement 200,000 ----200,000
20496 Reservoir 4A Construction ----200,000 200,000
Total 9,600,000 5,700,000 5,900,000 6,000,000 6,250,000 33,450,000
Project
Project Summary
PUBLIC WORKS - WATER
157
THIS PAGE INTENTIONALLYLEFT BLANK
158
18101 WATER UTILITY SECURITY IMPROVEMENTS
PROJECT DESCRIPTION
This project provides funding to replace and construct Water Utility Security improvements at various water
facilities as identified in the Water System Vulnerability Assessment. The improvement areas include block walls,
fencing, surveillance cameras, and other improvements.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Water
FINANCIAL SUMMARY
18101
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Enterprise Fund
(600) Water $25,000 $25,000 $25,000 $25,000 $25,000
ENTERPRISE FUND TOTAL $25,000 $25,000 $25,000 $25,000 $25,000
TOTAL $25,000 $25,000 $25,000 $25,000 $25,000
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS - WATER
FISCAL YEAR 2023-2024
159
18102 METER REPLACEMENT PROGRAM
PROJECT DESCRIPTION
This project provides for the repair or replacement of water meters in the water system to reduce water loss and
accurately bill for water usage. As part of the on-going 15-year small meter replacement program, an average of
1,800 small meters are replaced per year. Additionally, this project allows for the automated method of gathering
meter reads, consumption data, and other system information that will benefit water operations and customers.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Water
FINANCIAL SUMMARY
18102
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Enterprise Fund
(600) Water $175,000 $175,000 $175,000 $175,000 $175,000
ENTERPRISE FUND TOTAL $175,000 $175,000 $175,000 $175,000 $175,000
TOTAL $175,000 $175,000 $175,000 $175,000 $175,000
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS - WATER
FISCAL YEAR 2023-2024
160
18120 WELL 28 CONSTRUCTION
PROJECT DESCRIPTION
Well 28 is a proposed new 3,000 gallons per minute (GPM) groundwater production facility to be located at the
northeast corner of Maple Avenue and Lemon Street. The property was acquired through an exchange of lands
between the City and Chapman University. This project includes design, well drilling, pump installation,
electrical, storm drain, treatment, and a pocket park. The first phase of the project, design and well drilling, is
complete. The Orange County Water District is funding a conjunctive use program and treatment program to
assist with construction costs.
PROJECT DETAILS
Project Type: One-Time
Estimated Completion Date: September 2024
Funding Source(s): Water; Reimbursable Capital
Projects
FINANCIAL SUMMARY
18120
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Capital projects funds
(550) Reimbursable Capital Projects $2,000,000 $0 $0 $0 $0
CAPITAL PROJECTS FUNDS TOTAL $2,000,000 $0 $0 $0 $0
Enterprise Fund
(600) Water $2,000,000 $0 $0 $0 $0
ENTERPRISE FUND TOTAL $2,000,000 $0 $0 $0 $0
TOTAL $4,000,000 $0 $0 $0 $0
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS - WATER
FISCAL YEAR 2023-2024
161
18214 WELL REHABILITATION
PROJECT DESCRIPTION
This project provides for on-going inspection, repair, and refurbishment of 12 existing water wells.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Water
FINANCIAL SUMMARY
18214
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Enterprise Fund
(600) Water $150,000 $150,000 $150,000 $150,000 $150,000
ENTERPRISE FUND TOTAL $150,000 $150,000 $150,000 $150,000 $150,000
TOTAL $150,000 $150,000 $150,000 $150,000 $150,000
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS - WATER
FISCAL YEAR 2023-2024
162
18225 LOWER SERRANO PUMP STATION
PROJECT DESCRIPTION
This project includes the design and construction to complete the 100-horsepower pressure pump station in
northeast Orange. This pump station will move water from Zone 3 to Zone 4.
PROJECT DETAILS
Project Type: One-Time
Estimated Completion Date: July 2028
Funding Source(s): Water
FINANCIAL SUMMARY
18225
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Enterprise Fund
(600) Water $0 $0 $0 $1,800,000 $1,600,000
ENTERPRISE FUND TOTAL $0 $0 $0 $1,800,000 $1,600,000
TOTAL $0 $0 $0 $1,800,000 $1,600,000
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS - WATER
FISCAL YEAR 2023-2024
163
18301 EXTERIOR CATHODIC PROTECTION
SYSTEMS
PROJECT DESCRIPTION
This project provides for ongoing inspection, repair, and replacement of interior and exterior cathodic protection
systems for steel water tanks in the water system. Each of the steel tanks rely on a functioning cathodic
protection system for corrosion protection.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Water
FINANCIAL SUMMARY
18301
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Enterprise Fund
(600) Water $50,000 $50,000 $50,000 $50,000 $50,000
ENTERPRISE FUND TOTAL $50,000 $50,000 $50,000 $50,000 $50,000
TOTAL $50,000 $50,000 $50,000 $50,000 $50,000
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS - WATER
FISCAL YEAR 2023-2024
164
18302 RESERVOIR RECOATING
PROJECT DESCRIPTION
This project is part of a long-term reservoir maintenance program that provides for the repair and replacement of
exterior/interior protective coatings for all fifteen steel reservoirs in the water system.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Water
FINANCIAL SUMMARY
18302
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Enterprise Fund
(600) Water $0 $50,000 $750,000 $0 $0
ENTERPRISE FUND TOTAL $0 $50,000 $750,000 $0 $0
TOTAL $0 $50,000 $750,000 $0 $0
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS - WATER
FISCAL YEAR 2023-2024
165
18315 RESERVOIR 3A CONSTRUCTION
PROJECT DESCRIPTION
This project provides for the design and construction of a one million gallon steel water tank at a site directly
adjacent to the existing Reservoir 3. This tank will provide additional storage for existing residential needs and
fire protection for Zone 3 in northeast Orange.
PROJECT DETAILS
Project Type: One-Time
Estimated Completion Date: June 2029
Funding Source(s): Water
FINANCIAL SUMMARY
18315
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Enterprise Fund
(600) Water $0 $0 $0 $500,000 $2,000,000
ENTERPRISE FUND TOTAL $0 $0 $0 $500,000 $2,000,000
TOTAL $0 $0 $0 $500,000 $2,000,000
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS - WATER
FISCAL YEAR 2023-2024
166
18324 RESERVOIR 2A SITE REMEDIATION
PROJECT DESCRIPTION
This project provides for design, specifications, cost estimates, and construction of site stabilization for the
Reservoir 2A site in the Vista Royale Tract, located in northwest Orange. This existing facility is being monitored
for peripheral movement. The proposed remediation includes the installation of soldier piles and grade beams to
minimize future differential movement on site.
PROJECT DETAILS
Project Type: One-Time
Completion Date: June 2028
Funding Source(s): Water
FINANCIAL SUMMARY
18324
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Enterprise Fund
(600) Water $0 $0 $0 $1,000,000 $0
ENTERPRISE FUND TOTAL $0 $0 $0 $1,000,000 $0
TOTAL $0 $0 $0 $1,000,000 $0
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS - WATER
FISCAL YEAR 2023-2024
167
18400 PIPELINE RENEWAL PROJECTS
PROJECT DESCRIPTION
This project provides for the design and construction of water mainline replacements for the City's water system.
Approximately 1.5 miles of pipeline are targeted to be replaced annually due to increasing age, substandard
sizing, corrosion, or high maintenance.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Water
FINANCIAL SUMMARY
18400
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Enterprise Fund
(600) Water $1,500,000 $1,700,000 $2,000,000 $2,000,000 $2,000,000
ENTERPRISE FUND TOTAL $1,500,000 $1,700,000 $2,000,000 $2,000,000 $2,000,000
TOTAL $1,500,000 $1,700,000 $2,000,000 $2,000,000 $2,000,000
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS - WATER
FISCAL YEAR 2023-2024
168
18912 WATER PLANT TELEMETRY
PROJECT DESCRIPTION
This project provides for the maintenance of the Supervisory Control and Data Acquisition (SCADA) system. This
computer-driven telemetry system allows for remote monitoring and automatic control of all water sources of
supply, pumping, storage, and flow control facilities.
PROJECT DETAILS
Project Type: Ongoing
Funding Source(s): Water
FINANCIAL SUMMARY
18912
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Enterprise Fund
(600) Water $50,000 $50,000 $50,000 $50,000 $50,000
ENTERPRISE FUND TOTAL $50,000 $50,000 $50,000 $50,000 $50,000
TOTAL $50,000 $50,000 $50,000 $50,000 $50,000
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS - WATER
FISCAL YEAR 2023-2024
169
18925 EMERGENCY GENERATOR
PROJECT DESCRIPTION
This project provides for the acquisition of one fixed 480-volt three-phase emergency generator to be used to
supply emergency electricity to water pumping facilities during power outages. Locations of the remaining
generators are scheduled for Reservoir 4 in FY 24 and Reservoir 8 in FY 26.
PROJECT DETAILS
Project Type: One-Time
Completion Date: June 2028
Funding Source(s): Water
FINANCIAL SUMMARY
18925
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Enterprise Fund
(600) Water $250,000 $0 $0 $250,000 $0
ENTERPRISE FUND TOTAL $250,000 $0 $0 $250,000 $0
TOTAL $250,000 $0 $0 $250,000 $0
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS - WATER
FISCAL YEAR 2023-2024
170
20312 WELL 29 CONSTRUCTION
PROJECT DESCRIPTION
Well 29 is a proposed new 3,000 gallons-per-minute groundwater production facility to replace Well 8 located at
Katella Avenue and Struck Avenue. This project includes design, well drilling, pump installation, electrical, storm
drain, piping connection, treatment, and an emergency power generator. The Orange County Water District is
funding a treatment program to assist with construction costs.
PROJECT DETAILS
Project Type: One-Time
Estimated Completion Date: November 2026
Funding Source(s): Water; Reimbursable Capital
Projects
FINANCIAL SUMMARY
20312
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Enterprise Fund
(600) Water $1,200,000 $3,500,000 $2,700,000 $0 $0
ENTERPRISE FUND TOTAL $1,200,000 $3,500,000 $2,700,000 $0 $0
Capital projects funds
(550) Reimbursable Capital Projects $2,000,000 $0 $0 $0 $0
CAPITAL PROJECTS FUNDS TOTAL $2,000,000 $0 $0 $0 $0
TOTAL $3,200,000 $3,500,000 $2,700,000 $0 $0
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS - WATER
FISCAL YEAR 2023-2024
171
20429 SOUTH WATER YARD STORAGE
REPLACEMENT
PROJECT DESCRIPTION
This project provides for the design and construction of the warehouse replacement. The existing 5,000 square
feet warehouse will be renovated and used in conjunction with the proposed Fire Department Headquarter. The
replacement warehouse will be constructed at the water division's south yard for parts and equipment storage.
This project also provides for the cover structure over the water division's materials storage area in compliance
with the National Pollutants Discharge Elimination System (NPDES) requirements. The structure prevents run-off
from washing out construction material such as sands, asphalt, base, and soil into the storm drain system. It also
helps reduce noise and assists with dust control. This project will also pursue sustainable energy and efficiency
measures such as integrated solar panels.
PROJECT DETAILS
Project Type: One-Time
Estimated Completion Date: June 2024
Funding Source(s): Water
FINANCIAL SUMMARY
20429
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Enterprise Fund
(600) Water $200,000 $0 $0 $0 $0
ENTERPRISE FUND TOTAL $200,000 $0 $0 $0 $0
TOTAL $200,000 $0 $0 $0 $0
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS - WATER
FISCAL YEAR 2023-2024
172
20496 RESERVOIR 4A CONSTRUCTION
PROJECT DESCRIPTION
This project provides for the design and construction of a three million gallon steel water tank at a site near the
intersection of Cannon Street and Creekside Avenue. This tank will provide additional storage for existing
residential needs and fire protection for Zone 1 in southeast Orange.
PROJECT DETAILS
Project Type: One-Time
Estimated Completion Date: June 2031
Funding Source(s): Water
FINANCIAL SUMMARY
20496
2023 - 24 Budget 2024 - 25 Budget 2025 - 26 Budget 2026 - 27 Budget 2027 - 28 Budget
Enterprise Fund
(600) Water $0 $0 $0 $0 $200,000
ENTERPRISE FUND TOTAL $0 $0 $0 $0 $200,000
TOTAL $0 $0 $0 $0 $200,000
CAPITAL IMPROVEMENT PROGRAM
PUBLIC WORKS - WATER
FISCAL YEAR 2023-2024
173