06-02-2021 DRC MinutesAPPROVED BY THE DESIGN REVIEW COMMITTEE JULY 8, 2021
MINUTES . FINAL
City of Orange
Design Review Committee
June 02,2021
,1. OPENING
The Design Review Committee of the City of Orange, California convened on June 2,
2021 at 5:30 p.m. in a Regular l\r,leeting in the Council Chamber, 300 E. Chapman
Avenue, Orange, California and various teleconference locations.
1.1 CALL TO ORDER
Chair Fox called the meeting to order at 5:31 p.m.
1.2 PLEDGE OF ALLEGIANCE,
Chair Fox led the flag salute.
1.3 ROLL CALL
Present: Fox, lmboden, McDermott, McCormack, and Skorpanich
Absent: None
1.4 PUBLIC COMMENTS
None.
CONSENT CALENDAR
All matters listed under the Consent Calendar are considered to be routine by the
Design Review Committee and will be enacted by one motion. There will be no
separate discussion of said items unless members of the Design Review Committee,
staff or the public request specific items removed from the Consent Calendar for
separate action.
2
Page 1 of 3
Design Review Committee Minutes - Final June 2,2021
2.1.Approval of meeting minutes of the Design Review Commiftee of the City of
Orange for the May 19,2021 Regular Meeting.
ACTION: A motion was made by Committee Member Skorpanich, seconded by
Committee l\rember lmboden to approve the May 19, 2021 meeting minutes based on
the following Condition:
1. Staff shall refer to the meeting recording to clarify the motion language used for
Condition #1 ol ilem 2.2.
The motion carried by the following vote:
Aves: Fox, lmboden, McDermott, McCormack, and Skorpanich
Noes: None
Absent: None
3. CONTINUED ITEMS
3.1.Administrative Design Review No.
Avenue (Continued from the March
Meeting)
0151-20, Reigel
3, 2021 Regular
Residence, 1025E. Palm
Design Review Committee
A proposal to construct a '1,877 square foot, two-story addition to an existing
single-family residence and construct a new 1,428 square foot, two-story
detached garage. The project has been referred to the Design Review Committee
by the Community Development Director for final determination pursuant to
Orange Municipal Code (OMC) Section 17.10.070.E.4.
The Committee discussed the following:. Landscape. Lighting. Roof materials and pitch. Planter width. Screening. Belt bands on building and garage. Window glazing. Floor area-ratio and mass
A motion was made by Committee Member Skorpanich, seconded by Committee
Member McCormack, to approve Design Review No. 0151-20, Reigel Residence,
sub.lect to the Findings and Conditions in the staff report with the additional Conditions:
1. The roof on the one-story portion of the garage shall be asphalt shingles or metal
roofing to match the front porch
2. The glass will be center mounted in the window frame
3. The laundry room window shall have obscured glass
4- The trees along the west property line shall be Leylandi Cypress to match Cypress
trees on the adjacent property and will match the spacing ofthe neighboring trees
5. There shall be a belt band to cover the seams of the vertical siding and house
below the attic vent and at the next seam below that, as shown in the drawing
6. A similar belt band will be used to cover the butted up lengths of the vertical siding
at the height of the shed roof on the garage
Page 2 of 3
Design Review Committge Minutes " Final June 2,2021
The motion carried by the following vote:
Ayes: Fox, lmboden, McDermott, Mccormack, and Skorpanich
Noes: None
Absent: None
4. ADJOURNMENT
There being no further business, the meetlng ad.iourned at 6:20 p.m
The next Regular meeting is scheduled for Wednesday, June 16, 2021 at 5:30 p.m. in
the Council Chambers and various teleconference locations.
ANNA PEHOUSHEK
ASSISTANT COMMUNITY
DEVELOPMENT DIRECTOR
DRC STAFF LIAISON
Page 3 of 3
)