11.01 Trails at Santiago Creek 4 - Attachment 3 t
ac ment
RESOLUTION NO. PC 07-19
A RESOLUTION OF THE PLANNING COMMISSION
RECOMMENDING THAT THE CITY COUNCIL OF THE
CITY OF ORANGE (A) CERTIFY THE ADEQUACY OF
FINAL ENVIRONMENTAL IMPACT REPORT 1857-18
(SCH NO. 2017031020) (B) ADOPT FINDINGS OF FACT, (C)
ADOPT A STATEMENT OF OVERRIDING
CONSIDERATIONS, (D) ADOPT A MITIGATION
MONITORING AND REPORTING PROGRAM, AND (E)
. IMPOSE OTHER PROJECT RELATED CONDITIONS FOR
RELATED PROJECT ENTITLEMENTS FOR THE
CONSTRUCTION OF 128 NEW DETACHED SINGLE-
FAMILY RESIDENCES AND APPROXIMATELY 68.5
ACRES OF OPEN SPACE ON A SITE COMMONLY
REFERRED TO AS SULLY MILLER LOCATED AT 6145
EAST SANTIAGO CANYON ROAD, PREVIOUSLY
IDENTIFIED AS 6118 EAST SANTIAGO CANYON ROAD.
Moved by Commissioner Simpson and seconded by Commissioner Willits that the
following resolution be adopted:
WHEREAS, the Planning Commission has authority per City of Orange Environmental
Review Guidelines to recommend that the City Council certify Environmental Impact Report
1857-18 (SCH No. 2017031020); and
WHEREAS,the applicant has submitted a project in accordance with requirements of the
Municipal Code of the City of Orange and is known as the Trails at Santiago Creek Project which
consists of Final Environmental Impact Report 1857-18, General Plan Amendment No. 2018-
0001, Zone Change No. 1286-18, Development Agreement No. 0005-18, and adoption of the
Trails at Santiago Creek Specific Plan, all of which are collectively referred to herein as the
"Project"; and
WHEREAS, The Project, which by necessity includes Environmental Impact Report
1857-18 (SCH No.20 1 703 1 020),was filed in accordance with the provisions of the City of Orange
Municipal Code; and
WHEREAS, the environmental impacts of the project have been analyzed through
Recirculated Draft Environmental Impact Report No. 1857-18, changes and revisions (Errata) to
Recirculated Draft Environmental Impact Report 1857-18, the Response to Comments, technical
appendices, and the Mitigation Monitoring Program, pursuant to the provisions of the California
Environmental Quality Act (CEQA), local CEQA Guidelines, and the State CEQA Guidelines, a
copy of which is on file with the Communiiy Development Department of the City of Orange; and
082654\10786529v1 1
WHEREAS,Recirculated Draft Environmental Impact Report No. 1857-18 was circulated
for public review and comment within a State mandated 45-day public review period as required
by CEQA, with a recirculated comment period that occurred between November 14, 2018 and
ended on December 31, 2018; and
WHEREAS, responses to the comments received on Recirculated Draft Environmental
Impact Report No. 1857-18 have been prepared to the satisfaction of the City; and
WHEREAS,the Planning Commission conducted a duly advertised public hearing on July
15, 2019, and adopted Planning Commission Resolution No. PC 07-19 which contains a
recommendation that the City Council certify Final Environmental Impact Report No. 1857-18;
and
WHEREAS, the Planning Commission has reviewed Final Environmental Impact Report
No. 1857-18; and
WHEREAS, at said public hearing, upon hearing and considering all testimony and
arguments, if any, of all persons desiring to be heard, the Planning Commission considered all
factors relating to the proposed Project, including potential environmental impacts addressed in
Final Environmental Impact Report No. 1857-18.
NOW, THEREFORE, BE IT RESOLVED that the Planning Commission finds and
declares as follows:
1. Final Environmental Impact Report No. 1857-18 for the Project has been completed in
compliance with the California Environmental Quality Act, local CEQA Guidelines, and
State CEQA Guidelines; and
2. Final Environmental Impact Report No. 1857-18 reflects the independent judgment and
analysis of the City of Orange; and
3. Based on the information contained in Final Environmental Impact Report No. 1857-18,
the Planning Commission recommends that the City Council finds that the environmental
impact report provides an adequate assessment of the potentially significant environmental
impacts of the proposed project and required discretionary permits; and
4. The Planning Commission recommends that the City Council adopt of the Findings of Fact
(Attachment A), the Statement of Overriding Considerations (Attachment B), and Other
Conditions (Attachment C) attached hereto and incorporated by this reference, which
documents and supports the conclusion that even with the implementation of all feasible
mitigation measures recommended in Final Environmental Impact Report No. 1857-18, it
is infeasible to reduce the project's impacts on air quality and transportation to a level of
insignificance, and which further sets forth the overriding benefits of the proj ect which
outweigh the unavoidable environmental impact of the project. Therefore,the City Council
finds that the project's benefits outweigh the adverse impacts; and
5. The Planning Commission recommends that the City Council adopt the Mitigation
Monitoring and Reporting Program (included in Final Environmental Impact Report No.
082654\10786529v1 2
1857-18 and incorporated by this reference) as the mitigation monitoring and reporting
program for the Project; and
6. The proposed development is below greenhouse gas (GHG) thresholds established by the
State; and
7. Based on the forgoing,the Planning Commission recommends that the City Council certify
Final Environmental Impact Report No. 1857-18, and approve the project.
I hereby certify that the foregoing resolution was adopted on July l, 2019, by the Planning
Commission of the City of Orange by the following vote:
AYES: Commissioners Glasgow, Martinez, Simpson, and Vazquez
NOES: Commissioner Willits
ABSTAIN: NONE
ABSENT: NO _
�
�'
� .
Ern s lasgow, a ' g C mission Chair
9- 1 `�-- z�� �
Date
082654\10786529v1 3
ATTACHMENT A
TO THE CITY COUNCIL
RESOLUTION OF APPROVAL
ADOPTING FINDINGS PURSUANT TO
THE CALIFORNIA ENiTIRONMENTAL
QUALITY ACT
FINDINGS PURSUAl�T TO
CEQA SECTION 21081
Trails at Santiago Creek
Project
082654\10786529v1 1
This page intentionally left blank.
0826�4\10786529v1 1
City of Orange Trails at Santiago Creek Project
TABLE OF CONTENTS
I. STATUTE AND GUIDELINES ...............................................................................................1
II. RECORD OF PROCEEDINGS.................................................................................................2
III. PROJECT DESCRIPTION........................................................................................................4
IV.ADOPTION OF FINDINGS .....................................................................................................5
V. DISCRETIONARY APPROVALS...........................................................................................5
VI.FINDINGS REGARDING IMPACTS......................................................................................5
A. ENVIRONMENTAL IMPACTS DETERMINED TO HAVE NO IMPACT OR A
LESS THAN SIGNIFICANT IMPACT..............................................................................6
1. Aesthetics.......................................................................................................................6
2. Agricultural and Forest Resources.................................................................................6
3. Air Quality.....................................................................................................................7
4. Biological Resources .....................................................................................................8
5. Geology and Soils..........................................................................................................8
6. Greenhouse Gas Emissions............................................................................................9
7. Hazards and Hazardous Materials Impact Thresholds: ...............................................10
8. Hydrology and Water Quality......................................................................................10
9. Land Use......................................................................................................................11
10. Mineral Resources .......................................................................................................16
11. Noise............................................................................................................................16
12. Population and Housing...............................................................................................17
13. Public Services.............................................................................................................18
14. Recreation....................................................................................................................18
15. Transportation and Traffic...........................................................................................19
16. Tribal Cultural Resources............................................................................................20
17. Utilities.........................................................................................................................21
082654\]0736529v1 i
City of Orange Trails at Santiago Creek Project
B. POTENTIALLY SIGNIFICANT ENVIRONMENTAL IMPACTS REDUCED
TO LESS THAN SIGNIFICANT THROUGH IMPLEMENTATION OF
PROJECT DESIGN FEATURES......................................................................................22
1. Biological Resources ...................................................................................................22
C. POTENTIAL ENVIRONMENTAL IMPACTS DETERMINED TO BE
MITIGATED TO BELOW A LEVEL OF SIGNIFICANCE...........................................24
1. Aesthetics.....................................................................................................................24
2. Air Quality...................................................................................................................25
3. Biological Resources ...................................................................................................26
4. Cultural Resources.......................................................................................................33
5. Geology and Soils........................................................................................................36
6. Hazards and Hazardous Materials: ..............................................................................3 8
7. Hydrology and Water Quality......................................................................................43
8. Noise ............................................................................................................................48
9. Public Services.............................................................................................................51
10. Transportation and Traffic...........................................................................................52
D. ENVIRONMENTAL IMPACTS DETERMINED TO BE SIGNIFICANT AND
UNAVOIDABLE AFTER MITIGATION........................................................................53
- 1. Air Quality...................................................................................................................53
2. Transportation and Traffic...........................................................................................61
VII. FINDINGS REGARDING IRREVERSIBLE AND IRRETRIEVABLE COMMITMENT
OFRESOURCES ....................................................................................................................65
VIII. FINDINGS REGARDING GROWTH INDUCING IMPACTS.......................................66
IX.FINDINGS REGARDING CUMLTLATIVE IMPACTS.........................................................67
X. FINDINGS REGARDING ALTERNATIVES TO THE PROPOSED PROJECT.................81
A. ALTERNATIVES..............................................................................................................81
1. Development within the Existing Land Use Designations..........................................81
082654\I 0786529v 1 11
City of Orange Trails at Santiago Creek Project
2. No Project Alternative/Existing Land Use Activities Alternative...............................83
3. Collaborative Group Alternative..................................................................................85
4. 122-Unit Alternative....................................................................................................87
082654110786529v1 111
City of Orange Trails at Santiago Creek Project
This page intentionally left blank.
082654\10786529v1 1
City of Orange Trails at Santiago Creek Project
FINDINGS AND FACTS IN SUPPORT OF FINDINGS FOR THE
TRAILS AT SANTIAGO CREEK PROJECT
CITY OF ORANGE, CA
STATE CLEARINGHOUSE NO. 2017031020
I. STATUTE AND GUIDELINES
The California Environmental Quality Act(CEQA),Public Resources Code Section 21081
and Section 15091 of Title 14 of the California Code of Regulations (CEQA Guidelines),
provide that:
(a) No public agency shall approve or carry out a project for which an EIR has been
certified which identifies one or more significant environmental effects of the
proj ect unless the public agency makes one or more written findings for each of
those significant effects, accompanied by a brief explanation of the rationale for
each finding. The possible findings are:
(1) Changes or alterations have been required in, or incorporated into, the
project which avoid or substantially lessen the significant environmental
effect as identified in the Final EIR. (Finding 1)
(2) Such changes or alterations are within the responsibility and jurisdiction of
another public agency and not the agency making the finding. Such changes
have been adopted by such other agency or can and should be adopted by
such other agency. (Finding 2)
(3) Specific economic, legal, social, technological, or other considerations,
including provision of employment opportunities for highly trained
workers, make infeasible the mitigation measures or project alternatives
identified in the Final EIR. (Finding 3)
(b) The findings required by subsection (a) shall be supported by substantial evidence
in the record.
Section 15092 of the State CEQA Guidelines further stipulates that:
(c) A public agency shall not decide to approve or carry out a project for which an EIR
was prepared unless either:
(1) The proj ect as approved will not have a significant effect on the
environment, or
(2) The agency has:
(A) Eliminated or substantially lessened all significant effects on the
environment where feasible as shown in findings under Section
15091, and
082654\10786529v] 1
City of Orange Trails at Santiago Creek Project
(B) Determined that any remaining significant effects on the
environment found to be unavoidable under Section 15091 are
acceptable due to overriding concerns as described in Section
15093.
The City of Orange, as lead agency, prepared a Final Environmental Impact Report(EIR)
for the Trails at Santiago Creek Project, State Clearingl�ouse No. 2017031020. The Project
proposes the development of 128 single family residences and 68.5 acres of open space on
an approximately 109.2 acre site, and is described in greater detail in Section III, Project
Description,below.
The EIR for the Project has been prepared and certified as complete by the City of Orange.
The EIR identifies certain significant effects that may occur as a result of the Trails at
Santiago Creek Project alone or on a cumulative basis in conjunction with other past,
present, and reasonably foreseeable future projects. These Findings are made pursuant to
CEQA Section 21081 and CEQA Guidelines Section 15091.
II. RECORD OF PROCEEDINGS
The environmental review process for the Project is summarized below.
1. In accordance with CEQA,a Notice of Preparation(NOP)of a Draft EIR was issued
on March 3, 2017 and received by the State Clearinghouse on March 7, 2017. The
State Clearinghouse assigned State Clearinghouse Number 2017031020.
2. The NOP was distributed to the State Clearinghouse, responsible agencies, and
other interested parties for a 30-day public review in accordance with CEQA
Guidelines Section 15082. The review period began on March 3, 2017 and ended
on Apri13, 2017.
3. The City of Orange distributed the NOP to all properiy owners within 300 feet of
the Project site, which notified nearby property owners that would be most directly
affected by implementation of the proposed Project,along with public agencies and
interested organizations,that the City was preparing a Draft EIR.
4. In accordance with CEQA Guidelines Section 15083, the City of Orange sought
early public consultation and held a scoping meeting to solicit comments from
interested parties on preparation of the Draft EIR. The scoping meeting was held
on March 16, 2017.
5. A Draft EIR was prepared on February 23, 2018.
6. In accordance with CEQA Guidelines Section 15085, a Notice of Completion
(NOC) of the Draft EIR was filed with the State Clearinghouse in February 2018.
7. In accordance with CEQA Guidelines Section 15087, a Notice of Availability
(NOA) was published by the City on . The Draft EIR was distributed to
agencies, interested organizations, and individuals by the City of Orange. The
082G54\10786529v1 2
City of Orange Trails at Santiago Creek Project
distribution list is available at the City of Orange Community Development
Department Planning Counter. As required by CEQA Guidelines Section 15087,
the NOA was mailed to the last known name and address of all organizations and
individuals who previously requested such notice in writing; and notice was also
given by the following procedure: newspaper publishing and mail.
8. A forty-five (45) day public review period for the Draft EIR was established
pursuant to State law,which commenced on February 23,2018 and ended on April
9, 2018.
9. A Recirculated Draft EIR was prepared on November 14, 2018.
10. In accordance with CEQA Guidelines Section 15085, a Notice of Completion
(NOC) of the Recirculated Draft EIR was filed with the State Clearinghouse on
November 9, 2018.
1l. In accordance with CEQA Guidelines Section 15087, a Notice of Availability
(NOA) was published by the City on November 14, 2018. The Recirculated Draft
EIR was distributed to agencies, interested organizations, and individuals by the
City of Orange. The distribution list is available at the City of Orange Community
Development Department Planning Counter. As required by CEQA Guidelines
Section 15087, the NOA was mailed to the last known name and address of all
organizations and individuals who previously requested such notice in writing; and
notice was also given by the following procedure: newspaper publishing and mail.
12. A forty-five (45) day public review period for the Recirculated Draft EIR was
established pursuant to State law, which commenced on November 14, 2018 and
ended on December 31, 2018.
13. Comments received during the public review period for the Recirculated Draft EIR
were responded to in a Response to Comments document and distributed to each
public agency commenter at least 10 days prior to certification of the EIR by the
Orange City Council pursuant.to CEQA Guidelines Section 15088(b); and were
provided to each organization and individual submitting written comments on the
Recirculated Draft EIR. Pursuant to CEQA Guidelines Section 15088.5(fl(1), a
stuninary of revisions made to the DEIR is included in the FEIR; also, pursuant to
that Guideline, responses to comments are limited to comrilents received on the
RDEIR, although comments on the DEIR will be part of the administrative record.
14. A Final EIR has been prepared for the Trails at Santiago Creek Project.
The following components comprise the Final EIR:
a) Draft EIR, February 23, 2018;
b) Comments received on the Draft EIR, Apri19, 2018;
c) Recirculated Draft EIR, June 2015;
d) - Comments received on the Recirculated Draft EIR and responses to those
comments, June 2019; and
082654U 0786529v1 3
City of Orange Trails at Santiago Creek Project
e) All attachments,incorporations,and references to the documents delineated
in items "a."through"d." above.
15. The documents and other materials which constitute the administrative record for
the City's actions related to the Project are located at the City of Orange, 300 East
Chapman Avenue, Orange, California 92866. The City Community Development
Department is the custodian of the administrative record for the Project.
The City of Orange is the Lead Agency with respect to the Project pursuant to State CEQA
Guidelines Section 15367. As a Lead Agency, the City is required by CEQA to make
findings with respect to each significant effect of the Project.
The City of Orange has reviewed the EIR. The following sections make detailed findings
with respect to the potential significant environmental effects of the Trails at Santiago
Creek Project and refer,where appropriate,to the mitigation measures set forth in the Final
EIR.
The Final EIR and the administrative record concerning the Trails at Santiago Creek
Project provide additional facts in support of the findings herein. The Final EIR (which
includes, among other components, the Draft EIR, Recirculated Draft EIR, and the
Response to Comments on the Recirculated Draft EIR) is hereby incorporated into these
Findings in its entirety. Furthermore, the mitigation measures set forth in the Mitigation
Monitoring and Reporting Program (MMRP) are incorporated by reference in these
Findings.The Mitigation Monitoring and Reporting Program was developed in compliance
with Public Resources Code Section 21081.6 and is contained in a separate document.
Without limitation,these Findings of Fact are intended to elaborate on the scope and nature
of mitigation measures, the basis for determining the significance of impacts, the
comparative analysis of alternatives, and the reasons for approving the Trails at Santiago
Creek Project in spite of associated significant unavoidable adverse impacts.
III. PROJECT DESCRIPTION
The site is approximately 109.2 acres and is located north of the intersection of Santiago
Canyon Road and Nicky Way in the City of Orange. The site contains disturbed land that
supports a grandfathered sand and gravel operation, as well as undeveloped land. The
project site is comprised of 12 parcels and is bisected by Santiago Creek in an east-west
direction. The site contains gently sloping terrain, with an overall change in elevation from
456 feet above mean sea level in the northeast corner to 344 feet above mean sea level in
the southwest corner. An approximately 10-acre, semi-oval-shaped raised pad is located in
the eastern portion of the site. The pad sits roughly 15 feet higher than the former mining
area to the west.
Approximately 40 acres between Santiago Creek and East Santiago Canyon Road contains
remnants of the mining operation and is the location of the ongoing sand and gravel
operation. This area is characterized by soil piles, berms, and unpaved roads. Adjacent to
East Santiago Canyon Road is an approximately 5-acre area that supports a materials
recycling operation that included apparatus for the crushing of boulders,bricks, rocks, and
�
0826�4\10786529v1 [�.
City of Orange Trails at Santiago Creek Project
similar materials for recycling. Materials used for these operations originated primarily
from off-site sources, and the materials generated by these operations have historically
been used both on-site and transported off-site. Ancillary uses included administration and
maintenance buildings, caretaker residence, material testing laboratory, driver's shack,
rock crushing facilities, several aboveground and belowground fuel storage tanks, and two
hot-mix asphalt plants.
Milan REI X LLC (Applicant)proposes 128 single-family residences on 40.7 acres on the
southern portion of the site and open space on 68.5 acres of the site. The single-family
homes would be detached and would range in size from 8,000 squaxe feet to greater than
10,000 square feet.
The majority of the project site (62.7 percent) is intended for the enhancement and
preservation of the natural greenway/open space and Santiago Creek environs, as well as
re-establishing open grasslands in areas that have been denuded by the project site's history
of commercial operations, totaling approximately 68.5 acres. Recreational trails will
provide public access to the enhanced revegetated interior of the site.
IV. ADOPTION OF FINDINGS
V. DISCRETIONARY APPROVALS
Final EIR SCH No. 2017031020 for the Trails at Santiago Creek Project identified (1)
impacts that will have no impact or a less than significant impact on the environment; (2)
potentially significant impacts that will be reduced to less than significant through
implementation of project design features; (3) impacts that are potentially significant prior
to mitigation that will be mitigated to a less than significant level; and (4) significant
environmental impacts after implementation of mitigation that will occur as a result of
implementing the Project. Thus, in accordance with the provisions of CEQA, the Orange
City Council hereby adopts these findings as part of its action to certify Final EIR SCH
No. 2017031020 and approve the Trails at Santiago Creek Project.
The Project addressed in the Final EIR is defined to include the"whole of an action,which
has a potential for resulting in either a direct physical change in the environment, or a
reasonably foreseeable indirect physical change in the environment," and includes
discretionary approvals by governmental agencies required to implement the Trails at
Santiago Creek Project. The following are the discretionary approvals that will be
considered by the City:
1. General Plan Amendment No. 2018-0001;
2. Zone Change 1286-18;
3. Development Agreement No. 0005-18;
4. Environmental Impact Report 1857-18;
5. Trails at Santiago Creek Specific Plan.
VI. FINDINGS REGARDING IMPACTS
082654\10786529v1 5
{
City of Orange Trails at Santiago Creek Project
A. ENVIRONMENTAL IMPACTS DETERMINED TO HAVE NO IMPACT
OR A LESS THAN SIGNIFICANT IMPACT
1. Aesthetics
Impact Thresholds: �
Threshold AES-1: Would the p�oject have a substantial adve�se effect on scenic vista?
Th�eshold AES-2: Would the project substantially degrade the existing visual
character or quality of the site and its sur�oundings?
Findin : The discussion and analysis provided in the EIR concluded that the Project would
have a Less Than Significant Impact on both short-term and long-term aesthetic impacts
described under Threshold AES-1 and Threshold AES-2 that were addressed in the EIR,
and that no Project Design Features, Standard Conditions of approval, or mitigation
measures were required or recommended.
Facts in Su�port of the Findin�: No potential impacts would result from short-term
construction activities or long-term operational activities. The only portion of the site that
could be considered a scenic vista would be the Santiago Creek Trail along the north bank
of Santiago Creek. A greenway would be established along the creek corridor and the
undeveloped land along the north bank of the creek would be permanently protected as
open space. Thus, scenic views from the Santiago Creek Trail would not be affected by
the Project.
While development of the residences onsite would change the character of approximately
40.7 acres of the project site to residential uses, and the remaining acreage to open space
and recreation, these uses would be compatible with surrounding uses and City policies.
The project's impacts would be less than significant.
As noted in Section 7 of the EIR,Effects Found Not To Be Significant,the nearest officially
designated State Scenic Highway to the site is approximately 5 miles to the north and no
impacts would occur regarding scenic resources within view of a State Scenic Highway.
2. Agricultural and Forest Resources
Impact Thresholds:
Threshold AFR-1: Would the project convert Important Farmland to non-agricultural use?
Threshold AFR-2: Would the project conflict with an existing agricultural zoning,
ag�icultural use or with land subject to a Williamson Act contract?
Threshold AFR-3: Would the project conflict with existing zoning for, o� cause rezoning
of,forest land(as defined in Public Resources Code section 12220(g)),
timberland (as defined by Public ResouYces Code section 4526), or
082654110786529v1 (
City of Orange Trails at Santiago Creek Project
timberland zoned Timberland Production (as defined by Govt. Code
section 51104(g))?
Threshold AFR-4: Would the project result in the loss of forest land o�conversion of fo�est
land to non forest use?
Threshold AFR-S: Would the project involve otheN changes in the existing environment
which, due to their location or nature, could result in conversion of
agYicultu�al land to non-agricultural use o�forest land to non forest
use?
Findin�: The discussion and analysis provided in the Final EIR conducted for the proposed
Project indicated that impacts to agricultural or forest resources would be less than
significant. No comments were received in response to the NOP or the Recirculated Draft
EIR that would modify this finding. �
Facts in Support of Findin�: The project site is mapped as containing "Other Land"by the
California Department of Conservation Farmland Mapping and Monitoring Program,
which is a non-agricultural land use designation. The project site does not support
agricultural land use activities and is not eligible for a Williamson Act contract. The zoning
for the site is a non-agricultural zoning district. The project would rezone the property to
Specific Plan, which would not accommodate agriculture. The project site is not currently
zoned for forest land, timberland, or timberland production.
There are 323 trees on the project site;however,the trees do not meet the Public Resources
Code criteria for "timberland" or "forest land." Tree removal would not result in
conversion of timberland to non-timber use or forest land to non-forest use. Neither the
project site nor surrounding land uses support agricultural land or timberland. Impacts
would be less than significant.
3. Air Quality
Impact Thresholc�s:
Threshold AIR-S: Would the project create objectionable odors affecting a substantial
number ofpeople?
Findin�: The discussion and analysis provided in the EIR concluded that the Proj ect would
have a Less Than Significant Impact on odors as described in Thresholds AIR-5 that were
addressed in the EIR, and that no Project Design Features, Standard Conditions of
approval, or mitigation measures were required or recommended. .
Facts in Support of the Finding: During construction,various diesel-powered vehicles and
equipment onsite would create localized odors. These odors would be temporary and
would unlikely be noticeable beyond the site's boundaries. Impacts during construction
would be less than significant. During project operation, odors would primarily consist of
vehicles traveling to the urban linear park and equipment for landscaping and maintenance.
082654\10786529v1 ']
City of Orange Trails at Santiago Creek Project
These occurrences would not produce a significant amount of odors; therefore, impacts
would be less than significant.
4. Biological Resources
Impact Threslzolds:
Threshold BIO-5 Would the project inteYfere with fish or wildlife movement?
Threshold BIO-6 Wozcld the project conflict with local biological ordinances or
policies?
Threshold BIO-7.• Would the project conflict with any applicable habitat conservation
plan or natural communities conservation plan?
Findin : The discussion and analysis provided in the EIR concluded that the Project would
have a Less Than Significant Impact on biological resource impacts described under
Thresholds BIO-5, BIO-6, and BIO-7 that were addressed in the EIR, and that no Standard
Conditions of approval or mitigation measures were required or recommended. Design
features that are part of the project are listed below.
Facts in Support of the Findin�: Santiago Creek does not support fish passage because of
downstream obstructions including the presence of Santiago Creek Recharge Basin. The
project is not anticipated to contribute to avian mortality due to bird strikes resulting from
structures because there is already residential development surrounding the creek in all
directions and the project does not include high-rise urban buildings.
The project site contains 204 trees. Of those trees, nine are within the fuel modification
beyond the limits of grading and subject to thinning but will be left in place. Two trees are
within the storm drain outlet footprint and one is within the temporary construction buffer.
The City's Tree Preservation Ordinance requires the Applicant to identify the location of
trees and for City staff to impose conditions. Removed trees would be conditioned on
replacement at a minimum of 1:1 ratio. Impacts would be less than significant.
The site is within the boundaries of the Orange County Central and Coastal Subregion
NCCP/HCP. The Santiago Creek corridor and upland areas north of the creek contain
riparian habitat; however, these areas are proposed to be preserved. The surface mining
areas onsite do not contain significant biological habitat and would not cause conflicts with
the NCCP/HCP. Impacts would be less than significant.
5. Geology and Soils
dmpact Thresholds:
ThYeshold GEO-3: Would the proposed project be located on a geologic unit oY soil
that is unstable, or that would become unstable as a result of the
proposed project, and potentially result in on- or off-site landslide,
lateral sp�eading, subsidence, liquefaction, or collapse?
0826�4\10786�29v1 $
City of Orange Trails at Santiago Creek Project
Threshold GEO-4: Woz�ld the proposed project be located on expansive soil, as defined
in Table 18-1-B of the UnifoYm Building Code (199=�), creating
substantial risks to life or property?
Findin�: The discussion and analysis provided in the EIR concluded that the Project would
have a Less Than Significant Impact on short-term and long-term geology and soils impacts
described under Thresholds GEO-3 and GEO-4 that were addressed in the EIR, and that
no Project Design Features, Standard Conditions of approval,or mitigation measures were
required or recommended.
Facts in Support of the Finding: The project site is underlain by terraces and alluvial fans
near Santiago Creek,which are considered stable. The project would be required to comply
with mandatory building code standards to ensure that there is no risk of failure due to
unstable geologic units or soils. Impacts would be less than significant.
The project site is underlain by soils with low clay content. These soils do not retain water
such that there would be substantial shrink-swell potential. Building code compliance with
reduce any risks. Impacts would be less than significant.
As noted in Section 7 of the EIR, Effects Found Not To Be Significant, the project would
be served by sanitary sewer provided by Orange County Sanitation District; no septic or
alternative wastewater disposal system would be used and no impacts would occur.
6. Greenhouse Gas Emissions
Impact Thresholds
Threshold GHG-1 Would the project generate greenhouse gas emissions, either
directly or indirectly, that may have a signifrcant impact on the
environment?
Threshold GHG-2: Would the project conflict with an appliccrble plan, policy or
regulation adopted for the purpose of redztcing the emissions of
greenhouse gases?
Findin�: The discussion and analysis provided in the EIR concluded that the Project would
have a Less Than Significant Impact on short-term and long-term impacts under Threshold
GHG-1 and GHG-22, and that no Project Design Features, Standard Conditions of
approval, or mitigation measures were required or recommended.
Facts in Support of Finding: The project would generate a total of 469 MT CO2e during
construction (amortized over 30 years) and a total of 1,921 MT CO2e per year during
operation of the project, primarily due to energy and mobile source emissions. The
applicable SCAQMD threshold is 3,500 MT CO2e per year. The project's emissions
would not exceed the threshold. Impacts would be less than significant.
The Project would not conflict with an applicable plan, policy, or regulation adopted for
the purpose of reducing GHG emissions. The proposed Project would utilize equipment
082654\10786529v1 9
City of Orange Trails at Santiago Creek Project
compliant with state and federal emissions requirements, such as equipment with Tier 4
engines, and adhere to AB 32 Scoping Plan control measures adopted by the State of
California during construction and operation. The proposed Project would also be
consistent with the RTP/SCS because the Project is consistent with existing general plan
and zoning designations for the Project site and consistent with General Plan policies.
Consistency with SCAQMD GHG policies would also be met through consistency with
the City General Plan and through Project emission levels below the 3,500 MT CO2e/year
SCAQMD threshold. Therefore, a less than significant impact would occur and no
mitigation is required. The proposed Project would be consistent with the GHG reduction
goals of AB32 as described in the statewide GHG emissions reduction strategy outlined in
the Scoping Plan. In addition, GHG emissions would be reduced through the integration of
green building practices, the use of renewable energy, reducing per capita water use,
adoption of a new low carbon fuel standard and through increased fuel efficiency as
mandated in AB 32 and related programs adopted by the State of California.
7. Hazards and Hazardous Materials Impact Thresholds:
Impact Thresholds
Threshold HAZ-1: Would the project create a significant hazard to the public or the
environment through the routine transport, zise o� disposal of
hazardous rnaterials?
Threshold HAZ-3: Would the project emit hazardous emissions or handle hazardous or
acutely hazardous materials, substances, or waste within one-
quarter mile of an existing or proposed school?
Findin : The discussion and analysis provided in the EIR concluded that the Project would
have a Less Than Significant Impact under Thresholds HAZ-1 and HAZ-3, and that no
Project Design Features, Standard Conditions of approval, or mitigation measures were
required or recommended.
Facts in Support of Findin�: Removal and disposal of hazardous materials from the site
would be conducted by a licensed contractor in compliance with all applicable laws,
policies, and programs. During operation of the project, hazardous materials would be
limited to materials used for daily residential maintenance and operational activities.
Impacts would be less than significant.
The project site is located within 0.25 miles of Salem Lutheran Church and School. None
of the proposed uses would involve the routine use of hazardous materials near the school.
Moreover, the proposed use would not involve activities that routinely emit toxic air
contaminants. Impacts would be less than significant.
As noted in Section 7 of the EIR, Effects Found Not To Be Significant, no impacts to
airports or private airstrips would occur because the site is 10 miles from the nearest airport
and there are no private airstrips in the vicinity.
8. Hydrology and Water Quality
082654\10786529v1 1 Q
City of Orange Trails at Santiago Creek Project
Impact Tltresholds:-
Threshold HYD-2: Would the project contribute to groundwate� overdraft or inzpair
' groundwater recharge?
Threshold HYD-3: Would the project contribute runoff to downstream storm drainage
facilities that would�esult in the potential for flooding?
ThYeshold HYD-4: Would the project place housing or structu�es within a 100 year
flood hazard area?
Fi•ndin�: The discussion and analysis provided in the EIR concluded that the Proj ect would
have a Less Than Significant Impact under Thresholds HYD-2 through HYD-4 that no
Project Design Features, Standard Conditions of approval, or mitigation measures were
required or recommended.
Facts in Support of Finding: The Project's water demand would represent a very small
percent of total groundwater supply and due to OCWD's groundwater management efforts,
impacts on groundwater resources would be less than significant. No infiltration for
groundwater recharge will be promoted onsite and incidental infiltration will occur on
landscaped areas. The project will not interfere with groundwater recharge efforts.
The project's storm drainage system would slow, reduce, and meter the volume of runoff
leaving the site. Downstream facilities would not be inundated with project-related
stormwater. The project would not affect two unnamed storm drains in the northwestern
portion of the site. Impacts would be less than significant.
The majority of the residential uses will be outside the 100-year flood hazard areas. The
onsite areas mapped within 500-year flood hazard areas are mostly open space areas;
however, 15 acres of the residential area is within the 500-year flood hazard area. Only
"critical facilities" are required to be above the 500-year flood elevation; residential uses
are permitted in the 500-year flood elevation. Impacts would be less than significant and
no mitigation is required.
As noted in Section 7 of the EIR, Effects Found Not To Be Significant, there are no large
inland bodies of water near the site and the site is not susceptible to seiche inundation or
tsunami inundation. The site does not contain any steep slopes that may be susceptible to
mudflows. No impact regarding these potential hydrological hazards would occur.
9. Land Use
Impact Thresholds:
Threshold LUP-1: Would the project conflict with any of the applicable provisions of
the City of Orange General Plan?
Threshold L UP-2: Would the project conflict with any applicable provisions of the
Orange Municipal Code?
082654\10786529v 1 11
City of Orange Trails at Santiago Creek Project
The East Orange General Plan references design of the Santiago Creek Greenbelt in the
project site area. The project would be consistent with the reference to the Greenbelt
because it includes a 40.2-acre Greenway Open Space/Santiago Creek Riparian Corridor.
The East Orange General Plan emphasizes pedestrian and equestrian movements between
neighborhoods. The project would include a multitude of trails to connect the proposed
project and existing community to existing and future trails and bike lanes. The project
would also provide a sidewalk for pedestrians along the frontage of East Santiago Canyon
Road where one does not currently exist. Lastly,the East Orange General Plan envisions a
trail system to include equestrian/hiking trails and bike trails. As mentioned above, the
project would include a multitude of trails to connect the project and existing community
to existing and future trails and bicycle lanes for recreation and commuting purposes.
The OPA Plan encompasses approximately 1,794 acres, of which 39 acres are located on
the project site. The project is consistent with the OPA Plan objectives and policies. For
example, the OPA Plan contains an objective to provide a wholesome rural atmosphere
emphasizing a quiet seclusion close to nature. The project would retain a wholesome rural
atmosphere by separating the residential component of the project from adjacent residential
developments by open space, emphasizing a quiet seclusion and closeness to nature and
open space. The rural character of the site would also be maintained by inclusion of an
equestrian trail system.
An objective of the OPA Plan is to foster compatible residential development within the
area both visually and functionally. The project would comply because its residential area
has a similar density to nearby residential neighborhoods, including the following
neighborhoods located in the OPA Plan area: Broadmoor Homes, Leadership Housing
Specific Plan,Pacesetter Homes,and a small portion of the Jamestown neighborhood. The
OPA Plan envisions various areas to be linked through a system of trails and streetscape
landscaping. Additionally, the project includes a sidewalk for pedestrians along the
frontage on East Santiago Canyon Road where a sidewalk does not currently exist.
The OPA Plan promotes a "lifestyle" that allows for diversity of activities. The project
would include residential uses, a multitude of trails, bicycle lanes, sidewalks, and
equestrian trails. The project would serve a diversity of activities, from walking to
horseback riding. The OPA Plan seeks to preserve positive features of major drainage
courses and bodies of water to utilize them for recreational purposes. The project proposes
a 40.2 acre Greenway Open Space/Santiago Creek Riparian Corridor, and preserves the
Handy Creek drainage area as greenspace. Approximately 39 acres of the project site are
located within the boundaries of the OPA Plan and are designated as"Open Space." While
the project would amend the approximately 39 acres that are within the OPA Plan, the 39
acres are approximately 3 percent of the OPA Plan total area, and are on the fringe of the
OPA Plan area. Additionally,the project would include 68.5 acres of open park space,split
into 40.2 acres of Greenway Open Space/Santiago Creek Riparian Corridor and 28.3 acres
of Grasslands Open Space. Therefore, the project would include 68.5 acres of open
space/park uses adjacent to, and partially within, the OPA Plan, thus creating more open
space in the vicinity than the 39 acres of the project site that are within the OPA Plan area.
082654\10786529v1 1 4
City of Orange Trails at Santiago Creek Project
A policy of the OPA Plan is to provide for continuous trail linkages to connect trails to
major land use elements and natural features. Another OPA Plan policy is to preserve
Santiago Creek as a balanced ecological system and allow for light recreational use. The
project would include a multitude of trails that would connect the proposed residential uses
with existing and future trails and bicycle lanes. The project would promote light
recreational use. In addition, the project would involve a 40.2 acre greenway along
Santiago Creek and preservation of the Handy Creek drainage areas as greenspace. One of
the OPA Plan policies is to phase out gravel pit operations to restore natural amenities. The
project proposes residential and open space/recreational uses in place of the former mining
operations.
A prominent policy of the OPA Plan in its residential designations is the concept of
"clustering." The OPA Plan envisions "single-family attached and detached clusters
referred to as "rural clusters" within a greenbelt or open space context" for medium-low
density residential.areas. The proposed project area encompasses approximately 109.2
acres, 68.5 acres of which would be dedicated to open space,and approximately 40.7 acres
of which would contain a residential "cluster" of homes. The proposed site design would
align with the OPA Plan concept of "clustering" and retaining open space areas near
residential "clusters." Although the residential units are "clustered" on approximately 40
acres, each lot is being subdivided to meet the City's R-1-8 standards.
Lastly,one OPA Plan policy is to provide for landscaping, greenbelt,or open space buffers
between housing types. The project would encompass approximately 109.2 acres, 68.5
acres of which would be dedicated open space. The project's residential area would be
clustered as envisioned by the OPA Plan, and the density of the residential component
would be similar to the density of nearby residential neighborhoods, including Jamestown,
Mabury Ranch, Broadmoor Homes, Leadership Housing Specific Plan, and Pacesetter
Homes. The separation of the project's residential area from existing residential
development adjacent to the project site, achieved the by the proposed open space, would
provide a quiet seclusion and closeness to nature, as envisioned by the OPA Plan. The rural
aspect envisioned by the OPA Plan would be maintained, in part, by inclusion of an
equestrian trail system. A list of the OPA Plan's goals, objectives, and policies,which the
project is consistent with, is included in RDEIR Section 3.10, Land Use, as Table 3.10-4
(page 3.10-26 through page 3.10-28).
In fact, the Orange Park Acres Association previously supported a more intensive
development on the project site in a letter dated May 28,2003 and found it to be compatible
with the OPA Plan. Orange Park Acres Association specifically found the more intensely
developed project to be consistent with the clustering concept envisioned by the OPA Plan.
Orange Park Acres Association has consistently supported a clustered residential concept.
This earlier project included the development of a gated residential community with a
maximum of 189 single-family homes on lots rangirig from 8,000 to 22,000 square feet.
The residential development was spread across most of the project site, including both the
north and south sides of Santiago Creek encompassing approximately 83 acres. The
remaining portion of the site consisted of approximately 26 acres of open space
(approximately 31 percent of the site),which did not include a greenway aspect, unlike the
082654\10786529v 1 15
City of Orange Trails at Santiago Creek Project
Th�eshold LUP-3: Would the p�oject conflict with any applicable habitat conservation
plan or natural community conservation plan?
Findin : The discussion and analysis provided in the EIR concluded that the Project would
have a Less Than Significant Impact on the three land use impacts that were addressed in
the EIR, and that no Project Design Features, Standard Conditions of approval, or
mitigation measures were required or recommended.
Facts in Support of the Findin�: The project would involve a General Plan Amendment
and Zone Change. The proposed General Plan and zoning designations are consistent with
the surrounding neighborhood. The project is consistent with General Plan policies and
goals.
The project proposes development of 128 dwelling units on approximately 40.7 acres of
the approximately 109.2 acre site,with varying lot sizes,including 821ots of approximately
8,000 square feet, 171ots of approximately 9,200 square feet, and 29 lots of approximately
10,000 square feet. Thus,the overall density of development on the site would be less than
1.2 dwelling units per acre. Considering only the residential portion of the project site, the
density would be 3.1 dwelling units per acre. When considering the acreage of the
residential area only, the density of the project (3.1 dwelling units per acre} would be on
the low end of the General Plan's allowable density for the "low-density residential"
designation,which is 2.1 to 6.0 units per acre.Although the General Plan provides a density
range of 2.1-6.0 dwelling units per acre, it notes that the "expected" density for the low-
density residential designation is 5.0 dwelling units per acre, which is substantially higher
density than the proposed project's density.
The project proposes a zoning designation of single-family residential 8,000 square feet
(referring to minimum lot area). The single-family neighborhood to the north of the site is
similarly zoned low-density residentia18,000 square feet. The single-family neighborhood
that forms the eastern boundary of the site ("The Reserve") is zoned estate low-density
residential 40,000 square feet and has typical lot sizes of 20,000-44,000 square feet.
Surrounding residential uses to the east have typical lot sizes less than 10,000 square feet.
The neighborhoods south of the project site are zoned estate low density residentia140,000
square feet and estate low density residentia120,000 square feet. South of the project site,
the Jamestown neighborhood has a typical lot size of 8,000-11,000 square feet,the Orange
Park Acres neighborhood has a typical lot size of 50,000 square feet to 1 acre plus, the
Eichler Homes neighborhood has a typical lot size of 7,600-12,000 square feet, and The
Colony-South neighborhood has a typical lot size of 7,000-10,000 square feet. Refer to
RDEIR Section 2, Project Description, Figures 2-Sa through 2-Sg for the existing lot sizes
in surrounding neighborhoods.
The estate low-density residential designations have a density range of 0 to 2.0 dwelling
units per acre. While the estate low-density residential neighborhoods have slightly lower
densities than the project site,the project's density of 3.1 dwelling units per acre would be
substantially similar to the density range of the estate low-density neighborhoods near the
project site. In addition, the project would contain a substantial amount of open space,
which would counterbalance the density of the residential component of the project. As
082654\10786529v1 12
City of Orange Trails at Santiago Creek Project
noted above, while the density of the residential clustered component would be 3.1
dwelling units per acre, the overall density of the project would be less than 1.2 dwelling
units per acre when considering the entire site (128 dwelling units on a 109.2-acre site).
The project site is currently designated"Resource Area," "Low Density Residential," and
"Open Space"by the City of Orange General Plan.In accordance with the proposed proj ect,
the portion of the site north of Santiago Creek, currently designated as "Low Density
Residential," is proposed to be re-designated as "Open Space" and the portion of the site
currently designated as "Resource Area" is proposed to be re-designated to "Low Density
Residential," and "Open Space." The "Resource Area" land use designation reflects the
surface mining activities that occurred on the south side of Santiago Creek. General Plan
Land Use Element, page LU-23, notes that the "Resource Area designation provides for
the continued use of areas for mining and agriculture." The description for the Resource
Area designation(General Plan Land Use Element,page LU-16)states that the designation
"[a]llows for agricultural uses and continued use of stream and river channels for aggregate
mining. Passive and active recreational uses are also permitted. May serve as a holding
zone for future uses compatible with established and planned land uses in surrounding
areas."
The project is also consistent with the East Orange General Plan and the Orange Park Acres
Specific Plan, which will both be amended as part of the Project.
As the RDEIR concluded, the project is consistent with the OPA Plan and East Orange
Plan. This consistency is discussed in RDEIR Section 3.10, Land Use, Table 3.10-3,
showing the project would be consistent with the East Orange General Plan, and RDEIR
Table 3.10-4, showing the project would be consistent with the OPA Plan.
The East Orange General Plan encompasses approximately 1,900 acres. Approximately 37
acres of the project site are located within the boundaries of the East Orange General Plan.
While the East Orange General Plan does not outline goals and policies similar to
contemporary general plans, the project is consistent with concepts identified in the East
Orange General Plan. For example, the East Orange General Plan contains a concept that
where possible, new development should be compatible with existing residential densities
and should maintain continuity with architectural style, house size, and price range. The
project's residential area would have a density that is similar to or less dense than most
nearby residential areas, including the Jamestown neighborhood, which is within the East
Orange General Plan area. The East Orange General Plan envisions an"assortment of open
space categories." Approximately 37 acres of the project site are located within the
boundaries of the East Orange General Plan and are designated "Regional Park." While
the project would amend the 37 acres that are within the East Orange General Plan,the 37
acres are approximately 2 percent of the East Orange General Plan area. Additionally, the
proposed project includes 68.5 acres of open park space, split into 40.2 acres of Greenway
Open Space/Santiago Creek Riparian Corridor and 28.3 acres of Grasslands Open Space.
Therefore,the proposed project would include 68.5 acres of open space/park uses adjacent
to, and partially within, the East Orange General Plan; creating more open space in the
vicinity than the 37 acres of the project site that are within the East Orange General Plan.
082654\10786529v1 1 3
City of Orange Trails at Santiago Creek Project
proposed Trails of Santiago project.The current project includes less development and sets
aside a larger area for open space.
The project site is within the boundaries of the Orange County Central and Coastal
Subregion NCCP/HCP. The Santiago Creek corridor riparian habitat and the upland areas
north of the creek contain Coastal Sage Scrub habitat, which will be preserved as open
space. No conflicts with the NCCP/HCP would occur. Therefore, impacts to land use
would be less than significant with Project implementation.
As noted in Section 7 of the EIR, Effects Found Not To Be Significant, the project site
contains undeveloped land, remnants of past mining surface operations, and Santiago
Creek. There are no dwelling units on the project site. This condition precludes the
possibility of division of an established communiiy.
10. Mineral Resources
Impact Thresholds:
Threshold MIN-1: Would the project result in the loss of availability of a known
mineral resource that would be of value to the region and the
residents of the State?
Threshold MIN-2 Would the pNoject result in the loss of availability of a local-
important mineral resource recovery site delineated on a local
general plan, specific plan, oY other local Zand use plan?
Findin�: The discussion and analysis provided in the EIR concluded that the Proj ect would
have a Less Than Significant Impact on impacts for threshold MIN-1 and MIN-2 that were
addressed in the EIR, and that no Project Design Features, Standard Conditions of
approval, or mitigation measures were required or recommended. �
Facts in Support of the Findin�: The Project would not result in the loss of availability of
a known mineral resource that would be of value to the region of the residents of the State.
A permit pursuant to SMARA is not required because the mining operations ceased on the
project site prior to January 1, 1976. The General Plan Amendment and Rezone would
move the City designations associated with mining ("Resource Area" in the General Plan
and"Sand and Gravel Extraction"in the Zoning Ordinance). Impacts would be less than
significant and no mitigation is required.
11. Noise
Impact Thresholds:
Threshold NOI-2: Would the project expose persons to oN generate excessive
groundborne vibration or groundborne noise levels?
Threshold NOI-3: A substantial permanent inc�ease in ambient noise levels in the
pYoject vicinity?
082654\10786529v1 1 6
City of Orange Trails at Santiago Creek Project
Findin : The discussion and analysis provided in the EIR concluded that the Project would
have a Less Than Significant Impact on impacts for Threshold NO1-2 and NOI-3 that were
addressed in the EIR, and that no Project Design Features, Standard Conditions of
approval, or mitigation measures were required or recommended.
Facts, in Support of the Findin�: The Project's construction would generate vibration,
primarily during grading. However, vibration levels would be below the FTA threshold
and impacts during construction would not be significant.
During operation, vibration levels would be slightly above the level of perception for a
person sitting or lying down; however, vibration would be below FTA thresholds.
Therefore, operational vibration would be less than significant.
Roadway noise impacts would increase noise in the vicinity of the site; however, no
roadways would exceed the 75 dBA CNEL maximum noise exposure level and no
roadways would exceed the City's residential or school noise standard of 65 dBA CNEL.
Stationary noise levels would not case an increase above applicable standards. Impacts
would be less than significant and no mitigation is required.
As noted in Section 7 of the EIR, Effects Found Not To Be Significant, the project site is
10 miles from the closest airport and persons would not be exposed to aviation noise. No
impact would occur.
12. Population and Housing
Impact Thresholds:
Th�eshold POP-1: Would the project induce substantial population growth in an area,
either directly (for example, by proposing new homes and
businesses) or indirectly (for example, through extension of roads
or other infrastructure)?
Finding: The discussion and analysis provided in the EIR concluded that the Project would
have a Less Than Significant Impact on POP-1 addressed in the EIR, and that no Project
Design Features, Standard Conditions of approval, or mitigation measures were required
or recommended.
Facts in Support of the Findin�: The Project would develop 128 dwelling units, which
would increase the City's population by 393 persons. This would represent less than a 1%
increase relative to the City's 2016 population. Further, the project site is designated for
residential use. This indicates the project site has been contemplated to support future
population growth. Therefore, impacts would be less than significant with Project
implementation.
As noted in Section 7 of the EIR, Effects Found Not To Be Significant, there are no
dwelling units on the project site and no persons or housing would be displaced. No
impacts would occur.
082654\10786529v1 1']
City of Orange Trails at Santiago Creek Project
13. Public Services
Impact Thresholds:
Threshold PS-2: Would the project result in a need for new or expanded police
p�otection facilities?
Th�eshold PS-3: Would the project result in a need for new or expanded school
facilities?
Threshold PS-4: Would the project result in a need for new or expanded paYk
facilities?
Threshold PS-5: Would the project result in a need for new or expanded public
facilities such as libraries?
Findin : The discussion and analysis provided in the EIR concluded that the Project would
have a Less Than Significant Impact on Thresholds PS-2 through PS-5 and no Project
Design Features, Standard Conditions of approval, or mitigation measures were required
or recommended.
Facts in Support of the Findin�: The project would add 393 new residents to the City's
population, which would result in a minor increase in calls for law enforcement services.
The project site is approximately 4.6 miles from the Police Department headquarters. The
Police Department provided written comments on the project indicating that payment of
the Police Facility Development Fee required by the City's Municipal Code would offset
the increase in police services attributable to the project. The City's Code requires design
standards to be incorporated into new projects. The project would be required to comply
with the City's Code and impacts would be less than significant.
The new residential population would add 64 new students to the School District. The
school district assesses development fees to fund capital improvements to school facilities.
Payment of fees is full and complete mitigation for impacts to school facilities. Impacts to
schools would be less than significant.
The project would increase the demand for parks; however, it would also provide 68.5
acres of open space and recreational uses, which would offset the increased demand for
parks because residents would be expected to use the open space and recreational facilities.
Impacts would be less than significant.
The increase in population associated with the project would nominally increase demand
for local libraries. However, such a nominal increase would not require construction or
expansion of library facilities. Impacts would be less than significant.
14. Recreation
Impact Thresholds:
082654\10786529v1 1 g
City of Orange Trails at Santiago Creek Project
Th�eshold REC-1: Would the project incYease the use of existing neighborhood and
regional paYks oY other recreational facilities such that substantial
physical deterioration of the facility would occur or be accelerated?
ThYeshold REC-2: Would the project include recreational facilities or require the
construction or expansion of recreational facilities which might
have an adveYse physical effect on the environment?
Findin�: The discussion and analysis provided in the EIR concluded that the Project would
have a Less Than Significant Impact on Thresholds REC-1 and REC-2, and no Project
Design Features, Standard Conditions of approval, or mitigation measures were required
or recommended.
Facts in Support of the Finding: Approval of the proposed Project would result in the
construction of 128 dwelling units,which would increase demand for recreational facilities.
The project would provide 68.5 acres of open space and recreational uses, including active
use facilities and passive use areas. This provision would be expected to offset the
increased demand for park facilities because future residents would be expected to use
facilities closest to where they live. The project would not result in off-site construction of
new or expanded existing park facilities. Impacts associated with construction of
recreational facilities have been evaluated throughout the RDEIR. Therefore, impacts
would be less than significant and no mitigation is required.
15. Transportation and Traffic
Impact Thresholds:
Threshold TRANS-1: Wozcld the project conflict with an applicable plan, ordinance or
policy establishing measures of effectiveness for the peYfo�ynance of
the circulation system under Existing With Project Traffic
Conditions?
Threshold TRANS-3: Would the project conflict with an applicable plan, ordinance or
policy establishing measures of effectiveness for the performance of
the circulation system under Year 2040 Tra�c Conditions?
Threshold TRANS-4: Would the project conflict with an applicable congestion
management program, including, but not limited to level of service
standards and travel denzand measures, or other standards
established by the county congestion managenzent agency for
designated roads or highways?
ThYeshold TRANS-6: Would the project result in inadequate emergency access?
Th�eshold TRANS-7: Would the project conflict with adopted policies,plans, or progra�ns
, regarding public transit, bicycle, or pedest�ian facilities, or
othe�wise decrease the performance o�safety of such facilities?
082654\10786529v1 1 9
City of Orange Trails at Santiago Creek Project
Findin : The discussion and analysis provided in the EIR concluded that the Project would
have a Less Than Significant Impact on impacts for Threshold TRANS-1, TRANS-3,
TRANS-4, TRANS-6, and TRANS-7 that were addressed in the EIR, and that no Project
Design Features, Standard Conditions of approval, or mitigation measures were required
or recommended.
Facts in Support of the Finding: The Project proposes construction of 128 single-family
homes. Two traffic scenarios were analyzed: With Sand and Gravel traffic conditions and
Without Sand and Gravel traffic conditions.
Traffic Without Sand and Gravel Credit will not significant impact any of the 10 key study
area intersections. With Sand and Gravel Credit, the project will not significantly impact
any of the 10 key study intersections. For roadway segments, traffic associated with the
proposed project "Without Sand and Gravel Credit" will not significantly impact any of
the 17 key roadway segments. Traffic associated with the project"With Sand and Gravel
Credit"will not significantly impact any of the 17 key roadway segments.
In Year 2040 buildout conditions, traffic associated with the project "Without Sand and
Gravel Credit"will not significantly impact any of the key 10 study area intersections when
compared to standards and impact criteria. Likewise,in the 2040 scenario"With Sand and
Gravel Credit,"traffic will not exceed any LOS standards or significant impact criteria. In
2040, roadways would not be significantly impacted under either scenario.
East Santiago Canyon Road is identified in the Orange County Congestion Management
Program; however, the project would mitigate all impacts associated with deficient traffic
conditions on East Santiago Canyon Road. Therefore, no conflicts with the Congestion
Management Plan would occur. Impacts would be less than significant.
The project would take vehicular access from East Santiago Canyon Road via a signalized
driveway aligned with Nicky Way. All interior roadways would comply with applicable
Fire Code requirements, including for large emergency vehicles. Impacts to emergency
access would be less than significant and no mitigation is required.
The closest bus stop is 2 miles from the site and there are no plans to introduce bus service
closer to the project site. The project will not preclude or impede bus service. The project
would provide a network of trails that link existing trails and street frontages. It would
close a gap in the regional bicycle and pedestrian network. Class II bicycle lanes will be
maintained along Santiago Canyon Road and Cannon Street. Impacts would be less than
significant and no mitigation is required.
As noted in Section 7 of the EIR, Effects Found Not To Be Significant, the project site is
10 miles from the closest airport and no alterations to air traffic patterns would be required.
No impacts would occur.
16. Tribal Cultural Resources
Impact Thresholds:
082654\10786529v1 20
City of Orange Trails at Santiago Creek Project
Threshold TCR-1: Would the project cause a substantial adverse change in the
significance of a tribal cultural resource listed or eligible for listing
in the California Register of Historic Resources, or in a local
register of historical resources as defined in Public Resources Code
section 5020.1(k)?
Th�eshold TCR-2: Would the project cause a substantial adverse change in the
significance of a tribal cultuYal resource determined by the lead
agency, in its discretion and supported by substantial evidence, to
be significant puYsuant to criteria set forth in subdivision �Oof Public
Resources Code Section 5024.1?
Findin : The discussion and analysis provided in the EIR concluded that the Project would
have a Less Than Significant Impact on the two thresholds for tribal cultural resources that
were addressed in the EIR and that no Project Design Features, Standard Conditions of
approval, or mitigation measures were required or recommended.
Facts in Support of the Finding: The project site is not listed on any national, state,or local
registers of historic places(including those for tribal cultural resources). No tribal cultural
resources were observed during the field survey. The City has not received a tribal
consultation request from any of the tribes that were sent notification of the proj ect.
Impacts would be less than significant and mitigation is not required.
17. Utilities
Impact Thresholds
Threshold USS-1: Would the project be served with adequczte water supplies and not
require additioncrl entitlements or the construction or expansion of
water facilities?
ThYeshold USS-2: Would the project be served by a wastewater treatment plant with
adequate capacity and not require the construction of new or
expanded facilities?
Th�eshold USS-3: Would the project create a need for new or expanded downstream
storm drainage facilities?
Threshold USS-4: Would the project be served with adequate landfill capacity and
comply with federal, state, and local statutes and regulations related
to solid waste?
Threshold USS-5: Would the project result in the inefficient, unnecessary, or wasteful
use of energy?
Findin�: The discussion and analysis provided in the EIR concluded that the Project would
have a Less Than Significant Impact on the five utility thresholds that were addressed in
082654\10786529v1 2 1
City of Orange Trails at Santiago Creek Project
the EIR and that no Project Design Features,Standard Conditions of approval,or mitigation
measures were required or recommended.
Facts in Support of the Findin�: The project would be served with potable water provided
by the City of Orange. There are two existing water mains within East Santiago Canyon
Road. The project would install a network of water lines within the site that would connect
to the existing City water mains. The project's water demand is captured in full demand
projections set forth in the City's 2015 Urban Water Management Plan and can be met
under all scenarios. The City would not need to secure additional water supplies to serve
the project. Impacts would be less than significant and no mitigation would be required.
Wastewater for the project would be served and treated by OCSD. There is an existing
trunks sewer main in East Santiago Canyon Road and the project would install a network
of underground sewer piping on the project site that would connect to the sewer main. The
project's wastewater generation would be accommodated by OCSD and OCSD's plants
have sufficient capacity to treat the project's wastewater. Impacts would be less than
significant and no mitigation is required.
The project would increase the amount of impervious surfaces on the site and would create
potential for increased runoff leaving the site. The project would install a system of storm
drainage facilities that would be designed to detain flows from a 100-year storm event.
The project would result in a net reduction in the 2-year and 100-year storm event
discharges into Handy Creek storm drain. The system would slow, reduce, and meter the
volume of runoff leaving the site. Impacts would be less than significant and no mitigation
would be required.
The project's solid waste would represent a small amount of the total waste going to area
landfills during construction and operation of the project. The estimated waste would be
accommodated by existing landfills and impacts would be less than significant.
SCE would provide electrical service and SoCalGas would provide natural gas service to
the project site. A network of underground electrical lines would be installed within the
site and connect to existing SCE facilities along E. Santiago Canyon Road. The project
would demand approximately 805,632 kWh of electricity of 4.5 million cubic feet of
natural gas at buildout annually. The project would not result in wasteful, unnecessary, or
inefficient use of energy. Impacts would be less than significant and no mitigation would
be required.
B. POTENTIALLY SIGNIFICANT ENVIRONMENTAL IMPACTS
REDUCED TO LESS THAN SIGNIFICANT THROUGH
IMPLEMENTATION OF PROJECT DESIGN FEATURES
1. Biological Resources
Impact Thresholds:
Threshold BIO-1 Would the project have a substantial adverse effect on special status
plant species?
082654\10786529v1 22
City of Orange Trails at Santiago Creek Project
Description of the Impact: Implementation of the proj ect would result in the direct removal
of existing vegetation to develop tails. Two sensitive plant species were observed within
the site during surveys: the Southern California black walnut and southern tarplant.
Findin�: The City determines that this potential impact is Less Than Significant as a result
of compliance with the Standard Conditions described below.
Facts in Support of Finding: Impacts to the number of southern tarplants onsite are not
expected to threaten regional populations of the species. Moreover, a conservation
measure was implemented to preserve southern tarplant by salvaging seeds during
backfilling operations. Impacts to southern tarplant are less than significant. One walnut
may be potentially impacted by the project; however, the loss of one walnut tree out of 70
in the population is not considered significant. To avoid or minimize trail impacts to
sensitive biological resources, the following design features will be incorporated prior to
final design of the trails. With implementation of recommended design features, impacts
will be less than significant.
1. Trail D should be designed to avoid or minimize impacts to coastal sage scrub and
other native habitats, and should be designed to traverse through vegetation communities
that already exhibit disturbance. This trail should be a seasonal trail that is closed, or
partially closed, adjacent to habitat that may support special-status birds during breeding
season. Trail C and Trail E should utilize existing trail alignments and/or areas that already
exhibit disturbance to the extent possible.
2. Educational kiosks are recommended to inform the public about the ecology,
biological resources, and special-status species of the area, as well as emphasizing the
importance of staying on designated trails, respecting seasonal trail closures, and the
community's responsibility in protecting the natural resources.
3. Future environmental analysis will be needed at the time trail design is completed
and trail implementation is proposed.
The Santiago Creek corridor supports live-in and movement habitat for species. The
project was designed to avoid Santiago Creek and associated native habitat that is best
suited to support local and regional wildlife movement along the creek to the maximum
extent feasible through the following design features:
1. The proposed project will permanently retain approximately 38 acres of open space
located on both sides of Santiago Creek and bordered on the north by Mabury Avenue.
2. The majority of the southern cottonwood-willow riparian forest within the project
site will be avoided(i.e., 12.60 acres),with the exception of 0.10 acre of permanent impacts
will occur to an isolated patch of southern cottonwood-willow riparian forest on-site, and
0.04 acre of permanent impact and 0.05 acre of temporary impact from the installation of
an on-site storm drain outlet.
3. The proposed project will avoid the majority of Santiago Creek and its associated
native riparian and upland habitats. Approximately 38 acres of the project site will be
082654\10786529v1 23
City of Orange Trails at Santiago Creek Project
avoided, including 14.06 acres of sensitive plant communities, which includes 0.57 acre of
coastal sage scrub and 12.60 acres of southern cottonwood-willow riparian forest, within
and/or adjacent to Santiago Creek. A total of 0.04 acre of permanent impacts on-site and
0.05 acre of temporary impacts,which will be restored to pre-project conditions,will occur
to southern cottonwood-willow riparian forest for the installation of a storm drain outlet.
4. The proposed project will provide a 150-foot limited use (landscaping and fuel
modification) time sensitive (breeding season March 15 through September 15) setback
area adjacent to the southern cottonwood-willow riparian forest within Santiago Creek,
which provides habitat for the least Bell's vireo.
5. The proposed proj ect will provide select landscaping, including native species,
within the 150- foot limited use setback area (to the south of Santiago Creek) that is
compatible with the adjacent open space area, its habitat, and is considerate of the fire
protection (fuel modification) zone (refer to Exhibit 3.4-8).
6. The proposed project establishes development standards in the Specific Plan to
reduce sensory stimuli(e.g.,noise,light),unnatural predators(e.g.,domestic cats and other
nonnative animals), and competitors (e.g., exotic plants, non-native animals).
7. Prior to building permit issuance, the proposed project will remove the existing
fence on Orange County Flood Control District property.
8. The proposed project will restrict grading and/or construction activities within the
150-foot limited use setback area during the least Bell's vireo breeding season; refer to
Exhibit 3.4-8.
9. The proposed project will limit uses within the 150-foot limited use setback area to
those as uses identified in the Specific Plan.
With implementation of these design features, impacts would be less than significant.
C. POTENTIAL ENVIRONMENTAL IMPACTS DETERMINED TO BE
MITIGATED TO BELOW A LEVEL OF SIGNIFICANCE
1. Aesthetics
Impact Threshold:
Threshold AES-3: Would the pYoject create a new source of substantial light or glare
which would adversely affect day or nighttime views in the area?
Description of the Impacts: The proj ect may create a new source of light and gla.�e through
construction materials, solar panels, and window glazing that would adversely affect day
or nighttime views in the area.
082654\10786529v 1 24
City of Orange Trails at Santiago Creek Project
Finding: The City makes Finding 1 that changes or alterations have been required in, or
incorporated into the Project which avoid or substantially lessen the potentially significant
environmental effect described above and identified in the Final EIR.
Facts in Support of Findin�: City of Orange Municipal Code Section 17.12.030 regulates
the installation of new exterior lighting fixtures and requires that they be directed,
controlled, screened or shaded in such a manner as not to shine directly on surrounding
premises. Further, lighting on any residential property must be controlled so as to prevent
glare or direct illumination of any public sidewalk or thoroughfare. Nonetheless, the
proposed project has the potential to use construction materials, solar panels and window
glazing that have potential to increase light and glare in the proj ect vicinity. Mitigation
Measure AES-3 is required to reduce impacts to a less than significant level.
MM AES-3: Prior to issuance of building permits,the project applicant shall prepare and
submit lighting plans to the City of Orange for review and approval. The
plans shall demonstrate that all exterior lighting fixtures comply with
Orange Municipal Code Chapter 17.12.030, which requires that new light
fixtures be directed, controlled, screened or shaded in such a manner as not
to shine directly on surrounding premises. Additionally, lighting on any
residential property must be controlled so as to prevent glare or direct
illumination of any public sidewalk or thoroughfares.
With implementation of Mitigation Measure AES-3, impacts would be reduced to a less
than significant level.
2. Air Quality
Impact Threshold
Threshold AIR-4 Would the project expose sensitive receptors to substantial pollutant
concentrations?
Description of the Impacts: During construction of the project, exhaust emissions would
be generated and emissions are projected to exceed the cancer risk significance threshold.
Findin . The City makes Finding 1 that changes or alterations have been required in, or
incorporated into the Project which avoid or substantially lessen the significant
environmental effect described above and identified in the Final EIR.
Facts in Support of Finding. Implementation of the project would result in construction
and operational emissions. Nearby sensitive receptors are located in the residential areas
within 25 meters of the east edge of the project site. Unmitigated on-site emissions during
construction would not exceed Localized Significance Thresholds ("LST"); therefore, the
project would not expose receptors to substantial criteria pollutant concentrations from
construction activities. For informational purposes, Table 3.3-14 of Section 3.3 of the
Recirculated EIR includes emissions with implementation of Mitigation Measures AIR-la
through AIR-lg. With implementation of Mitigation Measures AIR-la through AIR-lg,
LSTs would not be exceeded.
082654\10786529v1 25
City of Orange Trails at Santiago Creek Project
During operation of the project, emissions would not exceed applicable operational LSTs.
The project would not expose receptors to substantial criteria pollutant concentrations from
operational-related activities.
Carbon monoxide ("CO") "hot spots" are caused by vehicular emissions. Based on the
traffic study prepared for the project, operation of the project would not generate a CO hot
spot that would exceed CO ambient air quality standards.
Air dispersion modeling was used to assess the project's potential health risks. The
project's construction emissions would not exceed non-cancer hazard thresholds.
However, construction emissions would exceed the cancer risk significance threshold.
However,with implementation of Tier IV Final mitigation,which is required by Mitigation
Measures AIR-la through AIR-lg,the project's construction emissions would be reduced
to below the cancer risk threshold.
3. Biological Resources
Impact Threshold
Th�eshold BIO-2: Would the project have a substantial adverse effect on special status
wildlife species?
Threshold BIO-3: Would the project impact sensitive natural communities?
Th�eshold BIO-4: Would the project impact federally protected wetlands?
Description of the Impacts: Implementation of the project would result in the direct
removal of existing habitat for wildlife species. Biological surveys for the project site
indicated that sensitive wildlife species were observed or have at least moderate potential
_ to occur on the proj ect site.
Implementation of the project would result in impacts to coast live oak woodland,mule fat
scrub, open water, ornamental, eucalyptus woodland, non-native grassland/non-native
herbaceous cover, non-native grasslandldisturbed, non-native herbaceous cover, non-
native herbaceous cover/black willow scrub, non-native herbaceous cover/mule fat scrub,
non-native herbaceous cover/disturbed, disturbed, disturbed/arroyo willow scrub,
disturbed/black willow scrub, disturbed/mule fat scrub, disturbed/non-native herbaceous
cover, and developed.
The project would result in impacts to approximately 170 linear feet and 0.01 acre of
USACE/RWQCB "waters of the United States"/"waters of the State," of which less than
0.01 acre is wetland and 0.07 acre is CDFW jurisdictional streambed and associated
riparian habitat.In addition,preliminary trails are conceptual in nature and final design will
be undertaken at a later date, at which time trail implementation may impact wetland
features.
082654\10786529v 1 2(
City of Orange Trails at Santiago Creek Project
Findin�: The City makes Finding 1 that changes or alterations have been required in, or
incorporated into the Project which avoid or substantially lessen the significant
environmental effect described above and identified in the Final EIR.
Facts in Support of Finding: The Project site contains suitable habitat within Santiago
Creek and the northern portion of the project site that has potential to support special-status
species. However, the majority of the areas with special status-species will be avoided.
The loss of individuals as a result of the project would not be expected to reduce regional
population numbers and impacts to special-status wildlife species are less than significant.
However, some conditionally covered species in the NCCP/HCP were observed onsite
and/or have habitat that support the conditionally covered species onsite,including the least
Bell's vireo.
The following nine project design features serve to avoid or minimize impacts on
the least Bell's vireo:
DF-BIO-1: The proposed project will permanently retain approximately 38 acres of
open space located on both sides of Santiago Creek and bordered on the
north by Mabury Avenue.
DF-BIO-2: The majority of the southern cottonwood-willow riparian forest within the
project site will be avoided(12.60 acres),with the exception of 0.10 acre of
permanent impacts that will occur to an isolated patch of southern
cottonwood-willow riparian forest on-site, 0.04 acre of permanent impact,
and 0.05 acre of temporary impact from the installation of an on-site storm
drain outlet.
DF-BIO-3: The proposed project will avoid the majority of Santiago Creek and its
associated native riparian and upland habitats. Approximately 38 acres of
the project site will be avoided, including 14.06 acres of sensitive plant
communities, which includes 0.57 acre of coastal sage scrub, and 12.60
acres of southern cottonwood-willow riparian forest within and/or adjacent
to Santiago Creek.
DF-BIO-4: The proposed project will provide a 150-foot limited use (landscaping and
fuel modification) time sensitive (breeding season March 15 through
September 15) setback area adjacent to the southern cottonwood-willow
riparian forest within Santiago Creek, which provides habitat for the least
Bell's vireo.
DF-BIO-S: The proposed project will provide select landscaping, including native
species, within the 150- foot limited use setback area (to the south of
Santiago Creek) that is compatible with the adjacent open space area, its
habitat, and is considerate of the fire protection (fuel modification) zone
(refer to Exhibit 3.4-8).
DF-BIO-6: The proposed project establishes development standards in the Specific
Plan to reduce sensory stimuli (e.g., noise, light), unnatural predators (e.g.,
082654\10786529v1 2'�
City of Orange Trails at Santiago Creek Project
domestic cats and other non- native animals), and competitors (e.g., exotic
plants, non-native animals).
DF-BIO-7: Prior to building permit issuance, the proposed project will remove the
existing fence on Orange County Flood Control District property.
DF-BIO-8: The proposed project will restrict grading and/or construction activities
within the 150-foot limited use setback area during the least Bell's vireo
breeding season; refer to Exhibit 3.4-8.
DF-BIO-9: The proposed project will limit uses within the 150-foot limited use setback
area to those as uses identified in the Specific Plan.
With implementation of the design features above, impacts would remain potentially significant.
Mitigation Measures BIO-2a through BIO-2c are required to reduce impacts to the least Bell's
vireo, raptors and songbirds to a less than significant level.
MM BIO-2a: Prior to the issuance of any grading permit for areas supporting least Bell's
vireo habitat (such as southern cottonwood-willow riparian forest), the
project Applicant shall obtain federal and state take authorizations via
regulatory permits (such as a CWA Section 404 permit issued by the
USACE), which will require that the USFWS be consulted as provided for
by Section 7 of the FESA (for the federally listed least Bell's vireo). The
federal regulatory permits (such as CWA Section 404 permit issued by the
USACE) provide a "federal nexus" by which Section 7 consultation can
occur. This statute imposes the obligation on federal agencies to ensure that
their actions (such as issuing federal CWA permits for this project) are not
likely to jeopardize the continued existence of a listed species or destroy or
adversely modify its designated critical habitat. This obligation is enforced
through the procedural requirement that agencies such as the United States
Army Corps of Engineers initiate consultation with the USFWS on any
actions that may afFect a threatened or endangered species. During the
FESA Section 7 consultation anticipated for this project, the USFWS will
gather all relevant information concerning the proposed project and the
potential project-related impacts on the least Bell's vireo (i.e., the project
Applicant will submit a species-specific Biological Assessment),prepare its
opinion with respect to whether the project is likely to jeopardize the
continued existence of the species (i.e., the USFWS will issue a Biological
Opinion), and recommend mitigation/conservation measures where
appropriate. Additionally, the need for State regulatory permits (i.e., Fish
and Game Code Section 1602 Streambed Alteration Agreement issued by
the CDFW) will require a Consistency Determination from the CDFW for
the State-listed least Bell's vireo under CESA.
082654\10786529v 1 2 g
City of Orange Trails at Santiago Creek Project
In addition, the following BMPs will ensure that indirect impacts will not
occur to the least Bell's vireo within 300 feet of occupied habitat as
monitored by a certified biologist:
1. Construction limits in and around least Bell's vireo potential habitat
shall be delineated with flags and fencing prior to the initiation of any
grading or construction activities.
2. Prior to grading and construction a training program shall be
developed and implemented to inform all workers on the project about listed
species,sensitive habitats,and the importance of complying with avoidance
and minimization measures.
3. All construction work shall occur during the daylight hours. The
construction contractor shall limit all construction-related activities that
would result in high noise levels according to the construction hours
determined by the City of Orange.
4. During all excavation and grading on-site, the construction
contractors shall equip all construction equipment, fixed or mobile, with
properly operating and maintained mufflers,consistent with manufacturers'
standards to reduce construction equipment noise to the maximum extent
possible. The construction contractor shall place all stationary construction
equipment so that emitted noise is directed away from sensitive receptors
(i.e., least Bell's vireo territory within Santiago Creek) nearest the project
site.
5. The construction contractor shall stage equipment in areas that will
create the greatest distance between construction-related noise sources and
noise sensitive receptors nearest the project site during all project
construction.
6. Noise from construction activities shall be limited to the extent
possible through the maximum use of technology available to reduce
construction equipment noise. Project-generated noise, both during
construction and after the development has been completed, shall be in
compliance with the requirements outlined in the City of Orange General
Plan Noise Element to ensure that noise levels to which the riparian area is
exposed do not exceed noise standards for residential areas. .
7. The project shall be designed to minimize exterior night lighting
while remaining compliant with City of Orange ordinances related to street
lighting. Any necessary lighting (e.g., to light up equipment for security
, measures), both during construction and after the development has been
completed, will be shielded or directed away from Santiago Creek and are
not to exceed 0.5 foot-candles. Monitoring by a qualified lighting engineer
(attained by the project Applicant and subject to spot checking by City
082654\10786529v I 2c)
City of Orange Trails at Santiago Creek Project
Staf� shall be conducted as needed to verify light levels are below 0.5 foot-
candles required within identified, occupied least Bell's vireo territories,
both during construction and at the onset of operations. If the 0.5 foot-
cand�les requirement is exceeded, the lighting engineer shall make
operational changes or install a barrier to alleviate light levels during the
breeding season.
8. Two brown-headed cowbird traps shall be installed and maintained
within the general vicinity of the habitat for five years. If equestrian trails
are proposed within the project site, which may result in increased horse
manure and the potential for increased foraging resources for brown-headed
cowbirds, an ongoing manure management receptacle/maintenance plan
shall be prepared and implemented.
MM BIO-2b: The following shall be incorporated into the Biological Assessment as
proposed mitigation for potential impacts to least Bell's vireo, subject to
USFWS and CDFW approval:
On- or off-site restoration or enhancement of least Bell's vireo habitat at a
ratio no less than 3:1 for permanent grading impacts.
MM BIO-2c: All construction, grading, and fuel modification activities (i.e., thinning)
shall take place outside of the least Bell's vireo breeding season (March 15
to September 15)to the greatest extent feasible.If any construction,grading,
and fuel modification activities are required during the breeding season
within 300 feet of potential least Bell's vireo habitat, and pre-construction
surveys determine least Bell's vireo are present, activities may continue in
the presence of a biological monitor who will confirm that no work will
occur within a 300-foot buffer of least Bell's vireo, and that any least Bell's
vireo are not being disturbed by project activities. If any disturbance to the
least Bell's vireo is detected by the biological monitor, the buffer will be
increased, other disturbance minimizing measures may be implemented
(e.g., visual and/or noise barrier), and/or work will cease as recommended
by the monitor.
Additional measures to be taken for all construction activities within 300
feet of potential least Bell's vireo habitat during the breeding season(March
15 to September 15):
1. Pre-construction surveys shall be conducted within 1 week prior to
initiation of construction activities and all results forwarded to the USFWS
and CDFW. Focused surveys shall be conducted for least Bell's vireo
during construction activities.
2. If at any time least Bell's vireo are found to occur within 300 feet of
construction areas, the monitoring biologist shall inform the appropriate
construction supervisor to cease such work and shall consult with the
082654\10786529v I 3 Q
City of Orange Trails at Santiago Creek Project
USFWS and CDFW to determine ifwork shall commence orproceed during
the breeding season and,if work may proceed,what specific measures shall
be taken to ensure least Bell's vireos are not affected.
3. Installation of any noise barriers and any other corrective actions
taken to mitigate noise during the construction period shall be
communicated to the USFWS and CDFW.
MM BIO-2d: Prior to the issuance of any grading permit that would remove habitats
containing raptor and songbird nests, the project Applicant shall
demonstrate to the satisfaction of the City that either of the following have
been or will be accomplished.
1. Vegetation removal activities shall be scheduled outside the nesting
season (September 1 to February 14 for songbirds; September 1 to January
14 for raptors)to avoid potential impacts to nesting birds.
2. Any construction activities that occur during the nesting season
(February 15 to August 31 for songbirds; January 15 to August 31 for
raptors) will require that all suitable habitat be thoroughly surveyed for the
presence of nesting birds by a qualified biologist before commencement of
clearing. If any active nests are detected, a buffer of at least 300 feet (500
feet for raptors) will be delineated, flagged, and avoided until the nesting
cycle is complete, or as determined appropriate by the biological monitor,
to minimize impacts.
With implementation of the design features and mitigation measures identified above, impacts
would be less than significant.
Implementation of the project would potentially impact sensitive natural communities. The project
site supports 0.76 acres of coastal sage scrub;however,the project would avoid impacts to coastal
sage scrub and no impacts to coastal sage scrub would occur. Nonetheless, sensitive communities
that are considered high priority for conservation would potentially be affected by the project,
including southern cottonwood-willow riparian forest. Implementation of mitigation measure
BIO-3 would reduce impacts to a less than significant level.
MM BIO-3 Prior to the issuance of any grading permit in the areas designated as
sensitive riparian communities (e.g., southern cottonwood-willow riparian
forest or black willow scrub/ruderal), the project Applicant shall
demonstrate to the satisfaction of the City that either of the following have
been or will be accomplished:
On-or off-site restoration or enhancement of sensitive riparian communities
(e.g., southern cottonwood-willow riparian forest) at a ratio no less than 1:1
for permanent impacts. Temporary impacts will be restored to pre-project
conditions (i.e., pre-project contours and revegetate with native species,
where appropriate). Off-site restoration or enhancement at a ratio no less
082654\10786529v1 3 1
City of Orange Trails at Santiago Creek Project
than 1:1 may include the purchase of mitigation credits at an agency-
approved off-site mitigation bank(e.g., Soquel Canyon Mitigation Bank).
If mitigation is to occur on-site and/or off-site (i.e., not an in-lieu fee
program),a mitigation and monitoring plan shall be prepared.The plan shall
focus on the creation of equivalent habitats within disturbed habitat areas of
the project site and/or off-site. In addition, the plan shall provide details as
to the implementation of the plan, maintenance, and future monitoring.
Mitigation for impacts to sensitive riparian communities shall be
accomplished by on- or off-site restoration and/or enhancement (e.g.,
transplantation, seeding, and/or planting/staking of sensitive riparian
species; salvage/dispersal of duff and seed bank; removal of large stands of
giant reed within riparian areas).
The final design of trails will be completed prior to the 60th Certificate of Occupancy. In order to
minimize trail impacts to sensitive biological resources, DF-BIO-1 through DF-BIO-9 above
would be required. With implementation of DF-BIO-1 through DF-BIO-9 above, impacts to
biological resources as a result of trail implementation would be less than significant.
The project will result in impacts to approximately 170 linear feat and 0.01 acre of
USACE/RWQCB waters of the United States/waters of the State. Potential impacts to
jurisdictional waters will be reduced to a less than significant level with implementation of
mitigation measure BI0=4.
MM BIO-4: With implementation of the design features above, trail development will
not impact sensitive biological resources. Impacts will be less than
significant. Prior to the issuance of any grading permit for permanent
impacts in the areas designated as jurisdictional features, the project
Applicant shall obtain a CWA Section 404 permit from the USACE,a CWA
Section 401 permit from the RWQCB, and Streambed Alteration
Agreement permit under Section 1602 of the California Fish and Game
Code from the CDFW. The following would be incorporated into the
permitting, subject to approval by the regulatory agencies:
1. On- or off-site restoration or replacement of USACE/RWQCB
jurisdictional waters of the United States/waters of the State at a ratio no less than
2:1 for permanent impacts, and for temporary impacts, restore impact area to pre-
project conditions (i.e., pre-project contours and revegetate with native species,
where appropriate). Off-site restoration or enhancement at a ratio no less than 2:1
may include the purchase of mitigation credits at an agency-approved off-site
mitigation bank or in-lieu fee program (e.g., Soquel Canyon Mitigation Bank).
2. On- or off-site restoration or enhancement of CDFW jurisdictional
streambed and associated riparian habitat at a ratio no less than 2:1 for permanent
impacts, and for temporary impacts, restore impact area to pre-project conditions
(i.e., pre-project contours and revegetate with native species, where appropriate).
Off-site restoration or enhancement at a ratio no less than 2:1 may include the
082654\10736529v 1 3 2
City of Orange Trails at Santiago Creek Project
purchase of mitigation credits at an agency-approved off-site mitigation bank(e.g.,
Soquel Canyon Mitigation Bank).
With implementation of Mitigation Measure BIO-4, impacts would be less than significant.
4. Cultural Resources
Irnpnct Threshold
ThNeshold CUL-1: Would subsurface construction activities associated with the
proposed p�oject damage or destroy previously undiscovered
historic resources?
Threshold CUL-2: Would subsurface construction activities associated with the
proposed project damage or destroy previously undiscovered
archaeological resources?
Threshold CUL-3: Would subsurface const�uction activities associated with the
proposed project damage or destroy previously zcndiscovered
paleontological�°esources?
Threshold CZ/L-=�: Would subsurface construction activities associated with the
proposed project may damage or destroy previously undiscovered
hZrman burial sites?
Description of the Impact: The archaeological records search identified one previously
recorded resources within the proj ect boundary. Additionally,portions of the concrete and asphalt
lot may be of historic age.
Records indicate that portions of Santiago Creek drainage have surficial deposits of older
Quaternary alluvium. It is possible that significant paleontological resources may be adversely
impacted by development-related ground disturbance.
Project construction has the potential to disturb existing or known formal cemeteries within or
adjacent to the project site.
Findin : The City makes Finding 1 that changes or alterations have been required in, or
incorporated into the Project which avoid or substantially lessen the significant environmental
effect described above and identified in the Final EIR.
Facts in Support of Findin�: The project site contains four structures along Santiago
Canyon Road along the southern project area boundary. Four additional structures are depicted in
the southeastern corner of the project area;however,with the exception of one potentially historic-
age foundation and an adjacent concrete and asphalt lot, no evidence of these structures were
detected during a pedestrian survey. During the survey, no prehistoric-age resources and one
potentially historic-age foundation and an adjacent asphalt and concrete lot were detected.Portions
of the concrete and asphalt lot may be of historic age and were recorded in conjunction with the
foundation as "Site 001." This resource does not appear to be significant and is not considered
082654\10786529v 1 33
City of Orange Trails at Santiago Creek Project
historical or archaeological. It could not be relocated during present surveys or previous surveys,
presumably due to the negligible surface visibility at the mapped location and collection of some
or all of the surface artifacts during a subsurface testing program. Minimal impacts to the remnants
of the site would occur, as its location would be avoided by development.
There is a high probability that significant, intact subsurface deposits could be uncovered during
development. Therefore, Mitigation Measure CUL-1 is required.
MM CUL-1: In the event that buried cultural resources are discovered during
construction, operations shall stop within a 50-foot radius of the find and a
qualified archaeologist shall be consulted to determine whether the resource
requires further study. The qualified archaeologist and shall make
recommendations to the Lead Agency on the measures that shall be
implemented to protect the discovered resources, including but not limited
to excavation of the finds and evaluation of the finds in accordance with
Section 15064.5 of the CEQA Guidelines. Potentially significant cultural
resources consist of but are not limited to stone,bone,fossils,wood, or shell
artifacts or features, including hearths, structural remains, or historic
dumpsites. Any previously undiscovered resources found during
construction within the project area should be recorded on appropriate
Department of Parks and Recreation (DPR) forms and evaluated for
significance in terms of CEQA criteria.
If the resources are determined to be unique historic resources as defined
under Section 15064.5 of the CEQA Guidelines, mitigation measures shall
be identified by the monitor in accordance with Public Resource Code
Section 21083.1 and CEQA Guidelines Section 15126.4 and recommended
to the Lead Agency. Appropriate mitigation measures for significant
resources could include avoidance or capping, incorporation of the site in
green space,parks, or open space, or data recovery excavations of the finds.
No further grading shall occur in the area of the discovery until the Lead
Agency approves the measures to protect these resources. Any
archaeological artifacts recovered as a result of mitigation shall be donated
to a qualified scientific institution approved by the Lead Agency where they
would be afforded long-term preservation to allow future scientific study.
The 2011 Addendum to the archaeological report prepared by BCR Consulting indicated that
archaeological monitoring is required during ground disturbing activities in the areas depicted on
Exhibit 3.5-1 in the Final EIR. Mitigation Measure CUL-2 is required within this area during
ground disturbing activities.
MM CUL-2: During the ground disturbing activities in the areas depicted in Exhibit 3.5-
1, a qualified archaeological and paleontological monitor shall be present
on-site to observe earthwork activities. In the event of a discovery of an
archaeological or paleontological resource, the monitor shall have the
discretion to halt all ground disturbing activities within 50 feet of the find
082654\10786529v1 34
City of Orange Trails at Santiago Creek Project
until it has been evaluated for significance. If the find is determined to have
archaeological or paleontological significance,the procedures in Mitigation
Measure CUL-1 or Mitigation Measure CUL-3 shall be implemented.
Monitoring may cease once all of the areas depicted in Exhibit 3.5-1 have
been thoroughly disturbed.
With implementation of Mitigation Measure CUL-2, impacts would be less than significant.
Records indicate that it is possible that significant paleontological resources along the Santiago
Creek drainage may be adversely impacted by development-related ground disturbance. The
project area has varied paleontological sensitivity ranging from low to high. Implementation of
Mitigation Measure CUL-3 would reduce potential impacts to a less than significant level.
MM CUL-3 If the subsurface excavations for this project are proposed to exceed depths
of 15 feet below surface, a qualified paleontological monitor should be
retained to observe such excavations, which may breach the older
Quaternary Alluvium deposits. In this situation, a detailed Mitigation
Monitoring Plan (MMP) or Paleontological Resource Impact Management
Plan (PRIMP) should be prepared in order to set forth the observation,
collection, and reporting duties of the paleontological monitor. Additional
mitigation measures and procedures will be outlined in the MMP or PRIMP
as needed.
In the event that fossils or fossil-bearing deposits are discovered during
construction activities that are shallower than 10 feet in depth, excavations
within a 50-foot radius of the find shall be temporarily halted or diverted.
The project contractor shall notify a qualified paleontologist to examine the
discovery. The paleontologist shall document the discovery as needed (in
accordance with Society of Vertebrate Paleontology standards), evaluate
the potential resource, and assess the significance of the find under the
criteria set forth in CEQA Guidelines Section 15064.5.
The paleontologist shall notify the appropriate agencies to determine
procedures that would be followed before construction activities are
allowed to resume at the location of the find. If the Applicant determines
that avoidance is not feasible,the paleontologist shall prepare an excavation
plan for mitigating the effect of construction activities on the discovery. The
plan shall be submitted to the Lead Agency for review and approval prior
to implementation, and the Applicant shall adhere to the recommendations
in the plan.
� With implementation of Mitigation Measure CUL-3, impacts would be less than significant.
Ground disturbing activities during construction could possibly uncover previously unknown
buried human remains. Mitigation Measure CUL-4 is required to reduce potential impacts.
MM CUL-4: In the event of an accidental discovery or recognition of any human remains,
Public Resource Code (PRC) Section 5097.98 must be followed. In this
082654\10786529v 1 3 5
City of Orange Trails at Santiago Creek Project
instance, once project-related earthmoving begins and if there is accidental
discovery or recognition of any human remains,the following steps shall be
taken:
1. There shall be no further excavation or disturbance of the site or any
nearby area reasonably suspected to overlie adjacent human remains until
the County Coroner is contacted to determine if the remains are Native
American and if an investigation of the cause of death is required. If the
coroner determines the remains to be Native American, the coroner shall
contact the NAHC within 24 hours, and the Native American Heritage
Commission (NAHC) shall identify the person or persons it lielieves to be
the "most likely descendant" of the deceased Native American. The most
likely descendant may make recommendations to the landowner or the
person responsible for the excavation work, for means of treating or
disposing of, with appropriate dignity, the human remains and any
associated grave goods as provided in PRC Section 5097.98, or
2. Where the following conditions occur, the landowner or his/her
authorized representative shall rebury the Native American human remains
and associated grave goods with appropriate dignity either in accordance
with the recommendations of the most likely descendent or on the project
area in a location not subject to further subsurface disturbance:
• The NAHC is unable to identify a most likely descendent or the most
likely descendent failed to make a recommendation within 48 hours
after being notified by the commission;
• The descendent identified fails to make a recommendation; or
• The landowner or his authorized representative rejects the
recommendation of the descendent,and the mediation by the NAHC
fails to provide measures acceptable to the landowner.
With implementation of Mitigation Measure CUL-4,impacts would be less than significant.
5. Geology and Soils
Impact Threshold
Threshold GEO-1: Would the project expose people or structures to potential
substantial adverse effects, including the risk of loss, injury or
death involving seismic hazard?
Threshold GEO-2: Would the project result in substantial soil erosion of the loss of
topsoil?
Description of the Impacts: Southern California is seismically active and the project site
would be subject to moderately strong to strong seismic ground shaking. The potential for
082654110786529v1 3 6
City of Orange Trails at Santiago Creek Project
liquefaction is considered low to moderate. Project development would involve vegetation
removal, grading, and other activities that have the potential to result in erosion.
Findin s: The City makes Finding 1 that changes or alterations have been required in, or
incorporated into the Project which avoid or substantially lessen the significant environmental
effect described above and identified in the Final EIR.
Facts in Support of Findings: The El Modeno and Peralta Hills faults are located less than
0.5 miles from the project site. However, a fault investigation concluded that the El Modeno Fault
does not cross the project site. Further, the Peralta Hills Fault is not sufficiently active. For these
reasons, fault rupture hazards would not be significant. However, Southern California is
seismically active and the site will experience moderately strong to strong ground shaking. In '
addition, the potential for liquefaction is considered low to moderate. Mitigation Measure GEO-
1 is required to mitigate potential impacts. The project would involve development of 40.7 acres
of residential development and 68.5 acres of open space. Development would involve vegetation
removal, grading, soil engineering, and other activities with the potential to result in erosion.
Mitigation Measures GEO-1 and HYD-la would be required.
MM GEO-1: Prior to the issuance of building permits, the project applicant shall submit
a design-level Geotechnical Investigation to City of Orange for review and
approval. The investigation shall be prepared by a qualified engineer and
identify grading and building practices necessary to achieve compliance
with the latest adopted edition of the California Building Standards Code's
geologic, soils, and seismic requirements. The measures identified in the
approved report shall be incorporated into the Proj ect plans.
MM HYD-la: Prior to the issuance of grading permits, the project applicant shall file a
Notice of Intent with and obtain a facility identification number from the
State Water Resources Control Board. The project applicant shall also
� submit an SWPPP to the California State Water Resources Control
Board/Santa Ana Regional Water Quality Control Board. The SWPPP that
identifies specific actions and BMPs to prevent stormwater pollution during
construction activities. The SWPPP shall identify a practical sequence for
BMP implementation, site restoration, contingency measures, responsible
parties, and agency contacts. The SWPPP shall include but not be limited
to the following elements:
• Comply with the requirements of the State of California's most
current Construction Stormwater Permit.
• Temporary erosion control measures shall be implemented on all
disturbed areas.
• Sediment shall be retained on-site by a system of sediment basins,
traps, or other BMPs.
082654110786529v I 3 7
City of Orange Trails at Santiago Creek Project
• The construction contractor shall prepare Standard Operating
Procedures for the handling of hazardous materials on the
construction site to eliminate discharge of materials to storm drains.
• BMP performance and effectiveness shall be determined either by
visual means where applicable (e.g., observation of above-normal
sediment release), or by actual water sampling in cases where
verification of contaminant reduction or elimination (such as
inadvertent petroleum release) is required by the Santa Ana
Regional Water Quality Control Board to determine adequacy of the
measure.
• In the event of significant construction delays or delays in final
landscape installation,native grasses or other appropriate vegetative
cover shall be established on the construction site as soon as possible
after disturbance, as an interim erosion control measure throughout
the wet season.
The project site is not located in the vicinity of large hills or steep mountainsides;therefore,
landslide impacts are not anticipated.
With implementation of Mitigation Measure GEO-1 and HYD-la, impacts would be less
than significant.
6. Hazards and Hazardous Materials:
Impact Thresholds:
Th�eshold HAZ-2: Would the p�oject create a significant hazard to the public or the
environment through reasonably foreseeable upset and accident
conditions involving the likely release of hazardous materials into
the environment?
Threshold HAZ-4: Would the p�oject be located on a site which is included on a list of
hazardous materials sites compiled pursuant to Government Code
Section 65962.S and, as a result, would it create a signifzcant hazard
to the public or the environment?
Threshold HAZ-S: Would the project impair implementation of or physically interfere
with an adopted emergency response plan or emergency evacuation
plan?
Threshold HAZ-6: Would the p�oject expose persons or property to wildland fire
hazards?
Description of the Impacts: The project site previously supported agricultural and mining
activities and is adjacent to the closed Villa Park landfill. There is potential that
082654\10786529v1 3 g
City of Orange Trails at Santiago Creek Project
development and operation of the project could expose persons to hazards as a result of
these uses.
The Fire Department noted that the project would be required to provide two points of
emergency access to comply with Fire Code requirements.
The eastern portion of the site abuts Santiago Oaks Regional Park and contains the wooded
Santiago Creek Corridor. The project may expose persons or property to wildland fire
hazards.
Findin�s: The City makes Finding 1 that changes or alterations have been required in, or
incorporated into the Project which avoid or substantially lessen the significant
environmental effect described above and identified in the Final EIR.
Facts in Support of Findin�s: A Phase II Environmental Site Assessment was conducted
for the project site. The Phase II determined that there was potential for vapor intrusion of
TCE and methane into future dwelling units and elevated levels of Total Petroleum
Hydrocarbons in soil. Mitigation Measures HAZ-la through HAZ-2c are required to
reduce impacts related to these hazards.
MM HAZ-2a A supplemental Phase II Environmental Site Assessment shall be conducted
to further delineate the vertical and lateral extent of the contamination. The
proposed enclosed structures shall be situated strategically, using
supplemental Phase II Environmental Site Assessment data and DTSC's
review thereof, so that structures will not interfere with future remediation
of any potential landfill gas migration; this shall be demonstrated in
connection with approval of any tentative maps for the project. Prior to
issuance of building permits for dwelling units in areas of the project site
where vapor intrusion has the potential to occur,the applicant shall prepare
and submit plans to the City of Orange, DTSC, or the Local Enforcement
Agency (which is the County of Orange Environmental Health Division)
identifying vapor intrusion abatement measures for trichloroethylene(TCE)
and methane. Areas where vapor intrusion has the potential to occur are
those identified in the Phase II Environmental Site Assessment.
The Phase II Environmental Site Assessment shall be conducted in
substantial compliance with applicable guidance documents, including but
not limited to the DTSC Advisory—Active Soil Gas Investigation and Final
Guidance for Evaluation and Mitigation of Subsurface Vapor Intrusion to
Indoor Air. The Phase II Environmental Site Assessment shall use current
DTSC HHR.A Note 3 and Regional Screening Levels established by the
U.S. Environmental Protection Agency. Following preparation of the Phase
II Environmental Site Assessment, a soil risk management plan shall be
prepared to address any discovery of previously unknown contamination
and shall be submitted to DTSC. These reports shall be conducted pursuant
to applicable DTSC advisories, and abatement shall be implemented as
directed by DTSC. Such abatement measures may include but are not
082654\10786529v 1 3 9
City of Orange Trails at Santiago Creek Project
limited to vapor barriers or passive/active venting systems, as determined
by the appropriate regulatory agency,unless determined not to be necessary
by the City in consultation with the Local Enforcement Agency. All
occupied structures within a 1,000 foot radius of the landfill shall include
the following structural controls to limit the potential for landfill gas
accumulation (unless such controls are determined not to be necessary by
the City in consultation with the Local Enforcement Agency): (1) a
geomembrane between the slab and the subgrade;(2)a permeable layer with
venting pipe between the geomembrane; and (3) automatic methane gas
sensors with audible alarms in the permeable layer and inside the structures.
The soil risk management plan shall include, among other provisions,
worker safety practices and procedures for discoveries of hazardous
materials, including those already identified at the site. If DTSC concludes
that additional mitigation is needed, the applicant shall work with DTSC
and the City to jointly develop additional mitigation measures that meet
residential standards.
The approved abatement measures shall be incorporated into proj ect
building plans. Design plans for: 1) any occupied structures within 1,000
feet of the landfill boundary; and/or 2) structural systems to prevent gas-
related hazards are required to be reviewed and approved by the Local
Enforcement Agency(which is the County of Orange Environmental Health
Division).
MM HAZ-2b Prior to issuance of grading permit for construction of the residential portion
of the project, the project applicant shall retain a qualified hazardous
materials contractor to remove all soil containing Total Petroleum
Hydrocarbons in excess of residential development standaxds set forth by
the California Department of Toxic Substances Control (DTSC) or other
applicable regulatory agency. Soil removal and disposal shall occur in
accordance with DTSC (or other applicable agency) guidelines. Additional
groundwater sampling shall be conducted under the guidance of DTSC,
focused on the area within 1,000 feet of the Villa Park landfill, to assess
whether TPH,methane, and/or VOCs have impacted groundwater at levels
that generate either significant human health or ecological risk, which was
encountered at depths of 20 to 50 feet bgs. If the groundwater is affeeted, a
multi-media risk assessment shall be conducted under the guidance of
DTSC,and abatement measures as required by DTSC shall be implemented,
subject to final confirmation by the City.
The applicant shall submit documentation to the City of Orange in the form
of confirmatory soil and groiandwater sampling results verifying that this
mitigation measure was successfully implemented as part of the grading
permit application for this property. All environmental investigations,
sampling and/or remediation for the project site shall be conducted under a
workplan approved and overseen by a regulatory agency with jurisdiction
to oversee hazardous substance cleanup, such as DTSC and/or the Regional
082654\10786�29v 1 40
City of Orange Trails at Santiago Creek Project
Water Quality Control Board (RWQCB). As part of proper construction
operations and maintenance, any construction areas that are found to
contain contaminated soils shall be excluded using a security fence. All
contaminated soils shall then be excavated and disposed of off-site in
accordance with the rules and regulations of: US Department of
Transportation (USDOT), USEPA, CaIEPA, CaIOSHA, and any local
regulatory agencies. All retention and detention features used during
construction would be lined to prevent infiltration through contaminated
soils. Post-construction retention features shall be lined to prevent
infiltration of groundwater.
MM HAZ-2c: Prior to commencement of any construction activities that would impact
existing landfill or related gas monitoring equipment, the project applicant
shall contact the City Engineer to consult with and obtain approval from the
Orange County Integrated Waste Management Department for the
relocation of any monitoring wells or probes that would be impacted by
development on the project site.
With implementation of Mitigation Measures HAZ-2a through HAZ-2c, impacts related to
potentially hazardous materials affecting property or persons would be less than significant.
The project would take vehicular access from E. Santiago Canyon Road via a signalized driveway
aligned with Nicky Way. The Fire Department noted that the project would be required to provide
two points of emergency access. Mitigation Measure HAZ-5 is therefore required.
MM HAZ-5: Prior to issuance of the first building permit,the applicant shall prepare and
submit plans to the City of Orange for review and approval demonstrating
compliance with all applicable emergency access provisions of the Fire
Code. The approved plan shall be incorporated into the proposed project.
With implementation of mitigation measure HAZ-5, impacts related to emergency access would
be less than significant.
The eastern portion of the project site abuts Santiago Oak Regional Park and contains the wooded
Santiago Creek Corridor. The project site is located at the wildlife/urban interface. As discussed
in RDEIR Section 3.8, Hazards and Hazardous Materials, page 3.8-16, the project proposes to
strategically place approximately 68.5 acres of open space/grasslands and greenway with managed
vegetation within the western,northern, and eastern portions of the project site in order to provide
sufficient protection from wildland fires and alleviate related impacts. The project's open space
areas will constitute a buffer against the spread of fire. Planning Area B,the Grassland area south
of Santiago Creek, includes a managed vegetation/fuel modification zone north of and east of
Planning Area C that would act as a vegetative buffer between the open space and residential
neighborhood. The buffer zone would be 130 feet wide and would include plantings responsive to
fuel management policies. In addition,the project proposes a 20-foot wet zone within the rear yard
of the residential lots to support fuel management policies. The managed vegetation/fuel
modification zones comply with fuel modification requirements in Section 320 of the Orange
County Fire Code (as required by City of Orange Municipal Code Section 15.32.020). Upon
082654\10786529v1 4 1
City of Orange Trails at Santiago Creek Project
dedication of the open space in Planning Areas A and B to the City of Orange, County of Orange,
or another entity, the applicant/developer will retain an easement for fuel modification zone
maintenance.
Orange General Plan, Public Safety Element, page PS-4, notes that "keeping neighborhoods
buffered from both urban and wildland fire hazards reduces incidents requiring response, and
minimizes damage to property when fires to occur." Orange General Plan, Public Safety Element,
page PS-19,states that development within or adjacent to an identified wildland fire area". . .must
prepare and implement a comprehensive fuel modification program in accordance with City
regulations. The City will review new developments and fire services to ensure adequate
emergency services and facilities to residents and businesses."
Orange General Plan, Public Safety Element, Goal 3.0 on page PS-4, is to "[p]rotect lives and
property of Orange residents and businesses from urban and wildland fire hazards."
Orange General Plan, Public Safety Element, Policy 3.3 states:
Require planting and maintenance of fire-resistant slope cover to reduce the risk of brush
fires within the wildland-urban interface areas located in the northern and eastern portions
of the City and in areas adjacent to canyons, and develop and implement stringent site
design and maintenance standards for all areas with high wild land fire potential. To the
extent possible, native, non-invasive plant materials are encouraged.
The General Plan Public Safety Element goal and policy above would be advanced by
incorporating open space and a vegetative buffer as part of the proj ect. The vegetative buffer would
include plantings responsive to fuel management policies and all City fuel management standards
would be met.
The proposed project would include a robust fire protection system as required by the California
Building Code. Fire sprinkler systems and ignition resistant structures have a very high success
rate for confining fires or extinguishing them. Additionally, there are two fire stations within 2
miles of the project site: Orange Fire Department Station No. 8, which is 1.75 miles from the
project site,and Orange County Fire Authority Station No. 23,which is 0.64 mile from the project
site. Emergency response times from the City of Orange Fire Department would be approximately
3 minutes and 45 seconds. Fire stations near the project site would increase the likelihood of
successful initial attacks to limit the spread of wildfires. The fire protection system on-site would
provide protection from on-site fires spreading to off-site vegetation through the required fuel
modification zone. Accidental fires within the landscape or structures in the project area would
have limited ability to spread. Landscaping throughout the project site and on its perimeter would
be highly maintained, and much of it would be irrigated, which would further reduce its ignition
potential.
In addition, RDEIR Section 3.8, Hazards and Hazardous Materials, Mitigation Measure HAZ-6
will be implemented to require the applicant to prepare a Fuel Modification Plan for submission
to the City of Orange for review and approval prior to the issuance of building permits, consistent
with the Fire Department's recommendation that the project meet the City's fuel modification
requirements.
082654\10786529v1 42
City of Orange Trails at Santiago Creek Project
As identified in the RDEIR, with implementation of project features, incorporation of open space
areas and vegetative buffers as part of the project, compliance with City requirements for fuel
modification, and Mitigation Measure HAZ-6, impacts would be less than significant.
MM HAZ-6: Prior to issuance of the first building permit, the applicant shall retain a
qualified fire safety consultant to prepare a Fuel Modification Plan for the
proposed project. The plan shall identify defensible space around dwelling
units in accordance with City requirements. The plan shall be submitted to
the City of Orange for review and approval. The approved plan shall be
incorporated into the proposed project.
With implementation of Mitigation Measure HAZ-6, impacts would be less than significant.
7. Hydrology and Water Quality
Impact Thresholcls
Threshold HYD-1: Would construction or operational activities associated with the
proposed project potentially degrade water quality in downstream
water bodies?
Threshold HYD-5: Would the pNoject be susceptible to inundation from dam failure?
Description of the Im�acts: Construction and operational activities associated with the
project may potentially degrade water quality downstream due to construction and
operation of residential and open space uses. The project may be susceptible to inundation
from dam failure because Santiago Dam is located 1.3 miles upstream of the project site
and Villa Park Dam is located 1.5 miles upstream of the project site.
Findin : The City makes Finding 1 that changes or alterations have been required in, or
incorporated into the Project which avoid or substantially lessen the significant
environmental effect described above and identified in the Final EIR.
Facts in Su��ort of Finding: Project implementation would require grading, building
construction, and paving activities. During construction, there is a potential for surface
water to carry sediment into local waterways. Mitigation Measure HYD-la would be
required to require the Applicant to implement a Stormwater Pollution Prevention Plan
(SWPPP) during construction to minimize pollutants.
MM HYD-la: Prior to the issuance of grading permits, the project applicant shall file a
Notice of Intent with and obtain a facility identification number from the
State Water Resources Control Board. The project applicant shall also
submit an SWPPP to the California State Water Resources Control
Board/Santa Ana Regional Water Quality Control Board. The SWPPP that
identifies specific actions and BMPs to prevent stormwater pollution during
construction activities. The SWPPP shall identify a practical sequence for
BMP implementation, site restoration, contingency measures, responsible
082654\10786529v 1 43
City of Orange Trails at Santiago Creek Project
parties, and agency contacts. The SWPPP shall include but not be limited
to the following elements:
• Comply with the requirements of the State of California's most
current Construction Stormwater Permit.
• Temporary erosion control measures shall be implemented on all
disturbed areas.
• Sediment shall be retained on-site by a system of sediment basins,
traps, or other BMPs.
• The construction contractor shall prepare Standard Operating
Procedures for the handling of hazardous materials on the
construction site to eliminate discharge of materials to storm drains.
• BMP performance and effectiveness shall be determined either by
visual means where applicable (e.g., observation of above-normal
sediment release), or by actual water sampling in cases where
verification of contaminant reduction or elimination (such as
inadvertent petroleum release) is required by the Santa Ana
Regional Water Quality Control Board to determine adequacy of the
measure.
• In the event of significant construction delays or delays in final
landscape installation,native grasses or other appropriate vegetative
cover shall be established on the construction site as soon as possible
after disturbance, as an interim erosion control measure throughout
the wet season.
�
Implementation of Mitigation Measure HYD-la would reduce impacts during construction to a
less than significant level.
During operation of the project, pollutants such as sediment, trash and debris, bacteria, oil and
grease, pesticides, and metals would potentially enter local waterways. To ensure stortnwater
quality measures are implemented during operation of the project, Mitigation Measure HYD-lb
would be required.
MM HYD-lb:Prior to the issuance of building permits, the project applicant shall submit
a WQMP to the City of Orange for review and approval. The plan shall be
developed using the Orange County Model Water Quality Management
Plan and Technical Guidance Document. The WQMP shall identify
pollution prevention measures, low impact development features, and
BMPs necessary to control stormwater pollution from operational activities
and facilities, identify hydromodification flow controls, and provide for
appropriate maintenance over time. The WQMP shall include design
concepts and BMPs that are intended to address the Design Capture
Volume, more commonly referred to as the "first flush," and remove
0826�4\10786529v1 44
City of Orange Trails at Santiago Creek Project
pollutants from the design system event before entering the MS4. In
accordance with the Regional MS4 Permit and City of Orange WQMP
requirements,the use of low impact development features will be consistent
with the prescribed hierarchy of treatment provided in the Permit: including
techniques to infiltrate, filter, store, evaporate, or retain runoff close to the
source of runoff. For those areas of the project where infiltration is not
recommended or acceptable and harvest/reuse demands are insufficient,
biofiltration features will be designed to treat runoff and discharge
controlled effluent flows to downstream receiving waters. The project
WQMP shall also include an operations and maintenance plan for the
prescribed Low Impact Development (LID) features, structural BMPs, and
any hydromodification controls to ensure their long term performance. A
funding mechanism for operations and maintenance shall also be
prescribed.
With implementation of Mitigation Measure HYD-lb, impacts during operation would be
less than significant.
Santiago Creek Dam was last inspected on May 3, 2018, according to the United States Army
Corps of Engineers (USACE) National Inventory of Dams. Its condition assessment rating is
"satisfactory" and its hazard potential rating is "extremely high." Likewise, Villa Park Dam's
condition assessment rating is"satisfactory"and its hazard potential rating is "extremely high." It
was last inspected on February 21, 2018, according to the USACE website. According to the
California Division of Safety of Dams (DSOD) website, a "satisfactory" condition assessment
indicates that no existing or potential dam safety deficiencies are recognized. Acceptable
performance is expected under all loading conditions (static, hydrologic, and seismic) in
accordance with applicable regulatory criteria or tolerable risk guidelines. Hazard classifications
are based on the size of the reservoir and the number of people who live downstream of a dam,not
the actual conditions of the dam or its critical structures. Therefore, the condition assessment is a
better indicator of potential dam deficiencies with the potential to cause downstream flooding.
Pursuant to the California Water Code, dam irispections at Santiago Creek Dam and Villa Park
Dam are conducted by the DSOD at least once per year pursuant to laws,regulations,and practices
of DSOD to ensure the dam is safe,performing as intended,and is not developing problems.DSOD
also reviews the stability of dams and their major appurtenances in light of improved design
approaches and requirements, as well as new findings regarding earthquake hazards and
hydrologic estimates in California.
The DSOD evaluation program is an ongoing screening process of spillways and other
appurtenances at dams throughout the State. Subsequent to the assessment,DSOD works with dam
owners to expedite development of required assessments and restore known areas of deficiency.
Roughly, a third of DSOD inspections result in in-depth instrumentation reviews. In 2017, the
Santiago Creek Dam required an extra spillway assessment in addition to its standard yeaxly
inspection. The evaluation required by DSOD includes assessment of:
• The spillway's design and construction and geologic attributes while concurrently
reviewing the dam owner's maintenance and inspection program;
082654\10786529v1 [�5
City of Orange Trails at Santiago Creek Project
• The spillway's historical performance;
• Any previous spillway repairs.
To conduct the spillway assessment required by DSOD, the owners of Santiago Dam, the Irvine
Ranch Water District(IRWD)and Serrano Water District,submitted a workplan to DSOD in 2017.
The assessment is in-progress.
In addition to the DSOD inspections,IRWD and Serrano Water District inspect the Santiago Creek
Dam and spillway quarterly with a dam safety consultant and bi-annually with the DSOD. In
addition, IRWD staff visually inspects the dam daily and has caretakers that live on-site and
observe the dam daily. Measurements of drain flows,monitoring wells, and piezometers are taken
monthly. Piezometers are used to measure groundwater and other fluid pressure levels. Dam crest
survey markers give IRWD the ability to measure horizontal or vertical movement of the dam,
which are measured by a licensed surveyor annually to evaluate any adverse trends.With the above
safety precautions in place and given the condition rating of both dams as "satisfactory," dam
failure is not anticipated.
In terms of City policy, the General Plan identifies areas downstream of the Santiago Creek and
Villa Park dams for potential flooding in the event of a catastrophic dam failure (General Plan,
page PS-4). The General Plan characterizes such an event as "unlikely" (page PS-4) and does not
prohibit or limit development in these areas.
Maps compiled for potential dam failures are created, in part, in order to implement emergency
procedures required under Section 8589.5 of the California Government Code.The Orange County
Operational Area Emergency Action Plan Dams/Reservoir Failure Annex indicates that it would
take a dam failure flood wave 105 minutes to reach the project site from Villa Park Dam and 255
minutes from Santiago Dam. Emergency procedures that the County and the City have established
to protect lives and property in the event of a dam failure would allow persons to be evacuated in
the event of a failure of Santiago Creek Dam or Villa Park Dam. Emergency response times for
the City of Orange Police Department vary on average from 4 to 7 minutes and emergency
response times for the City of Orange Fire Department are, on average, 3 minutes, 45 seconds;
therefore flood flows would move at rates which would allow emergency procedures to be
implemented and persons to be evacuated. Staff inembers at both dams are trained in operation of
the facilities and would be able to identify and respond to indications of adverse conditions;
therefore, initial alerting of a dam failure would occur quickly. Furthermore, the Orange County
Sheriff's Department oversees the County's Emergency Operations Center and has modeled dam
failure scenarios for both Villa Park Dam and Santiago Dam based on Federal Emergency
Management Agency (FEMA) Flood Maps (RDEIR Section 3.9, Hydrology and Water Quality,
Exhibit 3.9-4). The Sheriff's Department has developed plans to provide timely notification to
affected parties and implement an orderly evacuation in the event dam failure indications are
observed, such as the AIertOC mass notification system that provides time-sensitive messages to
residents from the City or County in which they live or work. Every method known to warn the
public of an impending dam failure,including the following systems,would be utilized by the City
and County in the event of a dam failure at Villa Park Dam or Santiago Dam:
• Emergency Alerting System(EAS) on the AM/FM radio
082654\10786529v1 �}(
City of Orange Trails at Santiago Creek Project
• AIertOC (Service is available to residents and non-residents to receive time-sensitive
information in the event of a natural disaster or emergency. Residents should register for
this service)
• Police and Fire sirens
• Police helicopter loudspeakers
• Door-to-door canvassingl
Moreover,the General Plan requires that appropriate flood control measures be implemented along
Santiago Creek and throughout the planning area to reduce the risks from localized flooding and
the General Plan EIR implements the following two mitigation measures specific to flooding that
would reduce potential impacts throughout the City:
General Plan EIR Section 5.8, Hydrology and Water Quality, Mitigation Measure 5.8-1
Support efforts by the OCFCD to regularly maintain flood control channels and structures
owned by the OCFCD, and to complete necessary repairs in a timely manner. Work with
the OCFCD and USACE to identify new flood control improvements and establish
installation programs for improvements as needed. Work with the OCFCD to identify
opportunities to enhance the natural qualities of Santiago Creek to protect habitat and
reintroduce native plants, animals, and fish. (Implementation Program V-11; Responsible
Party—Community Development Department, Community Services Department, Public
Works Development; Timeframe—Ongoing) (General Plan EIR, page 5.8-25-5.8-26).
General Plan EIR Section 5.8, Hydrology and Water Quality, Mitigation Measure 5.8-2
Continue to inspect storm drains,remove debris from catch basins as needed, and evaluate
and monitor water storage facilities to determine if they pose a water inundation hazard.
(Implementation Program I-32; Responsible Party—Public Works Development;
Timeframe—Ongoing) (General Plan EIR, page 5.8-25.)
As discussed in the City's General Plan EIR,Citywide flood prevention methods,such as provision
of detention basins and on-site stormwater drainage, reduce runoff into the City's drainage
facilities and provide adequate drainage for new developments. The City minimizes flood-related
risks and hazards in the event of dam or reservoir failure by encouraging the County's Flood
Control District to continue proper inspection of storm drains, ensuring maintenance of the flood
control facilities, and preventing earthquake damage. In addition, the City monitors water storage
facilities to determine potential inundation hazards to surrounding properties (General Plan, page
PS-19.).
In addition to the emergency procedures, General Plan policies, and mitigation measures listed
above, RDEIR Section 3.9, Hydrology and Water Quality, Mitigation Measure HYD-5, requires
the applicant to prepare and implement an Emergency Evacuation Plan, which would identify
specific procedures for the safe and orderly evacuation of the project. The plan would specifically
� Enjoy Orange County, Dams in Orange County. Website: https://enjoyorangecounty.com/dams-in-orange-countySite accessed March 6,
2019.
082654\]0786529v 1 q.'�
City of Orange Trails at Santiago Creek Project
require the streets to be identified with clear and visible signage and, if necessary, wayfinding
signage to identify exit points.
MM HYD-5: Prior to issuance of the first certificate of occupancy, the applicant shall
retain a qualified consultant to prepaxe and implement an Emergency
Evacuation Plan.The plan shall identify the various types of emergency that
could affect the proposed project (e:g., dam failure, earthquake, flooding,
etc.) and identify procedures for the safe and orderly evacuation of the
project.The plan shall require that streets be identified with clear and visible
signage and, if necessary, wayfinding signage be provided to identify exit
points.
Given the fact that the (1) Villa Park Dam and the Santiago Creek Dam are listed as having
"satisfactory"conditions,(2)the project is consistent with applicable General Plan policies related
to flood prevention, (3) time durations associated with potential dam failures would provide
sufficient response times and resources to evacuate the project site in the event of a dam failure,
and (4) Mitigation Measure HYD-5 would be required to reduce impacts related to flooding,
impacts associated with dam failure are properly considered less than significant.
8. Noise
Impact Thresholds:
Threshold NOI-1: Would the project result in exposure of persons to or generation of
noise levels in excess of standards established in the local general
plan or noise ordinance, or applicable standards of other agencies.
Threshold NOI-4: Would the project result in a substantial temporary increase in
ambient noise Zevels in the project vicinity?
Description of the Impacts: The project would take up to 12 months to construct.
Construction could potentially generate noise that would affect nearby sensitive receptors.
Findin�: The City makes Finding 1 that changes or alterations have been required in, or
incorporated into the Project which avoid or substantially lessen the significant
environxnental effect described above and identified in the Final EIR.
Facts in Support of Findin�: The highest construction-related noise levels would be
generated during ground clearing, excavation, and grading. Noise levels would be up to
90 dBA at a distance of 50 feet. The closest sensitive receptors would be exposed to noise
levels of up to 84 dBA intermittently during construction. The City's Noise Ordinance
requires construction to be between the hours of 7:00 AM and 8:00 PM Monday through
Saturday; construction is prohibited on Sundays and federal holidays. Nonetheless,
impacts related to construction noise are potentially significant and Mitigation Measure
NOI-1 a would be required.
With incorporation of MM NOI-la, short term construction noise impacts would be less
than significant.
082654\10786529v1 48
City of Orange Trails at Santiago Creek Project
Traffic noise levels were analyzed for five intersections near the site. In year 2022, noise
from traffic at nearby sensitive receptors would be 0.1 dBA CNEL. No sensitive receptors
would be exposed to the City's residential or school noise standard of 65 dBA CNEL. In
2040, noise levels at sensitive receptors would range up to 0.1 dBA CNEL. No analyzed
sensitive receptors would be exposed to noise in excess of 65 dBA CNEL.
For the majority of future residents, traffic noise levels would attenuate to below 60 dBA
CNEL and therefore, interior noise levels would be reduced below the interior residential
living space standard of 45 dBA CNEL. For homes closer than 164 feet from the centerline
of East Santiago Canyon Road,interior noise standards could exceed 45 dBA.Noise levels
from off-site stationary equipment would not exceed the City's standard of 55 dBA Leq
and 70 dBA Lmax between 7:00 AM and 10:00 PM or exceed 50 dBA Leq or 65 dBA
Lmax between 10:00 PM and 7:00 AM at the exterior farade of nearby sensitive receptors.
Likewise, noise levels from community center activities would not exceed City standards
and noise levels from parking lot activities would not exceed City standards.
MM NOI-la To reduce potential construction noise impacts,the following multi-
part mitigation measure shall be implemented for the proposed
proj ect:
• The construction contractor shall ensure that all equipment
driven by internal combustion engines shall be equipped
with mufflers, which are in good condition and appropriate
for the equipment.
• The construction contractor shall locate stationary noise-
generating equipment as far as possible from sensitive
receptors when sensitive receptors adjoin or are near a
. construction project area. In addition, the project contractor
shall place such stationary construction equipment so that
emitted noise is directed away from sensitive receptors
nearest the project site.
• The construction contractor shall ensure that unnecessary
idling of internal combustion engines (i.e., idling in excess
of 5 minutes) is prohibited.
• The construction contractor shall utilize "quiet" models of
air compressors and other stationary noise sources where
technology exists.
• The construction contractor shall, to the maximum extent
practical,locate on-site equipment staging areas to maximize
the distance between construction-related noise sources and
noise-sensitive receptors nearest the project site during all
project construction.
082654U 0786529v 1 49
City of Orange Trails at Santiago Creek Project
• The construction contractor shall ensure that the
construction staging areas shall be located to create the
greatest feasible distance between the staging area and noise-
sensitive receptors nearest the project site.
• The construction contractor shall designate a noise
disturbance coordinator who would be responsible for
responding to any local complaints about construction noise.
The disturbance coordinator would determine the cause of
the noise complaints (starting too early, bad muffler, etc.)
and establishment reasonable measures necessary to correct
the problem. The construction contractor shall visibly post a
telephone number for the disturbance coordinator at the
construction site.
• All on-site construction activities, including deliveries and
engine warm-up, shall be restricted to the hours between
7:00 a.m. and 8:00 p.m. Monday through Saturday.
Construction,except emergency work,shall not be permitted
on Sunday or federal holidays.
MM NOI-lb: To reduce potential future on-site exterior traffic noise
impacts at on-site receptors adjacent to East Santiago
Canyon Road, the following multi-part mitigation measure
shall be implemented for the proposed project:
• Based on SoundPlan model runs, a 6-foot high noise barrier,
relative to the receptor elevation, is required to comply with
the City's exterior noise standard for proposed residential
uses located adjacent to Santiago Canyon Road. The
calculated noise contours are shown in Exhibit 3.12-7. In
order to meet the City's exterior noise standard for
community uses,a 4-foot high berm would be required along
Santiago Canyon Road; or
• A minimum setback distance of 164 feet from the centerline
of East Santiago Canyon Road shall be incorporated into the
. design feature. The first row of residential uses constructed
164 feet from the centerline will also have front yards facing
East Santiago Canyon Road.
MM NOI-lc: To reduce potential future on-site interior traffic noise
impacts at on-site receptors adjacent to East Santiago
Canyon Road, the following multi-part mitigation measure
shall be implemented for the proposed project:
082654\10786529v1 50
City of Orange Trails at Santiago Creek Project
• All proposed residential units located within 560 feet of the
centerline of East Santiago Canyon Road shall include an
alternate form of ventilation, such as an air conditioning
system, in order to ensure that windows can remain closed
for a prolonged period of time. The building plans approved
by the County shall reflect this requirement.
• All second story habitable rooms of proposed residential
units located within 164 feet of the centerline of East
Santiago Canyon Road shall include STC 30 rated windows
in facades that would be parallel and perpendicular to East
Santiago Canyon Road; or
• Upon completion of the architectural plans, a detailed
acoustical study shall be prepared by a qualified noise
analyst that analyzes the interior noise levels.of tlie proposed
residential units and provides design features to reduce the
interior noise levels to within the 45 dBA CNEL standard.
With implementation of mitigation, impacts would be less than significant.
9. Public Services
Impact Threshold
Threshold PS-1: Would the project result in a need for new or expanded fire
protection facilities?
Description of the Impacts: The project would add 393 new residents to the City's
population. The project would cause a substantial increase in calls for service compared
to the existing use of the site.
Findin�: The City makes Finding 1 that changes or alterations have been required in, or
incorporated into the Project which avoid or substantially lessen the significanf
environmental effect described above and identified in the Final EIR
Facts in Support of Finding: The project would generate approximately 393 new residents
in the City. The closest fire station is 1.75 miles from the project site. The response time
would be approximately 4 minutes, 12 seconds, compared to the average response time of
3 minutes, 45 seconds. The project would take vehicular access from E. Santiago Canyon
Road via a driveway aligned with Nicky Way. Mitigation measure HAZ-5 requires the
Applicant to demonstrate compliance with all Fire Code emergency access requirements
prior to issuance of building permits. Mitigation measure HAZ-6 would require the
applicant to prepare a Fuel Modification Plan and submit it to the City to review and
approval prior to issuance of building permits. With implementation of mitigation,impacts
would be less than significant. The project would not directly create a need to construct
new or expanded fire protection or emergency medical service facilities.
082654\10786529v1 5 1
City of Orange Trails at Santiago Creek Project
10. Transportation and Traffic
Impact Threshold
Threshold TRANS-5: Would the pNoject substantially increase hazards due to a design
feature (e.g., sharp curves or dangerous intersections) or
incompatible uses (e.g.,farm equipment)?
Description of Impacts: Access to the project site will be via a signalized driveway
opposite Nicky Way, along E. Santiago Canyon Road, which could potentially result in
unsafe access to the site.
Fi•ndin�: The City makes Finding 1 that changes or alterations have been required in, or
incorporated into the Project which avoid or substantially lessen the significant
environmental effect described above and identified in the Final EIR.
Facts in Support of Findin�: The proposed project driveway is forecast to operate at
acceptable level of service D or better during the AM and PM peak hours for all forecasted
traffic conditions. Project access will therefore be adequate and safe. Mitigation Measure
TRANS-5 requires the Applicant to improve the project driveway/Nicky Way at East
Santiago Canyon Road, along with Cannon Street at Taft Avenue, to allow for safe and
efficient access to the project site prior to issuance of the first certificate of occupancy.
MM TRANS-5: Prior to issuance of the first certificate of occupancy, the City of
Orange shall verify that the Applicant has made improvements to
traffic circulation in the area and ensured that adequate ingress and
egress to the project site is provided, as follows:
• Project Driveway/Nicky Way at East Santiago Canyon
Road:
- Construct the north leg of the intersection and provide one
inbound lane and two outbound lanes(i.e.,one dedicated left
. turn lane and one shared through/right-turn lane).
- Widen and/or restripe East Santiago Canyon Road to
provide one eastbound left-turn lane, one westbound right-
turn lane and a third westbound through-lane.
- A five-phase signal has been installed with protected left-
turn phasing in the east-west direction and permissive
phasing in the north-south direction.
• Cannon Street at Taft Avenue:
- Widen and/or restripe Canon Street to provide a third
northbound through lane. The third northbound through lane
082654\10786529v 1 52
City of Orange Trails at Santiago Creek Project
on Cannon Street begins after East Santiago Canyon Road
and does not extend through Serrano Avenue.
Impacts would be less than significant with implementation of mitigation measure TRANS-5.
D. ENVIRONMENTAL IMPACTS DETERMINED TO BE SIGNIFICANT
AND UNAVOIDABLE AFTER MITIGATION
1. Air Quality
Impact Thresholds
Threshold AIR-1: Would the project conflict with or obstruct implementation of the
applicable air quality plan?
ThNeshold AIR-2: Would the project violate any air quality standard or contribute
substantially to an existing or projected air quality violation?
Threshold AIR-3: Would the project result in a cumulatively considerable net increase
of any criteria pollutant for which the project region is non-
attainment under an applicable federal or State ambient air quality
standard?
Description of the Impact: The proj ect would have a significant impact on air quality under
CEQA.
Fi•nding: The City makes a finding that changes or alterations have been required in, or
incorporated into the Project which avoid or substantially lessen the significant
environmental effect described above and identified in the Final EIR. However, the City
has determined that while the above-described impacts can be partially mitigated by the
mitigation measures described below, these impacts cannot be mitigated to a less than
significant level. There are no other feasible mitigation measures or alternatives that would
reduce this impact to an acceptable level. Therefore, the City hereby also makes a finding
which will require the adoption of a Statement of Overriding Considerations as a condition
for Project approval.
Facts in Support of Findin�: There are two key indicators for whether or not a project
conflicts with, or obstructs implementation of an applicable air quality plan: (1) whether
the project will not result in an increase in the frequency or severity of existing air quality
violations or cause or contribute to new violations,or delay timely attainment of air quality
standards or the interim emission reductions specified in the AQMP; and(2) According to
Chapter 12 of the SCAQMD CEQA Air Quality Handbook,the purpose of the General Plan
consistency findings is to determine whether a project is inconsistent with the growth
assumptions incorporated into the air quality plan,and thus,whether it would interfere with
the region's ability to comply with federal and California air quality standards.
According to SCAQMD, the project is consistent with the AQMP if the project would not
result in an increase in the frequency or severity of existing air quality violations or cause
082654110786529v 1 5 3
City of Orange Trails at Santiago Creek Project
or contribute to new violations, or delay timely attainment of air quality standards.
Construction related activities associated with the project would result in emissions of NOx
that exceed SCAQMD's thresholds. Therefore, construction would result in potentially
significant impacts.The proj ect would not exceed thresholds for any other criteria pollutant
(VOC, CO, Sox, or particulate matter).
According to Chapter 12 of the SCAQMD CEQA Air Quality Handbook, the purpose of
the General Plan consistency finding is to determine whether a project is inconsistent with
the growth assumptions incorporated into the air quality plan and thus, whether it would
interfere with the region's ability to comply with federal and California air quality
standards.
The City of Orange designates the project site"Low Density Residential,""Resource Area"
and "Open Space." The City of Orange Zoning Ordinance zones the project site "S-G
(Sand and Gravel Extraction)"and"R-1-8 (Single-Family Residentia18,000 square-feet)."
The proposed project involves the development of up to 128 dwelling units on
approximately 40.7 acres within the area designated"Resource Area" and the preservation
of the remaining 68.5 acres (which overlap with the "Resource Area" and "Low Density
Residential" designations) as open space and recreation uses. Accordingly, the applicant
is proposing to change the"Resource Area"designation to a combination of"Low Density
Residential," and "Open Space," and the"Low Density Residential" designation to "Open
Space."
The development of the Air Quality Management Plan(AQMP)is based in part on the land
use general plan determinations of the various cities and counties that constitute the
SoCAB. A project that is consistent with the general plan is considered to be accounted
for in the AQMP. Since the proposed project entitlements would include a General Plan
Amendment that would amend both the East Orange General Plan and Orange Park Acres
Plan to incorporate the Trails at Santiago Creek Specific Plan, the proposed project would
not be consistent with the growth assumptions within the current AQMP. The project
would be potentially significant regarding growth assumptions within the current AQMP.
The proposed project would comply with all applicable rules and regulations of the AQMP.
Because of the nature of the proposed project, which includes earthmoving activity,
SCAQMD Rule 403 applies. Rule 403 governs emissions of fugitive dust during
construction and operation activities. The rule requires that fugitive dust be controlled with
best available control measures so that the presence of such dust does not remain visible in
the atmosphere beyond the property line of the emission source. In addition, SCAQMD
Rule 403 requires implementation of dust suppression techniques to prevent fugitive dust
from creating a nuisance off-site. Compliance with this rule is achieved through
application of standard Best Management Practices (BMPs). These BMPs include
application of water or chemical stabilizers to disturbed soils; covering haul vehicles;
restricting vehicle speeds on unpaved roads to 15 miles per hour; sweeping loose dirt from
paved site access roadways;cessation of construction activity when winds exceed 25 miles
per hour; and establishing a permanent ground cover on finished sites. The project's
compliance with SCAQMD Rule 403 would result in consistency with the applicable
082654\10786529v 1 5[�.
� City of Orange Trails at Santiago Creek Project
� AQMP control measures. As such,emissions from fugitive dust during construction would
� be reduced to less than significant levels.
Because emissions of NOx would exceed thresholds, Mitigation Measure AIR-1 a through
� AIR-lg would be required to reduce construction emissions.
MM AIR-1 a During construction, all equipment shall be maintained in good operating condition
so as to reduce emissions. The construction contractor shall ensure that all
construction equipment is properly serviced and maintained in accordance with the
manufacturer's specifications. Maintenance records shall be available at the
construction site for City verification.
MM AIR-lb All paints and coatings shall meet or exceed performance standards noted in
' SCAQMD Rule 1113. To ensure compliance with SCAQMD Rule 1113, the
following volatile organic compound (VOC) control measures shall be
implemented during architectural coating activities:
a) Use paints with a VOC content of no more than 50 grams per liter for both
interior and exterior coatings.
b) Keep lids closed on all paint containers when not in use to prevent VOC
�
emissions and excessive odors.
c) Use compliant low VOC cleaning solvents to clean paint application
equipment.
, d) Keep all paint and solvent laden rags in sealed containers to prevent VOC
emissions.
MM AIR-lc Prior to the issuance of grading permits for the project, the project applicant shall
include a dust control plan as part of the construction contract standard
specifications. The dust control plan shall include measures to meet the
requirements of SCAQMD Rules 402 and 403. Such basic measures may include
but are not limited to the following:
a) All haul trucks shall be covered prior to leaving the site to prevent dust from
impacting the surrounding areas.
b) Moisten soil each day prior to commencing grading to depth of soil cut.
c) Water exposed surfaces at least three times a day under calm conditions,
and as often as needed on windy days or during very dry weather in order
to maintain a surface crust and minimize the release of visible emissions
from the construction site.
d) Treat any area that will be exposed for extended periods with a soil
conditioner to stabilize soil or temporarily plant with vegetation.
082654\10786529v 1 5 5
City of Orange Trails at Santiago Creek Project
e) Use street sweepers that comply with SCAQMD Rules 1186 and 1186.1.
� All contractors shall turn off all construction equipment and delivery
vehicles when not in use, or limit on-site idling to no more than 5 minutes
in any one hour.
g) On-site electrical hook ups to a power grid shall be provided for electric
� construction tools including saws, drills, and compressors, where feasible,
to reduce the need for diesel powered electric generators.
h) Traffic speeds on all unpaved roads to be reduced to 15 miles per hour or
less.
i) Sweep streets at the end of the day if visible soil is carried onto adjacent
public paved roads.
MM AIR-ld Prior to and during grading activities,the project applicant shall comply with South
Coast Air Quality Management District Rule 403 as follows:
• The applicant shall submit a fully executed Large Operation Notification
(Form 403 N) to the SCQAMD Executive Officer within 7 days of
qualifying as a large operation. The form shall include the name(s),
address(es), and phone number(s) of the person(s) responsible for the
submittal, and a description of the operation(s), including a map depicting
the location of the site.
• Maintain daily records to document the specific dust control actions taken,
maintain such records for a period of not less than three years; and make
such records available to the Executive Officer upon request
• Install and maintain project signage with project contact signage that meets
the minimum standards of the Rule 403 Implementation Handbook,prior to
initiating any earthmoving activities
• Identify a dust control supervisor that(1)is employed by or contracted with
the property owner or developer; (2)is on the site or available on-site within
30 minutes during working hours; (3) has the authority to expeditiously
employ sufficient dust mitigation measures to ensure compliance with all
Rule requirements; (4) has completed the AQMD Fugitive Dust Control
Class and has been issued a valid Certificate of Completion for the class;
and (5)will notify the Executive Officer in writing within 30 days after the
site no longer qualifies as a large operation.
MM AIR-le Prior to and during grading activities, the project applicant shall implement the
following dust control measures for large operations, as applicable, pursuant to
South Coast Air Quality Management District Rule 403:
082654\10786529v1 56
City of Orange Trails at Santiago Creek Project
Earth Moving (except construction cutting and filling areas, and mining
operations)
1 a. Maintain soil moisture content at a minimum of 12 percent, as determined
by ASTM method D-2216, or other equivalent method approved by the
� Executive Officer, the California Air Resources Board, and the U.S. EPA.
Two soil moisture evaluations must be conducted during the first three
hours of active operations during a calendar day, and two such evaluations
� each subsequent four-hour period of active operations; or
' la-1. For any earth-moving which is more than 100 feet from all property lines,
conduct watering as necessary to prevent visible dust emissions from
exceeding 100 feet in length in any direction.
Earth Moving-Construction Fill Areas
lb. Maintain soil moisture content at a minimum of 12 percent, as determined
' by ASTM method D-2216, or other equivalent method approved by the
Executive Officer, the California Air Resources Board, and the U.S. EPA.
For areas which have an optimum moisture content for compaction of less
than 12 percent, as determined by ASTM Method 1557 or other equivalent
method approved by the Executive Officer and the California Air Resources
� Board and the U.S. EPA, complete the compaction process as expeditiously
as possible after achieving at least 70 percent of the optimum soil moisture
content. Two soil moisture evaluations must be conducted during the first
three hours of active operations during a calendar day, and two such
evaluations during each subsequent four-hour period of active operations.
Earth Moving—Construction Cut Areas and Mining Operations
, 1 c. Conduct watering as necessary to prevent visible emissions from extending
more than 100 feet beyond the active cut or mining area unless the area is
inaccessible to watering vehicles due to slope conditions or other safety
factors.
Disturbed Surface Areas—Completed Grading Areas
2a/b. Apply dust suppression in sufficient quantity and frequency to maintain a
stabilized surface. Any areas which cannot be stabilized, as evidenced by
wind driven fugitive dust must have an application of water at least twice
per day to at least 80 percent of the unstabilized area.
2c. Apply chemical stabilizers within five working days of grading completion;
OR
2d. Take actions (3a) or (3c) specified for inactive disturbed surface areas.
Inactive Disturbed Surface Areas
082654\10786529v1 5']
City of Orange Trails at Santiago Creek Project
3a. Apply water to at least 80 percent of all inactive disturbed surface areas on
a daily basis when there is evidence of wind driven fugitive dust, excluding
any areas which are inaccessible to watering vehicles due to excessive slope
or other safety conditions; or
3b. Apply dust suppressants in sufficient quantity and frequency to maintain a
stabilized surface; or
3c. Establish a vegetative ground cover within 21 days after active operations
have ceased. Ground cover must be of sufficient density to expose less than
30 percent of unstabilized ground within 90 days of planting,and at all times
thereafter; OR
3d. Utilize any combination of control actions (3a), (3b), and (3c) such that, in
total,these actions apply to all inactive disturbed surface areas.
Unpaved Roads
4a. Water all roads used for any vehicular traffic at least once per every two
hours of active operations [3 times per normal8-hour work day]; or
4b. Water all roads used for any vehicular traffic once daily and restrict vehicle
speeds to 15 miles per hour; or
4c. Apply a chemical stabilizer to all unpaved road surfaces in sufficient
quantity and frequency to maintain a stabilized surface.
Open Storage Piles
Sa. Apply chemical stabilizers; or
Sb. Apply water to at least 80 percent of the surface area of all open storage ,
piles on a daily basis when there is evidence of wind driven fugitive dust;
or
Sc. Install temporary coverings; or
Sd. Install a three-sided enclosure with walls with no more than 50 percent
porosity which extend, at a minimum, to the top of the pile. This option
may only be used at aggregate-related plants or at cement manufacturing
facilities.
All Categories
6a. Any other control measures approved by the Executive Officer and the U.S.
EPA as equivalent to the methods specified in this mitigation measure may
be used.
0826�4\10786529v1 5 g
City of Orange Trails at Santiago Creek Project
MM AIR-lf Prior to and during grading activities, the project applicant shall implement the
following contingency control measures for large operations, as applicable,
pursuant to South Coast Air Quality Management District Rule 403:
I� Earth Moving
�
lA. Cease all active operations; or
2A. Apply water to soil not more than 15 minutes prior to moving such soil.
OB. On the last day of active operations prior to a weekend,holiday,or any other
period when active operations will not occur for not more than four
consecutive days: apply water with a mixture of chemical stabilizer diluted
to not less than 1/20 of the concentration required to maintain a stabilized
surface for a period of six months; OR
, 1B. Apply chemical stabilizers prior to wind event; or
2B. Apply water to all unstabilized disturbed areas 3 times per day. If there is
� any evidence of wind driven fugitive dust, watering frequency is increased
to a minimum of four times per day; or
3B. Establish a vegetative ground cover within 21 days after active operations
have ceased. Ground cover must be of sufficient density to expose less than
30 percent of unstabilized ground within 90 days of planting,and at all times
thereafter; or
4B. Utilize any combination of control actions (1B), (2B), and (3B) such that,
� in total, these actions apply to all disturbed surface areas.
Unpaved Roads
' 1 C. Apply chemical stabilizers prior to wind event; or
; 2C. Apply water twice per hour during active operation; or
3C. Stop all vehicular traffic.
Open Storage Piles
1D. Apply water twice per hour; or �
2D. Install temporary coverings.
' Paved Road Track Out
1 E. Cover all haul vehicles; or
082654\10786529v 1 5 9
City of Orange Trails at Santiago Creek Project
2E. Comply with the vehicle freeboard requirements of Section 23114 of the
California Vehicle Code for both public and private roads.
All Categories
1 F. Any other control measures approved by the Executive Officer and the U.S.
EPA as equivalent to the methods specified in this mitigation measure may
be used.
MM AIR-lg During construction activities, all off-road equipment with engines greater than 50
horsepower shall meet either EPA or ARB Tier IV Final off-road emission
standards. The construction contractor shall maintain records concerning its efforts
to comply with this requirement, including equipment lists. Off-road equipment
descriptions and information may include but are not limited to equipment type,
equipment manufacturer, equipment identification number, engine model year,
engine certification(Tier rating), horsepower, and engine serial number.
If engines that comply with Tier IV Final off-road emission standards are not
commercially available,then the construction contractor shall use the next cleanest
piece of off-road equipment (e.g., Tier IV Interim) available. For purposes of this
mitigation measure, "commercially available" shall mean the availability of Tier
IV Final engines taking into consideration factors such as(i)critical-path timing of
construction; and (ii) geographic proximity to the project site of equipment. The
contractor can maintain records for equipment that is not commercially available
by providing letters from at least two rental companies for each piece of off-road
equipment where the Tier IV Final engine is not available.
With implementation of mitigation,construction emissions would continue to exceed SCAQMD's
regional significance thresholds. There are no additional feasible mitigation measures available to
reduce emissions. The project's regional emissions of NOx would continue to exceed applicable
SCAQMD regional construction significance thresholds after implementation of mitigation.
Construction would generate a maximum of 199.47 pounds of NOx per day after implementation
of mitigation. This exceeds the threshold of 100 pounds per day. Impacts are significant and
unavoidable and require a statement of overriding consideration.
The project's construction-related emissions would exceed the applicable SCAQMD significance
threshold for NOX with implementation of all feasible mitigation measures. The thresholds of
significance represent the allowable amount of emissions each project can generate without
generating a cumulatively considerable contribution to regional air quality impacts. If an area is
in non-attainment for a criteria pollutant, then the background concentration of that pollutant has
historically exceeded the ambient air quality standard. It follows that if a project exceeds the
regional thresholds for that non-attainment pollutant, then it would result in a cumulatively
considerable net increase of that pollutant and result in a significant cumulative impact. As such,
cumulative construction impacts (Impact AIR-3) axe significant and unavoidable and require a
statement of overriding consideration.
082654110786529v1 (�
. i . ... :": :' . . :'. " � :.. . ' :.. . ' .
. . . . . . . . ., . .. .. . . .
. .. . . . .. .. . . . . . . . _ .. t . ' . .. . ... ' .
. .. . . . .. .. . . . . .
... . . . . .;.. .
City of Orange Trails:at Santiago Creek:Project
The region is non-attainment for the federal: and state ozone standards, the.state:PM 10 standards;: :
_
arid the federal:and state PM2,5 :standards. . Therefore; a project that would not exceed the
SCAQNID ;tliresholds of sigriificance on a project=level would also not result in a curiiulatively
: considerable contribution to these regio.rial:air quality impacts. The impacts from the project.
would, therefore, be cumulatively.less tliari signifcant duririg project operations and signifcant
and unavo.idable during projectcoristruction.
Opera_tional emissioris:generated by area;eriergy,and mobile sources would result in the follow'ing
, . .
emissions:
_ . . _
_
� i. .. Mass.Daily Emissions.(pounds per day). I
�. 1---- -�--i
Category. ': VOC �' :NOx CO: SO� .._...T_ PM�o �� PMz.s ;
�._- - --I,-�- =� �^�_ . --__.- _. ----1
^..
, � ;
; ,rArea___- � 6.15 ; 0.12 � 1:0_66 � 0.00 � : 0.06 0.06
,
----;----.__._-;----- , -----;---- . .
, J , - ---� �_.—,
9Y I �
0.07 . j 0.07 �
'Ener ' 0.10 i 0.84 0.36 0.01 '
, ..
.._�--- �.---___ -__y---- . - ---�
, . ,. _---�
!Mobile - ^-^� 0.80 :: :; 3.31 10:98 � 0.04 �--_3.96 ; 1.08: ;
�-- -= - --- , ;
------�, ------r. --r--- i � ^�
�Total Emissions I 7.05 4.27 ; 21.99 i 0.05 ' , 1:20 �
' �= -- -- '--------�-_-----�---�------- �---
4.08 . ..;
!SCAQMD, i i . T -r- ;-�- ---, —j--------��
; :
,Significance ; ; ! �� ! . � i
', 55. : � 55 i 550 j 150 . .::1. 150 � . 55 �
Thresholds '
(Ibs%day) , � ; , �
� i.:T_.�-----------=-_,_-::�----------.�__:-. :.,;_.__----;------------- --- ----.---.---------
� _
,
i � �
!Exceed � I � ' No No . �
,
,Threshold? ' '
No_ No No No .
, i . ..
�-._.___________------_..,-------._...---------- ------_-------�--------�__._--------------
�N.otes: ;
i
'VOC =Volatile Organic Coi�npounds NOx= nitrogen oxides CO = carbon . ;
;monoxide : PM,o = particulate:matter with an aerodynamic resistance:
:diameter of 10 micrometers or less;,PMz.s= particulate.matter with an aerodynamic ! -
,
;resistance diameter of 2.5 micrometers '
;Source; CaIEEMod and FCS 2018, see Appendix F-For each so.urce; the maximum +
;emissions between summer and winter.are shown. �,
As shown in the table,emissions would not exceed thresholds. Therefore;the project's operafional
emissions wouFd result.in_less tHari significant impacts. �
� 2. Transportation and Traffic
Impact Threshoid;
Threshold TRANS-2 :Would the project conflict with an applicable plan, ordinance or
policy establishing measures of effectiveness for the perfomiance of
the circulatiori system under Year 2022 Traffic Conditions?
Description of the Impact: The project would liave a significant impact:on traffic under
CEQA.
082654\10786529v 1 C1
City of Orange Trails at Santiago Creek Project
Findin�: The City makes a finding that changes or alterations have been required in, or
incorporated into the Project which avoid or substantially lessen the significant
environmental effect described above and identified in the Final EIR. However, the City
has determined that while the above-described impact can be partially mitigated by the
mitigation measures described below, this impact cannot be mitigated to a less than
significant level. There are no other feasible mitigation measures or alternatives that would
reduce this impact to an acceptable level. Therefore, the City hereby also makes a finding
which will require the adoption of a Statement of Overriding Considerations as a condition
for Project approval.
Facts in Support of Finding: Ten key study area intersections and 17 key roadway
segments were analyzed under Year 2022 traffic conditions.
Intersection Year 2022 With Project Traffic Conditions
Year 2022 With Project Tra�c Conditions (Without Sand and Gravel Credit)
Review of Columns (3) and (4) of Table 3.16-16 in the Final EIR indicates that traffic
associated with the proposed project "Without Sand and Gravel Credit" will significantly
impact one of the 10 key study intersections, when compared to the LOS standards and
significant impact criteria specified in the TIA. Although the intersections of Cannon
Street/Serrano Avenue and Cannon Street/Taft Avenue are forecast to operate at
unacceptable LOS E or LOS F during the AM and/or PM peak-hours with the addition of
project traffic, the proposed project "Without Sand and Gravel Credit" is expected to add
less than 0.010 to the ICU value. The remaining seven key study intersections and the
proposed project driveway are forecast to continue to operate at an acceptable LOS with
the addition of project generated traffic in the Year 2022 "Without Sand and Gravel
Credit." The location significantly impacted by the proposed project in the Year 2022 is
as shown in Row 5 of Table 3.16-16 of the Final EIR. As shown in Column (5), the
implementation of improvements at the impacted key study intersections completely
offsets the impact of project traffic "Without Sand and Gravel Credit" and the key study
intersection is forecast to operate at an acceptable LOS during the AM and PM peak-hours.
Appendix C and D presents the Year 2022 With Project ICU/LOS calculations for the 10
key study intersections and the proposed project driveway "Without Sand and Gravel
Credit."
Year 2022 With Project Tra�c Conditions (YVith Sand and Gravel Credit)
Review of Columns (3) and (4) of Table 3.16-17 of the Final EIR indicates that traffic
associated with the proposed project "With Sand and Gravel Credit" will significantly
impact one of the 10 key study intersections, when compared to the LOS standards and
significant impact criteria specified in the TIA. Although the intersections of Cannon
Street/Serrano Avenue and Cannon Street/Taft Avenue are forecast to operate at
unacceptable LOS E or LOS F during the AM and/or PM peak-hours with the addition of
project traffic,the proposed project"With Sand and Gravel Credit"is expected to add less
than 0.010 to the ICU value. The remaining seven key study intersections and the proposed
project driveway are forecast to continue to operate at an acceptable LOS with the addition
082654\10786529v 1 C2
City of Orange Trails at Santiago Creek Project
of project generated traffic in the Year 2022 "With Sand and Gravel Credit." The location
significantly impacted by the proposed project in the Year 2022 is as shown in Row 5 of
Table 3.16-17.
As shown in Column (5), the implementation of improvements at the impacted key study
intersections completely offsets the impact of proj ect traffic"With Sand and Gravel Credit"
and the key study intersection is forecast to operate at an acceptable LOS during the AM
and PM peak-hours. Appendix C and D presents the Year 2022 With Project ICU/LOS
calculations for the 10 key study intersections and the proposed project driveway "With
Sand and Gravel Credit."
Roadway Segments Year 2022 Without Project Traffic Conditions
�� Year 2022 Without Project Traffic Conditions (Without Sand and Gravel Credit)
I An analysis of future (Year 2022) cumulative traffic conditions "Without Sand and Gravel
Credit" indicates that with the addition of ambient trafFc growth and cumulative project
traffic, two of the 17 key roadway segments are forecast to operate at unacceptable levels
of service. Roadway Segment B (Cannon Street between Serrano Avenue and Taft
Avenue) and Roadway Segment C(Cannon Street between Taft Avenue and East Santiago
Canyon Road)are forecast to operate at unacceptable LOS E and/or LOS F on a daily basis
in the Year 2022. The remaining 15 key roadway segments are forecast to continue to
operate at acceptable levels of service on a daily basis with the addition of ambient traffic
growth and cumulative project traffic "Without Sand and Gravel Credit."
Year 2022 Withozct Project Traffic Conditions (With Sand and Gravel Credit)
An analysis of future (Year 2022) cumulative traffic conditions "With Sand and Gravel
Credit" indicates that with the addition of ambient traffic growth and cumulative project
traffic, two of the 17 key roadway segments are forecast to operate at unacceptable levels
of service. Roadway Segment B (Cannon Street between Serrano Avenue and Taft
Avenue) and Roadway Segment C (Cannon Street between Taft Avenue and East Santiago
Canyon Road)are forecast to operate at unacceptable LOS E and/or LOS F on a daily basis
in the Year 2022. The remaining 15 key roadway segments are forecast to continue to
operate at acceptable levels of service on a daily basis with the addition of ambient traffic
growth and cumulative project traffic "With Sand and Gravel Credit."
Year 2022 With Project Traffic Conditions
Year 2022 With PYoject Trafftc Conditions (Without Sand and Gravel Credit)
Review of Column(5) of Table 3.16-18 indicates that traffic associated with the proposed
project"Without Sand and Gravel Credit"will not significantly impact any of the 17 key
roadway segments, when compared to the LOS standards and significant impact criteria
specified in the TIA. Although Roadway Segment B (Cannon Street between Serrano
Avenue and Taft Avenue) is forecast to operate at unacceptable LOS F on a daily basis in
the Year 2022 without project traffic, the level of service for this key roadway segment
improves to LOS E with the proposed project "Without Sand and Gravel Credit" (with
082654\10786529v1 63
. .
-
..
_
City of Orange : Trails at:Santiago Creek Pro�ect
inclusion of tlie project-specific improvements). Although Roadway Segment C (Cannon
Street:betweeri Taft Avenue and East Santiago Cariyon Road):is forecast to operate at
unacceptable LOS E ori a daily basis in,the _Year 2022 with:o:ut:project tr ic;:t. is . ey
roadway segment:is forecast to,operate at acceptable I;OS C with.the.pr.oposed project
:
"Without Sarid and Gravel.Cred'it"{with inclusion of tlie pr.oject-specific improvements):
The rerriaining 15 key roadway segments are forecast to continue to operatie: at an
acceptable service:level on a daily basis with tfie addition of project generated fraffic 'iri the
. �. Year 2022 traffic condition"Witliout Sand and Gravel Credit."
Year 2022 With Project Traffic Conditions (With Sand and Gravel Credit).
Review of Colurriri(5) of Table 3:16=19 indicates tfiat traff c associated�witfi the proposed
project :``:With Sand and Gravel Credit" will not significantly impact any of tlie 1Z �key �
.
roadway segmerits, when compared.to the LOS standards and significant impact criteria
�specified in the TIA. Although Roadway Segment:B (Cannon Street:between Serrano : :
Avenue and Taft Avenue) is forecast to operate at unacceptable LOS F on a daily liasis in
tlie Year 2022 without project traffic; the level of service for this key roadway segment
.. ..
improves to .I;OS E with th.e proposed project: "With:Sand and Gravel :Credit" (with
inclusion of the project=specific improverrients). Although Roadway Segment C (Cannon
Str.eet between Taft:Avenue and East Santia o Can on Road is forecast to o erate at
_.
g Y .... ) � p
unacceptalile LOS E on a daily basis in the Year.2022 without project traffic, this key
roadway segment is. forecast fo operate at acceptable LO_S C with tlie proposed project
•
_. .
:, ,__ "With Sand and Gravel Credit"(with inclusion of the proj ect-specific improvemeritsj:.::The
remaining TS key roadway segrrients are forecast to coritinue to operate at an acceptable
service level ori a daily basis with.the addition of project:generated traffic iri the Year 2022
_
traffic condition"With Sand and Gravel Credit:"
� As discussed:ab:ove, the ro'ect would result in an im act at�Oran e Park B.oulevard/East
P J .. P. . g .
Santiago::Canyori Road. To mitigate the proposeci project's impacts at Orange Park
Boul.evard/East Santiago: Canyon Road,, Mitigation Measure:TRANS-2 wou ,; reguire
improvements tb each intersection: : The improvemerits:are depicted in Exhibit 3.16-21. .
Because tlie proj ect contributes to pre-existing.def cient conditions; it is orily required to
miti ate for its fair share of the im act. The. fair share cal.culations are sununarized in
g.. . . P
.
_
Table 3:16-20.
. . r.-_---- . . _ . ..._. --- . _ ...._ . . __� �-� . - ---T" '-�--..:.. ------��--:-� . .
i � : T � .�'�) I �2) �. .: ::I3) � �4I:: :: I
; Impact Projec i 22,! _ Project �
Exist' Year 20
, . .. �
� �:. ed t Only :: ng With. , :Fair Share �
_ : .:: . :
T' V I I P
�. .. . . .. . .
, - ime o um I Vo um ro�ect ;Responsibi;
� :f��r:-_-- � — —. . I.... Ii �
�_.__,__. ..:. �
.. e e . �olume fiy ;
y -= -- --a-- —
Ke Intersectwn. Per�od
—_:.(�: � ,
O:range Park Boulevard at East AM — �
� .. . � . � � � � .
j Santiago Canyon Road (Without Sand � PM �, 68 f 3;436 '; 3,810 � 18.2 �
l and Gravel C�edit) � � � � :, � percent �
�-------- —:---- -----�-
�--_----
�
... . . .. � '.-_Y.-.-'____-,__--_�
;Orange Park Boulevard at East � AM ; — . .i :: - '' �' . — �
;Santiago Canyon Road (VVith Sand i PM ; 51 � 3;447 � 3,805 '; 14.2 �
i and Gravel:Credit) � � � C I percent I,
!--- - — ' ^.��__,__ _� r'�_._��.___-- --_----
082654110786529u1 ([�
City of Orange Trails at Santiago Creek Project
;Notes:
,Net Project Percent Increase (4) = Column (1)/[Column (3)—Column (2)]
',Bold Project Fair Share Responsibility is based on worst-case scenario.
i Source: Linscott, Law & Greenspan, Engineers, 2017.
MM TRANS-2: Prior to issuance of building permits,the project Applicant shall provide the
City of Orange with fair share fees to restripe the northbound approach of
Orange Park Boulevard at East Santiago Canyon Road to provide one
exclusive left-turn lane and one shared left-turn/right-turn lane. The
Applicant's fair share responsibility for these improvements is 18.2 percent.
Despite the fair share contribution provided through Mitigation Measure TRANS-2 mitigating the
' proposed project's impacts at Orange Park Boulevaxd/East Santiago Canyon Road, impacts would
� be significant and unavoidable as the Orange Park Boulevard/East Santiago Canyon Road
intersection is not listed in the City of Orange MPAH, or any similar plans. There are no other
feasible mitigation measures that would reduce the project's impacts to a less than significant level.
VII. FINDINGS REGARDING IRREVERSIBLE AND IRRETRIEVABLE
COMMITMENT OF RESOURCES
Implementation of the proposed Project would require the commitment of building
' materials such as lumber and other forest products, sand and gravel, photochemical
' construction materials, steel, copper, lead, and water for construction of the proposed 40
residential home development. Given the level of building materials necessary to sustain
ongoing regional development, the commitment of such materials to the proposed Project
is insignificant by comparison.
There would be an irretrievable commitment of energy resources such as gasoline and
diesel fuel for the operation of construction equipment. Because these types of resources
are available in sufficient quantities in this region and the proposed Project encompasses a
very limited scope, these impacts would be temporary and are not considered significant.
In addition, up to 90 percent of the demolished material would be reused on site, resulting
in a significant reduction in fuel consumption that would otherwise be required for hauling
large volumes of import material from offsite locations to the site and required for hauling
large volumes of export material to an offsite recycling facility or landfill. In addition,
multiple green building strategies would be implemented in order to reduce the amount
resources committed. The project would be required to comply with Title 24 of the
California Building Standards Code, which is referred to as the California Green Building
Standards Code.
Based on, (1) the relatively small-scale of the Project and (2) the Project's obligation to
meet current energy efficiency standards and requirements, the change in energy
consumption resulting from Project implementation would be considered less than
significant.
In addition, the proposed Project would not significantly alter the consumption of and/or
demand for non-renewable resources over that anticipated by the City of Orange General
082654\10786529v 1 (5
City of Orange Trails at Santiago Creek Project
Plan.Although Project implementation would result in an increased demand for some non-
renewable resources, the demands are consistent with the long-range plans for the City of
Orange. Demand and consumption of non-renewable resources would be within the limits
anticipated for residential development in the long-term. The proposed development of the
Project site would not result in any adverse impacts related to the commitment of resources
in the immediate or distant future.
VIII. FINDINGS REGARDING GROWTH INDUCING IMPACTS
The following four criteria were considered with regard to the Project's potential growth-
inducing impacts:
• Would the pYoposed Project �esult in the removal of an impediment to
gNowth such as the establishment of an essential public service o� the
provision of new access to an area?
• Would the proposed Project result in economic expansion or growth such
as changes in the revenue base or employment expansion?
• Would the p�oposed Project result in the establishment of a p�ecedent
setting action such as an innovation, a radical change in zoning oY a
General Plan amendment approval?
• Would the proposed Project result in development oN encroachment in an
isolated or adjacent area of open space, as opposed to an infill type of
project in an area that is al�eady largely developed?
The analysis of growth-inducing impacts concludes that based on the four criteria analyzed
in the EIR, the proposed Project would not result in any potentially significant growth-
inducing impacts. Implementation of the proposed Project would be consistent with the
City of Orange General Plan and Zoning Ordinance, thus meeting the long-range plans
adopted by the City of Orange. Further, the proposed uses (i.e., single-family residential
and open space) are not characterized by features that attract or facilitate new,
unanticipated development that would ordinarily be considered growth-inducing.
Conventionally, growth inducement is measured by the potential of a project or a project's
secondary effects (i.e. provision of new infrastructure which supports housing or creation
of jobs)to facilitate development of housing. Further, all of the infrastructure that exists in
the Project area can provide an adequate level of service, including sewer and water; storm
drainage improvements would be made as part of the Project. Circulation or other
infrastructure improvements are not required as a result of project implementation.
Project implementation would not result in any significant direct or indirect additional
residential development that would generate unanticipated new residents or employment
that would be an "attractor" of residents to the area that are not already anticipated. The
site is not located in an isolated area that is constrained by the absence of infrastructure
where the provision of infrastructure would promote further development. None of the
accepted standards that distinguish growth-inducing projects characterize the proposed
082654\10786529v1 66
City of Orange Trails at Santiago Creek Project
Project; therefore, no significant growth-inducing impacts are anticipated as a result of
project implementation.
IX. FINDINGS REGARDING CUMULATIVE IMPACTS
Cumulative impacts analysis requires consideration of the impacts of other projects in an
area, in conjunction with the proposed Project, to assess the potential for significant
cumulative impacts. For this EIR, the potential environmental effects of the proposed
Project were considered in conjunction with the potential environmental effects of buildout
anticipated for the project area. The project's cumulative impacts were considered in
conjunction with other proposed and approved projects in the City, which are listed in
Table 4-1 in the EIR.
' A�riculture Resources and Forest Resources
There are no agricultural or forestry resources within the project site or on surrounding
land uses. This condition precludes the possibility of the proposed project contributing to
a cumulative impact in this regard. No impacts would occur.
Air QualitY
The geographic scope of the cumulative greenhouse gas emissions analysis is the South
� Coast Air Basin, which encompasses Orange County, Los Angeles County (excluding the
� Antelope Valley), Ventura County,Riverside County(excluding the Coachella Valley and
the desert region) and San Bernardino County (excluding the desert region). Air quality is
impacted by topography, dominant air flows,atmospheric inversions,location,and season;
therefore, using the Air Basin represents the area most likely to be impacted by air
emissions.
All of the projects listed in Table 4-1 would result in new air emissions,during construction
or operations(or both). The air basin is currently in non-attainment of the federal standards
for ozone, PM 10 and PM2.5, and is in nonattainment of the state standards for ozone and
PM2.5. Therefore, there is an existing cumulatively significant air quality impact with
respect to these pollutants.
The proposed project would emit construction and operational criteria pollutant emissions
at levels that would exceed the South Coast Air Quality Management District(SCAQMD)
thresholds. Mitigation is proposed requiring the implementation of criteria pollutant
emissions (i.e., ozone precursors) reduction measures and would serve to reduce
construction and operational emissions to below SCAQMD thresholds. Thus,the proposed
project would not have a cumulatively considerable contribution to criterial pollutant
emissions.
As discussed in Section 3.3,Air Quality, cumulative cancer, non-cancer chronic and acute
, health impacts, and PM2.5 concentrations were evaluated at the most impacted off-site
sensitive receptor from all sources of toxic air contaminant(TAC)emissions located within
1,000 feet of the project site. The project's individual contribution to cancer risk for all
phases is below the SCAQMD's 10 in a million threshold for individual project impacts;
082654\10786529v l (']
City of Orange Trails at Santiago Creek Project
therefore, the project would not result in a cumulatively considerable contribution to the
existing, cumulatively significant TAC cancer risk. �
All other project-related air quality impacts were found to be less than significant and did
not require mitigation. Other projects that result in similar impacts would be required to
mitigate for their impacts. Because the proposed project can mitigate all of these remaining
air quality impacts to a level of less than significant, it would not have a related
cumulatively significant impact with respect to these impact areas.
Biological Resources
The geographic scope of the cumulative biological resources analysis is the region
surrounding the project site. The project site is located in an area characterized by urban
development and infrastructure; accordingly, habitats in these areas tend to be
characterized as highly disturbed, and impacts would be localized. Recent development
patterns and anticipated future growth in the Orange region is considered an existing
cumulatively significant impact to biological resources due to the loss of potential habitat
for rare species.
The proposed project has the potential to have a significant impact on the least Bell's vireo
and nesting birds. Mitigation Measures BIO-2a through BIO-2d are proposed requiring
pre-construction surveys for these species and implementation of protection measures if
they are found to be present. Some of the other projects listed in Table 4-1 are located on
sites with similar biological attributes and, therefore, would be required to mitigate for
impacts on special-status wildlife species in a manner similar to the proposed project. The
required mitigation would reduce the project's contribution to any significant cumulative
impact on special-status wildlife species to less than cumulatively considerable.
The proposed project has the potential to have a significant impact on sensitive riparian
communities and wetlands. Mitigation Measures BIO-3 and BIO-4 are proposed requiring
restoration or replacement of disturbed features. Some of the other projects listed in Table
4-1 are located on sites with similar biological attributes and,therefore, would be required
to mitigate for impacts on sensitive riparian communities and wetlands. The required
mitigation would reduce the project's contribution to any significant cumulative impact on
sensitive riparian communities and wetlands to less than cumulatively considerable.
All other project-related biological resource impacts (e.g., wildlife movement,
conservation plans) were found to be less than significant and did not require mitigation.
Other projects that result in similar impacts would be required to mitigate for their impacts.
Because the proposed project's impact on all of these remaining biological resources is less
than significant,it would not have a cumulatively considerable contribution to any existing
significant cumulative impact.
Cultural Resources
The geographic scope of the cumulative cultural resources analysis is the project vicinity.
Cultural resource impacts tend to be localized because the integrity of any given resource
depends on what occurs only in the immediate vicinity around that resource, such as
082654\10786529v 1 (g
City of Orange Trails at Santiago Creek Project
� disruption of soils; therefore, in addition to the project site itself, the area near the project
site would be the area most affected by project activities (generally within a 500-foot
radius).
Construction activities associated with development projects in the project vicinity may
have the potential to encounter undiscovered cultural resources. These projects would be
required to mitigate for impacts through compliance with applicable federal and state laws
governing cultural resources. Even if a significant cumulative impact could be found, the
proposed project would not make a cumulatively considerable impact with required
' mitigation. The likelihood of any significant cultural resources on the project site are very
low given the developed nature of the site, previous disruptions to its ground and the lack
of any known resource within its boundaries. Although there is the possibility that
� previously undiscovered resources could be encountered by subsurface earthwork
activities, the implementation of standard construction mitigation measures would ensure
that undiscovered cultural resources are not adversely affected by project-related
� construction activities, which would prevent the destruction or degradation of potentially
significant cultural resources in the project vicinity. Given the low potential for disruption,
and the comprehensiveness of mitigation measures that would apply to this project and
those in the vicinity, the proposed project would not make a cumulatively considerable
contribution to any potentially significant cumulative impact on cultural resources.
Therefore, the proposed project, in conjunction with other planned and approved projects,
would not have a cumulatively significant impact related to cultural resources.
Geology and Soils
The geographic scope of the cumulative geology, soils, and seismicity analysis is the
project vicinity. Adverse effects associated with geologic, soil, and seismic hazards tend
to be localized,and the area near the project site would be the area most affected by project
activities (generally within a 0.25-mile radius). Development in the project vicinity has
not included any uses or activities which would result in geology, soils or seismicity
impacts(such as mining or other extraction activities),and there is no existing cumulatively
significant impact.
� Development projects in the project vicinity may have the potential to be exposed to
seismic hazards. However, there is a less than significant potential of the projects in
combination to expose people or structure to substantial adverse effects, including the risk
of loss, injury, or death in the event of a major earthquake; fault rupture; ground shaking;
seismic-related ground failure; landslide; or liquefaction. Some or all of the other projects
listed in Table 4-1 would be exposed to similar seismic hazards and, therefore, would be
expected to implement similar regulatory requirements and mitigation measures. As such,
the proposed project, in conjunction with other projects, would not have a cumulatively
significant impact associated with seismic hazards.
Regarding soil erosion, development activities could lead to increased erosion rates on-site
soils, which could cause unstable ground surfaces and increased sedimentation in nearby
streams and drainage channels. Mitigation Measure HYD-la requires implementation of
032654\10786529v1 69
City of Orange Trails at Santiago Creek Project
standard stormwater pollution prevention measures to ensure that earthwork activities do
not result in substantial erosion off-site. This mitigation, in turn, would have to comply
with the National Pollution Discharge Elimination System (NPDES) stormwater
permitting program,which regulates water quality originating from construction sites. The
NPDES program, which governs projects statewide (and nationwide), requires the
preparation and implementation of Stormwater Pollution Prevention Programs for
construction activities that disturb more than 1 acre, and the implementation of Best
Management Practices that ensure the reduction of pollutants during stormwater
- discharges,as well as compliance with all applicable water quality requirements. Since the
proposed project would have to comply with federal and state regulations and required
mitigation measures that are designed to minimize impacts to projects on a wide geographic
scale,the project's contribution to any significant cumulative erosion impact would be less
than cumulatively considerable.
Finally, the project site contains fill soils that that may not be suitable to support urban
development. Standard grading and soil engineering practices would abate these issues.
Some or all of the other projects listed in Table 4-1 would be exposed to expansive soil
hazards or unstable geologic units and,therefore, would be expected to implement similar
grading and soil engineering practices to address those impacts. The proposed project
would not contribute to any significant cumulative impact due to expansive soils or
unstable soil units.
Therefore, the proposed project, in conjunction with other planned and approved projects,
would not have a cumulatively significant impact related to geology, soils, and seismicity,
assuming compliance with regulatory requirements.
Greenhouse Gas Emissions
The geographic scope of the cumulative greenhouse gas emissions analysis is the South
Coast Air Basin, which encompasses Orange County, Los Angeles County (excluding the
Antelope Valley),Ventura County,Riverside County(excluding the Coachella Valley and
the desert region) and San Bernardino County(excluding the desert region). Air quality is
impacted by topography, dominant air flows,atmospheric inversions,location,and season;
therefore, using the Air Basin represents the area most likely to be impacted by air
emissions.
Greenhouse gas emissions are inherently cumulative in nature, and the appropriate scope
of analysis is the global climate. The proposed project and other projects would emit new
greenhouse gas emissions. The proposed project's greenhouse gas emissions would not
exceed the SCAQMD threshold of 3,500 metric tons of carbon dioxide equivalents after
implementation of mitigation measures and project design features. Therefore, the
project's contribution of greenhouse gas emissions would not be cumulatively significant.
Hazards and Hazardous Materials
The geographic scope of the cumulative hazards and hazardous materials analysis is the
project area. Adverse effects of hazards and hazardous materials tend to be localized;
082654\10786529v 1 ']Q
� Ci of Oran e Trails at Santia o Creek Pro�ect
ty g g J
� therefore, the area near the project area would be most affected by project activities.
, Hazards and hazardous materials are extensively regulated at the federal, state and local
levels. There are no land uses in the project vicinity that are known to utilize large
, quantities of hazardous materials or involve hazardous activities, and there is no existing
cumulatively significant impact.
, The project site is adjacent to the closed Villa Park Landfill and previously supported uses
that involved regular petroleum usage. Thus, the proposed would implement mitigation
, for vapor intrusion and remediation of petroleum-impacted soils. Other projects listed in
' Table 4-1 that have become contaminated from past uses or possess characteristics that
� involve the routine handling of large quantities of hazardous materials, would be required
to mitigate for their impacts. Because hazards and hazardous materials exposure is
generally localized and development activities associated with the other projects listed in
' Table 4-1 may not coincide with the proposed project, this effectively precludes the
possibility of cumulative exposure.
� The project site is adjacent to Santiago Oaks Regional Park and contains the wooded
Santiago Creek Corridor. Thus, it is susceptible to wildland fires and would need to
' provide adequate emergency access. The proposed project would be required to prepare
� and implement a fuel modification plan and comply with all applicable Fire Code
requirements for emergency access. Other projects listed in Table 4-1 that are susceptible
� to wildland fires would be required to implement similar mitigation. Because wildland fire
� exposure is dependent on location and development activities associated with the other
, projects listed in Table 4-1 may not occur in areas susceptible to such hazards, this
' effectively precludes the possibility of cumulative exposure.
, Because the proposed project's impact due to hazards and hazardous materials is less than
significant, it would not have a cumulatively considerable contribution to any significant
cumulative impact.
, Hvdrology and Water Quality
I The geographic scope of the cumulative hydrology and water quality analysis is the project
i
vicinity, generally areas within 0.5 mile of the project site for stormwater impacts due to
� natural drainage patterns, drainage infrastructure, and impervious surfaces, which all
contribute to limit the distance of stormwater flows. Hydrologic and water quality impacts
; tend to be localized; therefore, the area near the project site would be most affected by
proj ect activities. The nature and types of surrounding development, existing stormwater
, infrastructure and regulatory requirements have ensured that no cumulatively significant
impacts related to water pollutants or flooding exist within the project vicinity.
The proposed project would involve short-term construction and long-term operational
activities that would have the potential to degrade water quality in downstream water
bodies. Mitigation Measures HYD-1 a and HYD-1 b are proposed that would require
implementation of various construction and operational water quality control measures to
prevent the release of pollutants into downstream waterways. Other projects that propose
new development are required to implement similar mitigation measures in accordance
082654110786529v1 '71
City of Orange Trails at Santiago Creek Project
with adopted regulations. The required mitigation would reduce the project's contribution
to any significant cumulative water quality impact to less than cumulatively considerable.
The project site is within the dam failure inundation area of Villa Park Dam and Santiago �
Dam. Mitigation Measure HYD-5 is proposed requiring the applicant to implement an
Emergency Evacuation Plan that identifies procedures for an orderly evacuation of the
project in the event indications of failure occur at either facility. Other projects that are
within the dam failure inundation area would be required to comply with applicable
emergency evacuation regulations. The required mitigation would reduce the project's
contribution to any significant cumulative dam failure impact to less than cumulatively
considerable.
All other project-related hydrology impacts (e.g., groundwater, drainage and 100-year
flood hazards)were found to be less than significant and do not require mitigation. Because
all project-related hydrology impacts are less than significant, the project would not have
a cumulatively considerable contribution to any significant cumulative impact for these
impacts.
Land Use and Plannin�
The geographic scope of the cumulative land use analysis is the Orange area. Land use
decisions are made at the city level;therefore,the Orange area is an appropriate geographic
scope. Development within Orange is governed by the City's General Plan and the
Municipal Code, which ensure logical and orderly development and require discretionary
review to ensure that projects do not result in land use impacts due to inconsistency with
the General Plan and other regulations. As a result, there is no existing cumulatively
significant land use impact.
The project site is currently designated for LDR, RA, and OS by the General Plan and
zoned S-G and R-1-8. The proposed project involves the development of up to 128
dwelling units on 40.7 acres within the area designated RA and the preservation of the
remaining 68.5 acres (which overlap with the RA and LDR designations) as open space
and recreation uses. Accordingly,the applicant is proposing to change the RA designation
to a combination of LDR and OS; and the LDR designation to OS. Thus, the proposed
land use changes would serve to relocate the residential use and replace the resource use
with open space use,which was found to be a less than significant impact.
Development projects in the Orange area would continue to be required to demonstrate
consistency with all applicable City of Orange General Plan and Municipal Code
requirements. This would ensure that these projects comply with applicable planning
regulations. Those projects listed in Table 4-1 that have been previously approved have
been deemed consistent with all applicable General Plan and Specific Plan requirements.
For pending projects, the lead agency would be required to issue findings demonstrating
consistency with the applicable General Plan and Municipal Code requirements if they are
ultimately approved.
0826�4\10786529v1 72
City of Orange Trails at Santiago Creek Project
Therefore, the proposed project, in conjunction with other planned and approved projects,
wou�d not have a cumulatively significant impact related to land use.
Mineral Resources
The geographic scope of the cumulative mineral resource analysis is Orange County-
Temescal Valley Region, which encompasses Orange County and western Riverside
County. This region was defined by the California State Mining and Geology Board for
the purposes of identifying mineral resource zones. ,
The Orange County-Temescal Valley Region was identified by the California Geological
Survey as having only an 11 to 20 year supply of aggregate left in 2012. Thus, there an
existing cumulative impact in terms of regional availability of aggregate resources.
The proj ect site was surfaced mined for aggregate between 1919 and 1995. Following the
cessation of mining activities, mined areas of the site have been backfilled, which
effectively precludes the resumption of aggregate mining operations. Furthermore, the
Geotechnical Investigation prepared for the project site indicates that it has been mined of
economic aggregate deposits and the remaining deposits that are of potential economic
value are infeasible to mine, due to limited volume of the localized deposits, expense of
removing the overburden (pond deposits), and difficulty associated with excavation
logistics. Thus, resuming aggregate mining operations on the project site would not be
economically feasible and the resource is effectively depleted. Accordingly, the
conversion of the project site to residential and open space/recreational use would not
cumulatively contribute to the loss mineral resources of value to the State or region because
the site has been depleted of all economically recoverable aggregate materials.
Noise
The geographic scope of the cumulative noise analysis is the project vicinity, including
surrounding sensitive receptors. Noise impacts tend to be localized;therefore,the analysis
' in Section 3.12,Noise includes a cumulative analysis of existing,proposed,and anticipated
future noise levels near the project site. Outdoor noise measurements taken at the project
site indicate that the average ambient noise levels are within the "normally acceptable" or
� "conditionally acceptable" range for all land uses. Therefore, there is no existing
cumulatively significant noise impact in the project vicinity.
The proposed project's construction noise levels may cause a temporary substantial
increase in noise levels at nearby receptors. Mitigation is included that would require
_ implementation of construction noise attenuation measures to reduce noise levels;
however, construction noise levels may exceed adopted standards at certain nearby
receptors and, therefore, is considered a significant unavoidable impact. Other projects
listed in Table 4-1 would be required to implement similar mitigation and adhere to
Municipal Code restrictions regarding construction noise. It is highly unlikely that a
substantial number of the cumulative projects would be constructed simultaneously and
close enough to one another for noise impacts to be compounded, given that the projects
are at widely varying stages of approval and development. Therefore, it is reasonable to
082654110786529v 1 73
City of Orange Trails at Santiago Creek Project
conclude that construction noise from the proposed project would not combine with noise
from other development projects to cause cumulatively significant noise impacts.
The proposed project's construction and operational vibration levels would not exceed
annoyance thresholds, and impacts would be less than significant. Because vibration is a
highly localized phenomenon, there would be no possibility for vibration associated with
the project to combine with vibration from other projects because of their distances from
the project site. Therefore, the proposed project would not contribute to a cumulatively
significant vibration impact.
The proposed project's contribution to vehicular noise levels would not exceed the
applicable thresholds of significance, which take into account existing noise levels as well
as noise from trips associated with other planned or approved projects. Thus,the proposed
project would not combine with other projects to cause a cumulatively considerable
increase in ambient roadway noise.
Other projects listed in Table 4-1 would be required to evaluate noise and vibration impacts
and implement mitigation, if necessary, to minimize noise impacts pursuant to local
regulations. Therefore, the proposed project, in conjunction with other planned and
approved proj ects, would not have a cumulatively significant impact related to noise.
Population and Housin�
The geographic scope of the cumulative population and housing analysis is the City of
Orange. Population growth is typically measured in relation to the size of the applicable
jurisdiction and, thus, the City of Orange is appropriate geographical area. No existing
cumulatively significant impacts have been identified for this topic.
The proposed project would develop 128 dwelling units, which would add 393 persons to
the City of Orange's population, which represents an increase of 0.3 percent relative to the
City's population of 141,420. The project site is currently designated for residential use
by the City of Orange General Plan and Orange Zoning Ordinance and, thus, is
contemplated to support population growth. Growth inducement impacts were found to be
less than significant. Other development projects in the City of Orange would be reviewed
for impacts on population growth and would be required to address any potential impacts
with mitigation. Therefore,the proposed project, in conjunction with other future projects,
would not have a cumulatively significant impact related to growth inducement.
Public Services
The geographic scope of the cumulative public services analysis is the service area of each
of the providers serving the proposed project. Because of differences in the nature of the
public service and utility topical areas, they are discussed separately. No existing
cumulatively significant impacts have been identified for any of these areas, as all service
providers are able to achieve the requisite level of service, capacity or response times.
Fire Protection and Emergency Medical Services
082654\10786529v1 '74
Cit of Oran e Trails at Santia o Creek P o'ect
� Y g g rJ
� The geographic scope of the cumulative fire protection and emergency medical services
'� analysis is the Orange Fire Department's service area, which consists of the Orange city
limits.
The proposed project would develop 128 dwelling units on 40.7 acres of the project site
I and preserve the remaining acreage as open space. The proposed project is estimated to
' add 393 new residents to the City's population. The project site is located within 1.75
� miles of the nearest fire station and is within an acceptable response time for fire protection.
As such,the proposed project would not create a need for new or expanded fire protection
facilities and would not result in a physical impact on the environment.
' The project site is adjacent to Santiago Oaks Regional Park and contains the wooded
' Santiago Creek Corridor. Thus, it is susceptible to wildland fires and would need to
� provide adequate emergency access. The proposed project would be required to prepare
and implement a fuel modification plan and comply with all applicable Fire Code
�, requirements for emergency access. Other projects listed in Table 4-1 that are susceptible
� � to wildland fires would be required to implement similar mitigation. Because wildland fire
� exposure is dependent on location and development activities associated with the other
' projects listed in Table 4-1 may not occur in areas susceptible to such hazards, this
effectively precludes the possibility of cumulative exposure.
Other development proj ects in the Fire Department's service area would be reviewed for
impacts on fire protection and emergency medical services and would be required to
, address any potential impacts with mitigation. According to the Fire Department, existing
facilities are sufficient to serve the proposed project in conjunction with existing and
cumulative projects. Therefore, the proposed project, in conjunction with other future
projects, would not have a cumulatively significant impact related to fire protection and
emergency medical services.
� Police Protection
� The geographic scope of the cumulative police protection analysis is the service area of the
, Orange Police Department, which consist of the Orange city limits.
� The proposed project would develop 128 dwelling units on 40.7 acres of the project site
and preserve the remaining acreage as open space. The proposed project is estimated to
add 363 new residents to the City's population. The Police Department indicated that it
could serve the proposed project without needing new or expanded police protection
facilities. Other development projects within the Police Department service area would be
� reviewed for impacts on police protectiori and would be required to address any potential
impacts with mitigation. According to the Police Department, existing facilities are
sufficient to serve the proposed project in conjunction with existing and cumulative
projects. Therefore,the proposed project, in conjunction with other future projects, would '
not have a cumulatively significant impact related to police protection.
Schools
082654\10786529v1 75
City of Orange Trails at Santiago Creek Project
The geographic scope of the cumulative school analysis is the Orange Unified School
District(OUSD), which encompasses the City of Orange, and all or portions of Anaheim,
Garden Grove, Santa Ana, and Villa Park.
The proposed project would develop 128 dwelling units on 40.7 acres of the project site
and preserve the remaining acreage as open space. The proposed project is estimated to
add 64 new students to OUSD. The proposed project would pay development fees to
OUSD to fund capital improvements to school facilities. Other development projects
within OUSD would be reviewed for impacts on schools and would be required to pay
development fees. Therefore, the proposed project, in conjunction with other future
projects, would not have a cumulatively significant impact related to schools.
Parks
The geographic scope of the cumulative park analysis is the Orange city limits. Within the
city limits are neighborhood parks, community parks, regional parks, trails, community
gardens, and historic sites.
The proposed project would develop 128 dwelling units on 40.7 acres of the project site
and preserve the remaining acreage as open space. The proposed project is estimated to
add 393 new residents to the City's population. The proposed project would provide a trail
network and passive use areas(open space and greenway). The provision of these facilities
would be expected to offset the increased demand for such facilities because project
residents would be expected to use the facilities closest to where they live. Other
development projects within the city limits would be reviewed for impacts on parks and
would be required to dedicate new public facilities or pay development fees. Therefore,
the proposed project, in conjunction with other future projects, would not have a
cumulatively significant impact related to parks.
Recreation
The geographic scope of the cumulative recreation analysis is the Orange city limits.
Within the city limits are neighborhood parks, community parks, regional parks, trails,
community gardens, and historic sites.
The proposed project would develop 128 dwelling units on 40.7 acres of the project site
and preserve the remaining acreage as open space. The proposed project is estimated to
add 393 new residents to the City's population. The proposed project would provide a trail
network and passive use areas(open space and greenway). The provision of these facilities
would be expected to offset the increased demand for such facilities because proj ect
residents would be expected to use the facilities closest to where they live. Other
development projects within the city limits would be reviewed for impacts on parks and
would be required to dedicate new public facilities or pay development fees. Therefore,
the proposed project, in conjunction with other future projects, would not have a
cumulatively significant impact related to recreation.
Transportation and Traffic
0826�4\10786529v 1 '](
City of Orange Trails at Santiago Creek Project
The geographic scope of the cumulative transportation analysis is the roadway network
within the eastern portion of the City of Orange. As discussed in the Transportation Section
3.16 of this EIR, study facilities consist of ten study intersections and 17 roadway
segments.
All of the new development projects listed in Table 4-1 would generate new vehicle trips
that may trigger or contribute to unacceptable intersection operations and freeway
operations. All projects would be required to mitigate for their fair share of impacts. The
proposed project would result in 542 net new daily trips, including 34 net new trips during
the weekday morning peak hour, and 97 net new trips during the weekday afternoon peak
hour. Project-related trips would not cause any facilities operating at deficient levels to
significantly deteriorate further under With Trip Credit Existing Traffic Conditions,
Existing Plus Project Traffic Conditions, and Cumulative (2040) conditions. Project-
� related trips would cause one facility operating at deficient levels to significantly
deteriorate further under Year 2022 conditions. While the proposed project would have a
significant and unavoidable impact due to the facility not being in a City of Orange plan,
such as the MPAH, mitigation is proposed that would require the project applicant to
contribute to planned improvements at this location that would restore operations to
acceptable levels. Therefore, the proposed project, in conjunction with other projects,
would not result in a cumulatively significant impact to unacceptable traffic operations.
For other transportation-related areas (roadway safety; emergency access; public transit,
bicycles and pedestrians), the proposed project would have potentially significant impacts
related to roadway hazards,but after the implementation of mitigation,these impacts would
be reduced to a level of less than significant. Other projects that result in similar impacts
would be required to mitigate for their impacts. Because the proposed project can mitigate
all other transportation impacts to a level of less than significant,it would not have a related
cumulatively significant impact with respect to these other topics.
Tribal Cultural Resources
The geographic scope of the cumulative registered historical resources analysis is the
project vicinity. Registered historical resource impacts tend to be localized because the
integrity of any given resource depends on what occurs only in the immediate vicinity
around that resource, such as construction; therefore, in addition to the proj ect site itself,
the area near the project site would be the area most affected by project activities(generally
within a 500-foot radius).
Construction activities associated with development projects in the project vicinity may
have the potential to remove or damage registered historical resources. Given that neither
the project site nor any other project site in the vicinity is listed on any national, state, or
local registers of historic places(including those for tribal cultural resources),the proposed
project would not make a cumulatively considerable contribution to any potentially
significant cumulative impact or registered historical resources.
Therefore, the proposed project, in conjunction with other planned and approved projects,
would not have a cumulatively significant impact related to registered historical resources.
082654\10736529v1 '�'�
City of Orange Trails at Santiago Creek Project
The geographic scope of the cumulative tribal cultural resources analysis is the project
vicinity. Tribal cultural resource impacts tend to be localized because the integrity of any
given resource depends on what occurs only in the immediate vicinity around that resource,
such as disruption of soils; therefore, in addition to the project site itself,the area near the
project site would be the area most affected by project activities (generally within a 500-
foot radius).
Construction activities associated with development projects in the project vicinity may
have the potential to encounter undiscovered tribal cultural resources. These projects
would be required to mitigate for impacts through compliance with applicable federal and
state laws governing tribal cultural resources. Even if a significant cumulative impact
could be found, the proposed project would not make a cumulatively considerable impact
with required compliance. The likelihood of any significant tribal cultural resources on the
project site are very low given the developed nature of the site, previous disruptions to its
ground, and the lack of any known resource within its boundaries. Although there is the
possibility that previously undiscovered resources could be encountered by subsurface
earthwork activities, the implementation of standard construction mitigation measures
would ensure that undiscovered tribal cultural resources are not adversely affected by
project-related construction activities, which would prevent the destruction or degradation
of potentially significant tribal cultural resources in the project vicinity. Given the low
potential for disruption, and compliance with construction best management practices that
would apply to this project and those in the vicinity, the proposed project would not make
a cumulatively considerable contribution to any potentially significant cumulative impact
on tribal cultural resources.
Therefore, the proposed project, in conjunction with other planned and approved projects,
would not have a cumulatively significant impact related to tribal cultural resources.
Utilities and Service S. s�
Water
The geographic scope of the cumulative potable water analysis is the City of Orange Water
Division service area, which encompasses the Orange city limits and nearby
unincorporated areas of Orange County. The City of Orange water service area has 36,347
customer accounts. Water supply impacts are analyzed in Section 3.17, Utilities and
Service Systems of this EIR,which concluded that the City of Orange has adequate potable
water supplies to serve the proposed project, as well as other existing and future users.
Therefore, there is no existing cumulatively significant impact related to potable water
supply.
The proposed project is estimated to demand 99.5 acre-feet per year of potable water. The
City of Orange 2015 Urban Water Management Plan indicates that potable water supplies
were estimated to be 28,000 acre-feet in 2020 and are expected to increase to 29,500 acre-
feet in 2040. The City of Orange has two supply sources(groundwater and imported water)
and thus does not rely on a single water source. The proposed project's increase in demand
would represent less than 1 percent of potable water supplies under all scenarios between
082654\10786529v 1 ']g
City of Orange Trails at Santiago Creek Project
� 2015 and 2035. Furthermore, the City of Orange 2015 Urban Water Management Plan
� assumed that 460 dwelling units and open space uses would be developed on the project
site and, therefore, accounted for demand from the proposed project in its long-term
� demand projections.
It should be noted that not all of the projects listed in Table 4-1 are located within the City
' of Orange water service area. However, for those projects that are located with the City of
Orange water service area, the 2015 Urban Water Management Plan anticipates adequate
water supplies for all water year scenarios through 2040. These projects also would be
� required to demonstrate that they would be served with potable water service as a standard
requirement of the development review process, and these projects may be required to
implement water conservation measures to the extent they are required. Therefore, the
proposed project, in conjunction with other planned and approved projects,would not have
a cumulatively significant impact related to water supply.
Wastewater
The geographic scope of the cumulative wastewater analysis is the areas tributary to
Orange County Sanitation District (OCSD) Plant No. 1 and Plant No. 2. The two plants
treat all of the effluent generated with the OCSD service area, which covers 479 square
miles of central and northwest Orange County.
All future projects would be required to demonstrate that sewer service is available to
ensure that adequate sanitation can be provided. The proposed project is estimated to
generate 74,400 gallons of wastewater on a daily basis (0.060 million gallons per day
[mgd]). Plant No. 1 and Plant No. 2 have a combined treatment capacity of 366 mgd of
primary treatment capacity and 200 mgd of secondary treatment capacity. The increase of
0.060 mgd attributable to the proposed project represents less than 1 percent of available
� primary or secondary treatment capacity at the two plants and, thus, would not exceed the
capacity of either plant. As such, the plants would be expected to accept the proposed
project's increase in effluent without needing to expand existing or construct new facilities,
� as the treatment capacity is sufficient to serve both the project and planned future
development in the area. Therefore, the proposed project, in conjunction with other
planned and approved projects, would not have a cumulatively significant impact related
� to wastewater. �
Storm Drainage
The geographic scope of the cumulative storm drainage analysis is Santiago Creek, which
currently receives runoff from the project site and would continue to do so in the future.
All future development projects in the project vicinity would be required to provide
drainage facilities that collect and detain runoff such that off-site releases are controlled
and do not create flooding. The proposed project would install a network of storm drainage
facilities within the project site consisting of inlets, underground piping, and basins. This
system would serve 72.58 acres of the site and direct runoff to a 3-acre on-site stormwater
detention basin in the western portion of the site. A flow control structure will be installed
082654110786529v1 '79
City of Orange Trails at Santiago Creek Project
within the detention system to meter the outflow from the site to below predevelopment
levels. Catch basins will be located at various points within the site to capture subarea
flows. The system is designed to detain flows from a 100-year storm event as required by
the Orange County Hydrology Manual. Two sub drainage areas will flow directly to
Santiago Creek without detention. One of these areas is approximately 1.46 acres directly
over the Handy Creek Channel. This flow will be directed to the Handy Creek Channel.
The other area is the trail system adjacent to Santiago Creek and totals 6.20 acres. This
flow will be picked up via a storm drain system, which will outlet at the same location as
the detention basin outlet. The outlet structure from the detention basin to Santiago Creek
will be protected by riprap and an energy dissipater. This would ensure that the proposed
project would not contribute to downstream flooding conditions during peak storm events
and would avoid cumulatively significant stormwater impacts to downstream waterways
at times when capacity is most constrained. The proposed project would also implement
pollution prevention measures during construction and operations to ensure that
downstream water quality impacts are minimized to the greatest extent possible.
Therefore, the proposed project, in conjunction with other planned and approved projects,
would not have a cumulatively significant impact related to storm drainage.
Solid Waste
The geographic scope of the cumulative solid waste analysis is the areas served by the
Frank Bowerman Sanitary Landfill, Olinda Alpha Sanitary Landfill, and the El Sobrante
Landfill. The three landfills have a combined remaining capacity of 384.7 million cubic
yards.
Future development projects would generate construction and operational solid waste and,
depending on the volumes and end uses, would be required to implement recycling and
waste reduction measures. The proposed project is anticipated to generate 1,380 cubic
yards of solid waste during construction and a net increase of 142.1 cubic yards annually
during operations. Both waste generation values represent less than 1 percent of the
remaining capacity figure at the three landfills. As such, sufficient capacity is available to
serve the proposed proj ect as well as existing and planned land uses in the City of Orange
for the foreseeable future. Accordingly, the proposed project, in conjunction with other
future projects, would not have a cumulatively significant impact related to solid waste.
Energy
The geographic scope of the cumulative energy analysis is the Southern California Edison
(SCE) service area (electricity) and the Southern California Gas Company service area
(natural gas). SCE's electrical service area consists of approximately 50,000 square miles
and 5 million metered customers. The Gas Company's natural gas service area
encompasses the southern San Joaquin Valley, the Los Angeles Basin, the Inland Empire,
and the Coachella Valley, and has approximately 5.9 million metered customers.
The proposed project would demand an estimated 805,632 million kilowatt-hours (kWh)
of electricity and 4.5 million cubic-feet of natural gas on an annual basis. The proposed
project's structures would be designed in accordance with Title 24, California's Energy
082654\10786529v 1 g�
City of Orange Trails at Santiago Creek Project
Efficiency Standards for Residential and Nonresidential Buildings. These standards
include minimum energy efficiency requirements related to building envelope,mechanical
systems (e.g., HVAC and water heating systems), indoor and outdoor lighting, and
illuminated signs. The incorporation of the Title 24 standards into the proj ect would ensure
that the project would not result in the inefficient, unnecessary, or wasteful consumption
of energy. Therefore,the proposed project,in conjunction with other future projects,would
not have a cumulatively significant impact related to energy consumption.
X. FINDINGS REGARDING ALTERNATIVES TO THE PROPOSED PROJECT
CEQA requires that an EIR describe a range of reasonable alternatives to the project, or to
the location of the project, which could feasibly attain most of the basic objectives of the
project and to evaluate the comparative merits of the alternatives. Section 15126(d)(1) of
the State CEQA Guidelines states that the ". . . discussion of alternatives shall focus on
alternatives to the project or its location which are capable of avoiding or substantially
lessening any significant effects of the project, even if these alternatives would impede to
some degree the attainment of the project objectives, or would be more costly."
The proposed Project has been compared to four alternatives, including (1) Development
within the Existing Land Use Designations Alternative,(2)No Project Alternative/Existing
Land Use Activities Alternative; (3) Collaborative Group Alternative; and (4) 122-Unit
Alternative.
The analysis contained within the EIR concludes that the proposed Project would result in
long-term project-specific significant unavoidable adverse impacts to air quality and traffic
that cannot be mitigated to a less than significant level. The following discussion
summarizes the potential environmental consequences and highlights the comparative
merits associated with each alternative identified as "potentially feasible" and analyzed in
the EIR as well as the "No Project" alternative.
A. ALTERNATIVES
1. Development within the Existing Land Use Designations
Overview: CEQA Guidelines Section 15126.6(e) requires that an EIR evaluate a
"No Project Alternative," which is intended to allow decision-makers to compare
the impacts of approving the proposed project with the impacts of not approving
the proposed project. In cases where the project constitutes a land development
project, the No Project Alternative is the "circumstance under which the project
does not proceed." For many projects,the No Project Alternative represents a"No
Development" or an "Existing Conditions" scenario, in which the project site
remains in its existing condition and no new development occurs for the foreseeable
future. However, CEQA Guidelines Section 15126.6(e)(3)(B) establishes that "If
disapproval of the project under consideration would result in predictable actions
by others such as the proposal of some other project,this `no project' consequence
should be discussed."
082654\10786529v1 g 1
City of Orange Trails at Santiago Creek Project
In this case, the No Project Alternative consists of development and land use
activities that would occur pursuant to the existing City of Orange General Plan
land use designations of low-density residential, resource, and open space for the
project site.
Residential uses would be developed on 15.4 acres north of Santiago Creek, with
resource land use activities (sand, gravel, and materials recycling) occurring on
773 acres on both sides of the waterway.2 Consistent with the City of Orange
General Plan's density range of 2.1 to 6.0 units per acre,there is an allowable range
of 32 to 92 residential homes. The existing R-1-8 Zoning for the residential area
would yield approximately 40 to 50 single-family dwelling units.3 Vehicular
access would be taken from two points on Mabury Drive.
Resource land use activities would be located on 77.3 acres on both sides of the
waterway. These activities would consist of the continuation of the existing
materials recycling and backfilling operation.
The Santiago Creek corridor would be designated for open space (16.5 acres).
However, no community or recreational uses would be developed.
Summary of Major Environmental Effects: This alternative would have greater
aesthetic, biological resources, cultural resources, geology and soils, and tribal
cultural impacts than the project.
The alternative would result in fewer impacts to air quality, GHG, land use and
planning, mineral resources, noise, population and housing, public services,
recreation, transportation and utilities and service systems. Hazardous materials
and hydrology impacts would be similar to the project.
Abilitv to Achieve Project Objectives: This alternative would advance some, but
not all of the project objectives. This alternative would advance the objectives that
concern clustering residential development in the most suitable areas of the project
site; and promoting land use compatibility with surrounding land uses. However,
none of these objectives would be advanced to the same degree as the proposed
project because (1) fewer dwelling units would be developed; (2) the resource
extraction land use activities would be retained; (3) less open space would be
provided; and (4)no public recreational facilities would be provided.
2
3 The Recirculated Draft EIR Altematives Section erroneously noted that the total number of dwelling units that would be developed under
Altemative 1 would be 90 units,77 units,and 40 units. It also erroneously noted that Altemative 1 would require a General Plan Amendment
to remove the project site from the East Orange General Plan and the Orange Pazk Acres Plan and noted that Alternative 1 would require
improvements to East Santiago Canyon Road/Nicky Way. However,the analysis of Alternative 1 was conducted assuming 40-50 single-
family residential units would be developed under Alternative 1. No General Plan Amendment would be required. In addition, no
improvements to East Santiago Canyon Road/Nicky Way would be required. Therefore,the erroneous statements in the RDEIR have been
revised in the Ettata Section of the Final EIR to clarify that Afternative 1 would yield 40-50 single-family dwelling units,Altemative 1
would not require a General Plan Amendment,and Altemative 1 would not require improvements to East Santiago Canyon Road/Nicky
Way.
082654\10786529v1 82
City of Orange Trails at Santiago Creek Project
Furthermore, this alternative would not advance the objectives that concern
facilitating the redevelopment of an unsightly, underused resource extraction site;
guiding the transition of an infill site with a Specific Plan; protecting Santiago
Creek by abating the remnants of the resource extraction activities; strategically
locating the adjoining Villa Paxk Landfill and the proposed residential uses; and
developing a logical internal circulation system for pedestrians, bicyclists,
equestrians, and motorists.
Elimination/Reduction of Si�nificant Impacts: This alternative would reduce the
project's significant impacts to air quality and traffic.
Comparative Merits: This alternative would not achieve all of the Project
objectives, although it would reduce the project's significant impacts. This
alternative would have greater environmental impacts in the areas of aesthetics,
light, and glare; biological resources; cultural resources; geology and soils; tribal
cultural resources; and hydrology and water quality.
Findin�: The Development within the Existing Land Use Designations Alternative
would reduce the Project's significant and unavoidable impacts to air quality and
traffic. However,it would increase the severity of the proposed project's aesthetics,
light, and glare; biological resources; cultural resources; geology and soils; tribal
cultural resources; and hydrology and water quality. This alternative would also not
achieve all of the Project objectives. For these reasons, the City rejects this
alternative in favor of the proposed Project.
2. No Project Alternative/Existing Land Use Activities Alternative
Overview: The No Project Alternative/Existing Land Use Activities Alternative
consists of the continuation of the existing sand and gravel operations on
approximately 77.3 acres of the project site. Approximately 40 acres between
Santiago Creek and East Santiago Canyon Road are characterized by soil piles and
berms, unpaved roads. An approximately 5-acre area near East Santiago Canyon
Road supports a materials recycling operation that includes apparatus for crushing
boulders,bricks,rocks, and similar materials for recycling. Since 2015,backfilling
operations have been limited to 15 consecutive business days in any 6-month
period;this alternative would allow backfilling operations to resume year-round as
allowed by the current grading permit. The project site would remain inaccessible.
to the public under this alternative.
Summary of Major Environmental Effects: The No Project Alternative/Existing
Land Use Activities Alternative would increase the severity of the proposed
project's aesthetics, light, and glare; biological resources; cultural resources;
geology and soils; noise and utilities and service systems impacts. However, it
would lessen the severity of the proposed project's air quality, GHGs, hydrology
and water quality, mineral resources, population and housing, public services,
recreation, anci transportation and traffic impacts. This alternative would yield
similar impacts for agricultural resources and hazards and hazardous materials.
082654\10786529v1 83
City of Orange Trails at Santiago Creek Project
The No Project Alternative/Existing Land Use Activities Alternative would
advance some,but not all,of the proj ect obj ectives. This alternative would advance
the objectives that concern positively contributing to the local economy through
ongoing mineral extraction. However, none of the objectives would be advanced
to the same degree as the proposed project because (1) no dwelling units would be
developed; (2)the resource extraction land use activities would be retained; (3)less
open space would be provided; and (4) no public recreational facilities would be
provided.
Furthermore, this alternative would not advance the objectives that concern
facilitating the redevelopment of an unsightly, underused resource extraction site;
guiding the transition of an infill site with a Specific Plan; protecting Santiago
Creek by abating the remnants of the resource extraction activities; strategically
locating the adjoining Villa Park Landfill and the proposed residential uses; and
developing a logical internal circulation system for pedestrians, bicyclists,
equestrians, and motorists.
Ability to Achieve Project Objectives: The No Project Alternative/Existing Land
Use Activities Alternative would advance some, but not all, of the project
objectives. This alternative would advance the objectives that concern positively
contributing to the local economy through ongoing mineral extraction. However,
none of the objectives would be advanced to the same degree as the proposed
project because (1) no dwelling units would be developed; (2) the resource
extraction land use activities would be retained; (3) less open space would be
provided; and(4)no public recreational facilities would be provided.
Furthertnore, this alternative would not advance the objectives that concern
facilitating the redevelopment of an unsightly, underused resource extraction site;
guiding the transition of an infill site with a Specific Plan; protecting Santiago
Creek by abating the remnants of the resource extraction activities; strategically
locating the adjoining Villa Park Landfill and the proposed residential uses; and
developing a logical internal circulation system for pedestrians, bicyclists,
equestrians, and motorists.
Comparative Merits: This alternative would partially achieve the Project
objectives, but would increase the severity of the proposed project's aesthetics,
light, and glare; biological resources; cultural resources; geology and soils; noise
and utilities and service systems impacts. On balance, the merits of this alternative
are similar to the project;however,it does not advance all of the project objectives.
Finding: The potential impacts identified for this alternative results in similar
environmental effects due to the reduction in the Project's significant and
unavoidable impacts. However,this alternative would increase the severity of some
impacts and would not satisfy all Project objectives. Therefore, the City Council
rejects this alternative in favor of the proposed Project.
082654\10786529v1 84,
City of Orange Trails at Santiago Creek Project
3. Collaborative Group Alternative
Overview: The Collaborative Group Alternative was developed in response to
meetings between the Applicant representatives and the Collaborative Group,
consisting of representatives from Orange Park Acres, Mabury Ranch, and The
Reserve.
The Collaborative Group Alternative consists of 47 lots and 47 dwelling units of
varying sizes, on approximately 40 acres. The remaining 69.2 acres would be
turned into Santiago Greenway Open Space area. Overall,the Collaborative Group
Alternative would have 81 fewer dwellings and would develop the residential on
approximately 0.71ess acres than the proposed project.
This alternative would not permit all items listed in the preface to the Recirculated
Draft EIR, which are a part of the proposed project. These items include the
following improvements and related considerations:
1. The Specific Plan and associated project accommodates a maximum
number of 128 single-family detached lots located in the southerly portion
of the property and will consist of housing types and lot sizes compatible
with the surrounding neighborhoods as depicted in the Trails at Santiago
Creek Specific Plan, Exhibits 3.1-3.4 and consistent with the development
standards and guidelines set forth in the Specific Plan.
2. The implementation of the Specific Plan and associated proj ect will fund up
to $1,000,000.00 for traffic improvements to widen East Santiago Canyon
Road and restripe Cannon Road prior to the issuance of the first Certificate
of Occupancy of any housing units for the project. Please refer to the Trails
at Santiago Creek Specific Plan,Exhibit 4.1,Areas of Traffic Congestion—
Pre-Project,Exhibit 4.2,Area of Project Related Traffic Improvements,and
Exhibit 4.3, Additional Project Related Traffic Improvements, and Section
4.2.3, Circulation Plan.
3. The implementation of the Specific Plan and associated proj ect will fund
approximately up to a maximum of$4,100,000.00 in landscape and other
improvements for the Santiago Creek Greenway. Said Improvements are
to be completed or funded prior to the issuance of the 60th Certificate of
Occupancy for the Project. Please refer to the Trails at Santiago Creek
Specific Plan, Section 4.2.4, Trails, Open Space and Recreation Plan, and
Exhibit 4.14, Preliminary Greenway, Open Space and Trails Plan.
4. The implementation of the Specific Plan and associated project will fund
$1,000,000.00 to be used for in local area-wide equestrian trail purposes
prior to the issuance of the first Certificate of Occupancy for the project.
5. The implementation of the Specific Plan and associated project will finance
and fund the City's acquisition of the Ridgeline Property, which will
provide the community an additional 50 acres of public open space to the
082654\10786529v 1 g 5
City of Orange Trails at Santiago Creek Project
issuance of the first Certificate of Occupancy for the Project. Please refer
to the Trails at Santiago Creek Specific Plan, Exhibit 4.4, Sully Miller,
Arena and Ridgeline Properties.
6. The implementation of the Specific Plan and associated project will provide
$2,000,000.00 for equestrian and recreational purposes in the East Orange
Area as determined by the City prior to the issuance of the first Certificate
of Occupancy for the project.
This alternative would require the same discretionary permits as the proposed project.
Summary of Major Environmental Effects: The Collaborative Group Alternative would
lessen the severity of the proposed project's air quality, GHG, population and housing,
noise,public services, recreation,transportation, and utilities and service systems impacts.
This alternative would yield similar impacts for all other topics.
The Collaborative Group Alternative would advance some, but not all of the project
objectives. This alternative would advance the objectives that concern clustering
residential development in the most suitable areas of the project site; and promoting land
use compatibility with surrounding land uses.
This alternative would not advance the objectives that concern guiding the transition of an
infill site with a Specific Plan; developing a logical internal circulation system for
pedestrians,bicyclists, equestrians, and motorists; and would not include the Development
Agreement benefits to the community.
Ability to Achieve Project Objectives: The Collaborative Group Alternative would
advance some, but not all of the project objectives. This alternative would advance the
objectives that concern clustering residential development in the most suitable areas of the
project site; and promoting land use compatibility with surrounding land uses.
This alternative would not advance the objectives that concern guiding the transition of an
infill site with a Specific Plan; developing a logical internal circulation system for
pedestrians,bicyclists,equestrians, and motorists; and would not include the Development
Agreement benefits to the community.
Comparative Merits: This alternative would partially achieve the Project objectives, but
would not achieve all of the project objectives. On balance, the merits of this alternative
are incrementally lower than the project; however, it does not advance all of the project
obj ectives.
Findin : The potential impacts identified for this alternative results in slightly reduced
environmental effects due to the reduction in the Project's significant and unavoidable
impacts. However, this alternative would not satisfy all Project objectives. Therefore, the
City Council rejects this alternative in favor of the proposed Project.
082654\10786529v1 g(
City of Orange Trails at Santiago Creek Project
4. 122-Unit Alternative
Overview: The 122-Unit Alternative was developed in response to a series of ineetings
between the Applicant representatives and the Collaborative Group, consisting of
representatives from Orange Park Acres, Mabury Ranch, and The Reserve.
The 122-Unit Alternative consists of 122 lots with an average lot size of 11,200-square-
feet on 40.9 acres of the project site. The remaining 68.3 acres of the project site would be
turned into 68.3 acres of open space consisting of 40.2 acres of Greenway Open Space, and
28.1 acres of Crrasslands Open Space. This alternative differs from the proposed project in
that it would develop ten 0.5-acre equestrian lots on the eastern border of the residential
envelope and twenty-four 10,000-square-foot lots adjacent to East Santiago Canyon Road.
Moreover, in response to input, the Applicant representatives received during meetings
with the Collaborative Group, this alternative proposes larger lot sizes adjacent to The
Preserve and portions of Orange Park Acres.
Overall,the 122-Unit Alternative would have six less dwellings than the proposed project,
but would develop,approximately,an additional 0.2 acres of the project site for residential,
reducing open space by approximately 0.2 acres in comparison to the proposed project.
Additionally,this alternative would have $1,000,000 less in local trail improvements from
the Development Agreement.
This alternative would require the same discretionary permits as the proposed project.
Summary of Maj or Environmental Effects: The 122-Unit Alternative would yield similar
impacts to the proposed project for all topics, and fewer impacts for Air Quality and GHG
impacts. �
Ability to Achieve Project Objectives: The 122-Unit Alternative would advance all of the
project objectives, similar to the proposed project. This alternative would advance the
objectives that concern guiding the transition of an infill site with a Specific Plan;
developing a logical internal circulation system for pedestrians,bicyclists,equestrians,and
motorists; clustering residential development in the most suitable areas of the project site;
and promoting land use compatibility with surrounding land uses. However, this
alternative would have $1,000,000 less in community benefits from the Development
Agreement.
Comparative Merits: This alternative would achieve the Project objectives. However, this
alternative would have $1,000,000 less in community benefits from the Development
Agreement. �
Findin�: The potential impacts identified for this alternative results in $1,000,000 less in
community benefits from the Development Agreement. Therefore,the City Council rejects
this alternative in favor of the proposed Project.
082654\10786529v1 g'�
ATTACHMENT B
TO THE CITY COUNCIL
RESOLUTION OF APPROVAL ADOPTING
FINDINGS PURSUANT TO THE
CALIFORNIA ENVIRONMENTAL
QUALITY ACT
STA'I'�ll1dENT O� O���IIDIl�G
CONSIDERATIONS
Trails at Santiago Project
082654\10786529v1 1
STATEMENT OF OVERRIDING CONSIDERATIONS FOR
THE TRAILS AT SANTIAGO CREEK PROJECT
ORANGE, CA
I. Introduction
The City of Orange is the Lead Agency under the California Environmental Quality Act
(CEQA)for preparation,review and certification of the revised final Environmental Impact
Report(EIR) for the Trails at Santiago Creek Project("Project"). As the Lead Agency,the
City is also responsible for determining the potential environmental impacts of the
proposed action and which of those impacts are significant, and which can be mitigated
through imposition of mitigation measures to avoid or minimize those impacts to a level
of less than significant. CEQA then requires the Lead Agency to balance the benefits of a
proposed action against its significant unavoidable adverse environmental impacts in
determining whether or not to approve the proposed project.
If the lead agency determines that the Proj ect will result in significant,unmitigable impacts,
CEQA Guidelines Section 15093 requires the following:
a) CEQA requires the decision-making agency to balance, as applicable, the
economic, legal, social, technological, or other benefits of a proposed project
against its unavoidable environmental risks when determining whether to approve
the project. If the specific economic, legal, social, technological, or other benefits
of a proposed project outweigh the unavoidable adverse environmental effects,the
adverse environmental effects may be considered"acceptable."
b) When the lead agency approves a project which will result in the occurrence of
significant effects which are identified in the final EIR but are not avoided or
substantially lessened, the agency shall state in writing the specific reasons to
support its action based on the final EIR and/or other information in the record. The
statement of overriding considerations shall be supported by substantial evidence
in the record.
c) If an agency makes a statement of overriding considerations, the statement should
be included in the record of the project approval and should be mentioned in the
notice of determination. This statement does not substitute for, and shall be in
addition to, findings required pursuant to Section 15091.
Public Resources Code Section 21081(b) requires that where a public agency finds that
specific economic, legal, social, technological, or other considerations, including
considerations for the provision of employment opportunities for highly trained workers,
make infeasible the mitigation measures or alternatives identified in an EIR and thereby
leave significant unavoidable effects, the public agency must also find that overriding
economic, legal, social, technological, or other benefits of the project outweigh the
significant effects of the project.
Pursuant to Public Resources Code Section 21081(b) and the State CEQA Guidelines
Section 15093, the City has balanced the benefits of the proposed Project against the
082654\10786529v1 1
following unavoidable adverse impacts associated with the proposed Project and has
adopted all feasible mitigation measures with respect to these impacts. The City also has
examined alternatives to the proposed Project, none of which both meet the Project
objectives and is environmentally preferable to the proposed Project for the reasons
discussed in the Findings of Fact.
The Orange City Council, acting as Lead Agency, and having reviewed the Final EIR for
the Trails at Santiago Creek Project, and reviewed all written materials within the City's
public record and heard all oral testimony presented at public hearings, adopts this
Statement of Overriding Considerations, which has balanced the benefits of the Project
against its significant unavoidable adverse environmental impacts in reaching its decision
to approve the Project.
II. Significant Unavoidable Adverse Environmental Impacts
Although most potential Project impacts have been substantially avoided or mitigated, as
described in the Findings of Fact, complete mitigation is not feasible for Air Quality and
Transportation and Traffic impacts. The City finds that the following impacts would have
a significant impact under CEQA that cannot be reduced to a level of less than significant,
despite implementation of design features and mitigation measures.
AIR-1: The project may conflict with or obstruct implementation of the applicable air
quality plan.
AIR-2: The project may violate any air quality standard or contribute substantially to an
existing or projected air quality violation.
AIR-3: The project may result in a cumulatively considerable net increase of any criteria
pollutant for which the project region is non-attainment under an applicable federal or State
ambient air quality standard.
TRANS-2: The project may conflict with an applicable plan, ordinance or policy
establishing measures of effectiveness for the performance of the circulation system under
Year 2022 Traffic Conditions.
Ill. Overriding Considerations
The City, after balancing the specific economic, legal, social, technological, and other
benefits of the proposed Trails at Santiago Creek Project, has determined that the
unavoidable adverse environmental impact identified above may be considered acceptable
due to the following specific considerations that outweigh the unavoidable, adverse
environmental impact of the proposed Project, each of which standing alone is sufficient
to support approval of the Project,in accordance with CEQA Section 21081(b) and CEQA
Guideline Section 15093.
1. The Project provides 128 single-family housing units in the City of Orange which
will assist the City in meeting its fair-share housing allocation imposed by the
Southern California Association of Governments. The Project will locate
082654\10786529v1 2
residential units on the southern portion of the site,thereby preserving the maj ority
of the site for open space, recreation, and greenway uses.
2. The Project provides approximately 68.5 acres of open space and recreation,
including open space improvements,which will increase recreational opportunities
in the City. On the Property, 12.6 acres that are currently zoned low density
residential will be rezoned to open space as part of the Project. The Project will
enhance and protect the Santiago Creek corridor and will provide a network of
interconnected trails that provide access to Santiago Creek and Santiago Oaks
Regional Park. Trails will be preserved and will be open to the public. The
Development Agreement specifies that the Applicant will contribute $4.1 million
to construct greenway improvements for Santiago Creek, $1 million for trail
improvements in East Orange, and $2 million for equestrian and recreational
purposes.
3. The Project, pursuant to the Development Agreement, provides funding for the
community's acquisition of the Ridgeline property, which will provide the
community with an additional approximately 50 acres of open space.
4. The Project is consistent with the goals and policies of the City's General Plan,the
Orange Park Acres Plan, and the East Orange Plan.
5. Project implementation would eliminate the sand and gravel operation on the
property and abate potentially hazardous soil conditions on the Property.
6. Project implementation would provide a circulation system that minimizes adverse
effects on local residential neighborhoods. Project implementation would improve
local circulation by widening East Santiago Canyon Road and restriping Cannon
Road.
7. Project implementation would generate revenue to the City of Orange as a result of
property taxes and related fees from the proposed residential development. The
revenue could be used by the City to provide public services and facilities,
including fire and police protection and other amenities and services available to
the residents of the City. Project implementation would result in school impact fees
to the City to fund capital improvements to school facilities. Further, Project
implementation will provide the City with fair share fees to restripe the northbound
approach of Orange Park Boulevard at East Santiago Canyon Road to provide one
exclusive left-turn lane and one shared left-turn/right-turn lane.
8. Project implementation would slow,reduce,and meter the volume of runoff leaving
the site.
082654\10786529v1 3
ATTACHMENT C
OTHER PROJECT RELATED CONDITIONS
Trails at Santiago Project
082654\10786529v1 4
GENERAL PLAN AMENDMENT NO. 2018-0001
RESOLUTION NO. PC 08-19
A RESOLUTION OF THE PLANNING COMMISSION
RECOMMENDING TO THE CITY COUNCIL OF THE
� CITY OF ORANGE APPROVAL OF GENERAL PLAN
AMENDMENT NO. 2018-0001, A REQUEST TO CHANGE
THE GENERAL PLAN DESIGNATION OF AN
APPROXIMATELY 109.2 ACRE SITE FROM LOW
DENSITY RESIDENTIAL (LDR) (APPROXIMATELY 15.4
ACRES), RESOURCE AREA (RA) (APPROXIMATELY 77.3
ACRES), AND OPEN SPACE (OS) (APPROXIMATELY 16.5
ACRES) TO LOW DENSITY RESIDENTIAL (LDR)
(APPROXIMATELY 40.7 ACRES), AND OPEN SPACE (OS)
(APPROXIMATELY 68.5 ACRES) ON A SITE
COMMONLY REFERRED TO AS SULLY MILLER
LOCATED AT 6145 E. SANTIAGO CANYON ROAD,
PREVIOUSLY IDENTIFIED AS 6118 EAST SANTIAGO
CANYON ROAD.
Moved by Commissioner Willits and seconded by Commissioner Glasg,ow that the
following resolution be adopted:
WHEREAS, the Planning Commission has authority per Orange Municipal Code
(OMC) Sections 17.10.10 and 17.10.20 to make recommendations to the City Council to take
action on General Plan Amendment No. 2018-0001; and
WHEREAS, General Plan Amendment No. 2018-0001 was filed for the Trails at
Santiago Creek project in accordance with the provisions of the City of Orange Municipal Code;
and
WHEREAS, General Plan Amendment No. 2018-0001 was processed in the time and
manner prescribed by state and local law; and
WHEREAS, the Planning Commission has recommended that the City Council certify
and adopt Environmental Impact Report No. 1857-18, which was prepared to analyze the
potentially significant environmental impacts of the proposed Trails at Santiago Creek project
located at 6145 East Santiago Canyon Road (hereinafter referred to as the "Project"), including.
General Plan Amendment No. 2018-0001; and
WHEREAS, the Planning Commission conducted a duly advertised public hearing on
July 15, 2019, at which time interested persons had an opportunity to testify either in support of
or opposition to the Project, including General Plan Amendment No. 2018-0001.
NOW, THEREFORE, BE IT RESOLVED that the Planning Commission recommends
that the City Council approve General Plan Amendment No. 2018-0001 based on the following:
SECTION I:
The existing general plan land use designation is depicted on the map attached hereto as
Exhibit "A" and incorporated herein by reference. The City of Orange General Plan is hereby
amended in order to change the general plan land use designation by amending the land use
designations on the sites depicted on the map attached hereto as Exhibit "B" and incorporated
herein by reference.
SECTION II:
The proposed General Plan Amendment would change the current land use designation
for the Project site from Low Density Residential (LDR) (approximately 15.4 acres), Resource
Area (RA) (approximately 77.3 acres), and Open Space (OS) (approximately 16.5 acres) to Low
Density Residential (LDR) (approximately 40.7 acres), and Open Space (OS) (approximately
68.5 acres). In 1973, the City Council adopted Resolution 3915, which adopted the Orange Park
Acres Plan to be included in the land use element of the General Plan for the City of Orange.
Since the adoption of the Orange Park Acres Plan, the Project site has been designated as Open
Space in the Orange Park Acres Plan area. Despite the fact that no amendment to the Orange
Park Acres Plan took place, a land use map originally adopted by the City as part of a City-wide
1989 General Plan update designated the Site as Resource Area, and Open Space. This was also
reaffirmed by the City-wide 2010 General Plan. The East Orange General Plan was adopted in
1976. Since the adoption of the East Orange General Plan, the Project site has been designated as
Regional Park in the East Orange General Plan area. The land use map originally adopted by
City as part of a City-wide 1989 General Plan update designated the Site as Resource Area, and
Open Space. This was also reaffirmed by the City-wide 2010 General Plan. The proposed
project entitlements, including this General Plan Amendment, would amend both the East
Orange General Plan and Orange Park Acres Plan to incorporate the Trails at Santiago Creek
Specific Plan. By doing so, the Project would be included as part of these two existing plans,
which would create vertically consistent documents that cover and include the proposed project.
I hereby certify that the foregoing resolution was adopted on July 15, 2019, by the Planning
Commission of the City of Orange by the following vote:
AYES: Commissioners Glasgow,Martinez, Simpson,and Vazquez
NOES: Willits
ABSTAIN: NONE
ABSENT: NO
Ernest Glasgow, Planning Commi ion Chair
� ` C� - Zl�p �
Date
2
,ZONE CHANGE NO. 1286-18
RESOLUTION NO. PC 09-19
A RESOLUTION OF THE PLANNING COMMISSION
RECOMMENDING TO THE CITY COUNCIL OF THE
CITY OF ORANGE APPROVAL OF ZONE CHANGE NO.
1286-18, A REQUEST TO CHANGE THE ZONING FROM
SAND AND GRAVEL (S-G) AND SINGLE FAMILY
RESIDENTIAL 8,000 SQUARE FEET MINIMUM (R-1-8)
TO SPECIFIC PLAN (SP) CONSISTING OF SINGLE
FAMILY RESIDENTIAL R-1-8 AND R-1-10, AND OPEN
SPACE ON A SITE COMMONLY REFERRED TO AS
SULLY MILLER LOCATED AT 6145 E. SANTIAGO
CANYON ROAD, PREVIOUSLY IDENTIFIED AS 6118
EAST SANTIAGO CANYON ROAD.
Moved by Commissioner Vazquez and seconded by Commissioner Simpson that the
following resolution be adopted:
, WHEREAS, the Planning Commission has authority per Orange Municipal Code(OMC)
Section 17.10.20 to make recommendations to the City Council to take action on Zone Change
No. ZC 1286-18; and
WHEREAS, Zone Change No. 1286-18 was filed for The Trails at Santiago Creek in
accordance with the provisions of the City of Orange Municipal Code; and
WHEREAS, Zone Change No. 1286-18 was processed in the time and manner prescribed
by state and local law; and
WHEREAS, the Planning Commission has recommended the City Council certify and
adopt Environmental Impact Report No. 1827-11, which was prepared to analyze the potentially
significant environmental impacts of the Trails at Santiago Creek located at 6145 East Santiago
Canyon Road (hereinafter referred to as the"Project"), including Zone Change No. 1286-18; and
WHEREAS,the Planning Commission conducted a duly advertised public hearing on July
15, 2019, at which time interested persons had an opportunity to testify either in support of or
opposition to the Project, including Zone Change No. 1286-18.
NOW, THEREFORE, BE IT RESOLVED that the Planning Commission recommends
that the City Council approve Zone Change No. 1286-18 based on the following findings:
1'. The existing zoning is depicted on the map attached hereto as Exhibit "A" and
incorporated herein by reference. The Orange Municipal Code is hereby amended in
order to change the zoning classification by amending the zoning on the sites depicted
on the map attached hereto as Exhibit"B" and incorporated herein by reference.
2. The proposed zone change would make the Projects zoning consistent with the General
Plan Amendment to change the land use designation for the Project site from Low
Density Residential (LDR) (approximately 15.4 acres), Resource Area (RA)
(approximately 77.3 acres), and Open Space (OS) (approximately 16.5 acres) to Low
Density Residential (LDR) (approximately 40.7 acres), and Open Space (OS)
(approximately 68.5 acres), as required by law.
3. The proposed zone change would allow the implementation of the proposed Specific
Plan consisting of Single Family Residential R-1-8 and R-1-10,and Open Space,which
contributes to the implementation of the General Plan Amendment.
SECTION 1 —CONDITIONS OF APPROVAL
BE IT FURTHER RESOLVED that the following conditions are imposed with approval:
1. Prior to the issuance of any regulatory permits, the developer shall submit for review and
approval a habitat mitigation and monitoring plan or ongoing maintenance plan for the
open space areas associated with the long term stewardship of the Greenway Open Space,
Santiago Creek, the Grassland, and trails to the City of Orange, Orange County Parks, the
Department of Fish and Wildlife,and any other regulatory agency having jurisdiction over
the affected open space area.
2. Prior to development plan submittal and approval, the developer shall coordinate with
the Irvine Ranch Water District's Planning and Technical Services Division to develop
a technical memorandum or Sub-Area Master Plan Addendum for the project.
3. Prior to development plan submittal and approval, the developer shall coordinate with
the Metropolitan Water District to avoid potential conflicts with the Metropolitan
Water District's rights-of-way by following Metropolitan Water District established
requirements, including the submittal of design plans for any activity in the area of the
Metropolitan Water District's pipelines or facilities.
4. Prior to issuance of any regulatory permits, the developer shall submit for review and
approval signal modifications and lane configuration improvements to the City of
Orange. In the case of Orange Park Boulevard and Santiago Canyon Road (project
impacted intersection#5),the applicant shall also submit signal modifications and lane
configuration improvements for review and approval to the County of Orange. The
County of Orange will participate in the review and approval process of any mitigation
design.
5. Prior to the approval of a tentative tract map, the applicant shall enter into a Pre-
Development Memorandum of Understanding with the City of Orange, County of
Orange, or any other agency/organization for the long term stewardship of the of the
Greenway Open Space, Santiago Creek, the Grassland, and trails. The Pre-
2
Development Memorandum of Understanding shall include, but not be limited to
provisions for design requirements and standards, long-term maintenance, habitat
protection, and establishment of an endowment or other funding mechanism for the
management and maintenance of such facilities in perpetuity.
6. Prior to the issuance of grading permits,the developer shall submit to County of Orange
Public Works and County of Orange Flood Control for review and comment on the
adequacy/inadequacy of existing facilities to accept storm water and urban runoff flows
to Santiago Creek.
I hereby certify that the foregoing resolution was adopted on July 15, 2019, by the Planning
Commission of the City of Orange by the following vote: �
AYES: Commissioners Glasgow, Martinez, Simpson, and Vazquez
NOES: Commissioner Willits
ABSTAIN:N
ABSENT•
E est las o , anning ommission Chair
� / � - Z� �/ �
Date
3
DEVELOPMENT AGREEMENT NO. 0005-18
RESOLUTION NO. PC 10-19
A RESOLUTION OF THE PLANNING COMMISSION
RECOMMENDING TO THE CITY COUNCIL OF THE
CITY OF ORANGE APPROVAL OF DEVELOPMENT
AGREEMENT NO. 0005-18 ON A SITE COMMONLY
REFERRED TO AS SULLY MILLER LOCATED AT 6145
E. SANTIAGO CANYON ROAD, PREVIOUSLY
IDENTIFIED AS 6118 EAST SANTIAGO CANYON ROAD.
Moved by Commissioner Martinez and seconded by Commissioner Glas ow that the
_, following resolution be adopted:
WHEREAS, the Planning Commission has authority per Orange Municipal Code (OMC)
Section 17.44.100 to make recommendations to the City Council to take action on Development
Agreement No. 0005-18; and
WHEREAS, Development Agreement No. 0005-18 was filed by Milan REI X LLC in
accordance with the provisions of the City of Orange Municipal Code; and
WHEREAS,Development Agreement No. 0005-18 was processed in the time and manner
prescribed by state and local law; and
WHEREAS, the Planning Commission has recommended the City Council certify and
adopt Environmental Impact Report No. 1857-18, which was prepared to analyze the potentially
significant environmental impacts of the proposed Trails at Santiago Creek project located at 6145
East Santiago Canyon Road, including Development Agreement No. 0005-18; and
WHEREAS,the Planning Commission conducted a duly advertised public hearing on July
15, 2019, at which time interested persons had an opportunity to testify either in support of or
opposition to the Project, including Development Agreement No. 0005-18.
NOW, THEREFORE, SE IT RESOLVED that the Planning Commission recommends
that the City Council approve Development Agreement No. 0005-18 based on the following
findings:
1. Is consistent with the objectives,policies, general land uses, and programs specified in
the General Plan and any applicable specific plan or redevelopment plan.
The Development Agreement and related enhanced public benefits offered in conjunction
with the Trails at Santiago Creek project(General Plan Amendment No. 2018-0001, Zone
Change No. 1286-18) are consistent with the objectives, policies, general land uses, and
programs specified in the General Plan and any applicable specific plan or redevelopment
plan.
The General Plan Housing Element calls for the City to encourage the production of infill
housing, and recognizes the ongoing long-term demand for increased housing inventory in
the community to serve a variety of citizens through providing diversified housing types
and costs. In addition, the Natural Resources Element calls for the City to provide
recreational use and the protection of natural resources and features in open space areas by
promoting development of additional open spaces and access points adjacent to waterways
and planned trails.
2. Is compatible with the uses authorized in the district or planning area in which the real
prope�ty is located.
The Development Agreement and related enhanced public benefits offered in conjunction
with the Trails at Santiago Creek project(General Plan Amendment No. 2018-0001, Zone
Change No. 1286-18)is compatible with the uses authorized in the district or planning area -
in which the real property is located in that the area is characterized,in part,by surrounding
land uses such as single family residential and Santiago Oaks Regional Park.
The Development Agreement will support the associated General Plan Amendment and
Zone Change that offers public improvements and recreation open space in the form of the
acquisition of Ridgeline Golf Course, funding for equestrian and recreational purposes,
funding for the Greenway,funding for Trail Improvements,and Circulation Improvements.
3. Is in conformity with the public necessity, public convenience, general welfare, and
good land use practices.
The Development Agreement and related enhanced public benefits offered in conjunction
with the Trails at Santiago Creek project(General Plan Amendment No. 2018-0001, Zone
Change No. 1286-18)are consistent with public necessity,public convenience,and general
welfare through the added pedestrian safety along Santiago Canyon Road, trail linkage,
construction of sidewalks where none currently exist, as well as traffic signal and
intersection improvements.
- The Development Agreement will support the associated General Plan Amendment and
Zone Change in that the Trails at Santiago Creek project will provide a recreational trail
system that avails the open space areas and the Santiago Greek environs to the community
of Orange and the general public at large,as well as the project's residential neighborhood,
and becomes an integral part of the City and County trail master plans via connectivity
opportunities.
4. Will be beneficial to the health, safety, and general welfare consistent with the policy
of the City with respect to development agreements as provided in Section 17.44.200.
2
The development of the approximately 109 acre site removes the current sand and gravel
use that is not compatible with the existing surround residential and open space uses in the
area. The proposed project involves the development of 128 dwelling units on
approximately 40.7 acres and approximately 68.5 acres will comprise natural hillsides, re-
established grasslands, a restored Santiago Creek riparian corridor and a managed
vegetation/fuel modification zone.
5. Will not adversely affect the orderly development of property in the City.
The Development Agreement and related enhanced public benefits offered in conjunction
with the Trails at Santiago Creek project(General Plan Amendment No. 2018-0001, Zone
Change No. 1286-18) through the Trails at Santiago Creek Specific Plan, will ensure that
it is compatible with the existing development of the surrounding area, in that the Specific
Plans calls for development of single family residences and open space.
I hereby certify that the foregoing resolution was adopted on July 15, 2019, by the Planning
Commission of the City of Orange by the following vote:
AYES: Commissioners Glasgow, Martinez, Simpson, and Vazquez
NOES: Commissi er Willits
ABSTAIN:N
ABSENT:
Erne lasgow, Pl i Co ission Chair
_ �g _ 2�f �
Date
3