03.13 Advertise Bids CDBG FY 18-19 Street Rehabilitation �or o�
�ti•t.�a�o���arFa`.�'G�
*r L?a AGENDA ITEM
�1��• �
�'E•�a s,�GPJ.�
u� July 9, 2019
TO: Honorable Mayor and Members of the City Council
THRU: Rick Otto, City Manager �
FROM: Christopher Cash, Public Works Director� .
Bill Crouch, Community Development Director
REVIEW: City Man ger Finance���
1. SUBJECT
Approval of plans and specifications for SP-4089; Community Development Block Grant
Fiscal Year 2018-2019 Maple Neighborhood, Sacramento Neighborhood and Palm
Avenue, Street Rehabilitation and authorization to advertise Bid No. 189-41.
2. SUMMARY
Plans and specifications have been completed and the project is ready to be advertised
for bids. The total estimated construction cost including 15% for contingencies and
construction engineering is $744,600.
3. RECOMMENDED ACTION
Approve plans and specifications and authorize advertising for bids for the Community
Development Block Grant Fiscal Year 2018-2019 Maple Neighborhood, Sacramento
Neighborhood and Palm Avenue, Street Rehabilitation project.
4. FISCAL IMPACT
The total expenditure for this contract is $623,314 and will be funded through Community
Development Block Grant (310):
Maple Neighborhood Street Rehabilitation (30103) $307,608
Sacramento Neighborhood Street Rehabilitation (30104) 174,946
Palm Avenue Street Rehabilitation (30105) 140,760
Total: $623,314
5. STRATEGIC PLAN GOALS
Goal 1: Provide for a safe community
b: Provide and maintain infrastructure necessary to ensure the safety of the public.
Goal 4: Provide outstanding public service
b: Provide facilities and services to meet customer expectations.
ITEM 3. �3 � 07/09/2019
6. DISCUSSION AND BACKGROUND
The federal Community Development Block Grant Program (CDBG) provides grant funds
to enable eligible localities to construct public improvements in Low and Moderate Income
Areas within their jurisdiction. Eligible activities include infrastructure upgrades such as
street improvements. The proposed streets improvements in the Tularosa and West
Palmyra Avenue neighborhood qualify for CDBG funds and have been selected for
rehabilitation and reconstruction. The street segments are:
Mt Vernon Avenue -West end to Sacramento Street
Martha Avenue -West end to Sacramento Street
Sycamore Avenue -West end to Sacramento Street
Palm Avenue -West end to Sacramento Street
Dana Place -West end to Sacramento Street
Palm Avenue - Milford Road to Handy Street
Maple Avenue - Prospect Street to Olympia Way
Olympia Way- Maple Avenue to Spring Street
, Vine Street -West end to Olympia Way
Shasta Street - North end to Maple Avenue
Dunas Street - North end to Maple Avenue
These streets were rated in the Citywide Pavement Management Program with a
Pavement Condition Index (PCI) ranging from 14 - 59 (out of a maximum score of 100)
indicating the need for street rehabilitation. The scope of street rehabilitation includes:
ADA compliant access ramps, localized removal and replacement of the existing
pavement, asphalt concrete overlay, roadway widening, improvement of drainage inlets,
removal and replacement of failed sections of curb and gutter, driveways, sidewalks,
cross gutters, spandrels and adjustment of manholes and water valve covers to grade.
The total project cost estimate is $744,600 including 15% for contingencies and
construction engineering. At the time bids are received and actual bid prices are known,
staff may request an additional appropriation, if necessary, to award the contract.
The proposed project is categorically exempt from the provisions of the California
Environmental Quality Act (CEQA) under CEQA guidelines Section 15301 "Existing
Facilities" Class 1. The CEQA Notice of Exemption will be filed with the County Clerk's
Office upon Council's approval of the plans and specifications. The proposed project is
also categorically excluded from the provisions of the National Environmental Policy Act
(NEPA) under 24 CFR Section 58.35. Documentation of this determination is on file.
Construction is scheduled to begin in September 2019 and is expected to be completed
within 60 calendar days.
Specifications and cost estimates are available for review in the Public Works
Department.
7. ATTACHMENT
• Location Map
ITEM 2 07/09/2019
�- R p �- o f- SYC
� DAL LN W �
W Q `�
a �
� > PALM AVE
O
a CHI IN ONE LN
LOCHLEVEN LN
SPRING ST
�-----------------------��.-----ry SPRING ST
; ----
� VINE AVE ;
- o = ,
I '
S
a =
; c~n t— � ,
� Q � Q �
_ ' 4 Z � i
� � i � � O i
� �
� �
�
� ------11AA'�tE'RV�'-------------=
�
�
v
a
0
a
CH AN AV
CHAPMAN AVE
w
�
0
�
� CENTURY A
LOCATION MAP
THOMAS GUIDE Page 500, B4 CITY OF ORANGE - PUBLIC WORKS - ENGINEERING
---���� Service Area
�� Residential Overlay MAPLE NEIGHBORHOOD STREET REHABILITATION
Attachment"A"-Exhibit 1
Page 1 of 1
� r- MAYFAI VE p = C7 MO AVE
� �
Ng o MAYFAIR AVE a � �
�
yO N �
�
� Z US
� � b c', y EVERETiFL
CARRiE � Z Z Z NQ MAYFAfR AVE
� U � W S
N LL
O
Z
g ROSE � ROSE AVE
� � w
_
�
�
� HAMILTONAVE ROSEAVE F �
Z HAMILTON AVE �
W ORANGE GROVE VE �
ANGE GROVE AVE � � O
a � ORANGE GftOV VE
U �
N ~ ORANGE GROVE A
MAOISON AVE �
J
� v m MADISON AV
Y a
d MAOISON AVc W �
��A`""T �E ALNUT AVE �
-
� ~ L�c
T`� 1 ,��, y� ��
Rry�'1'AV p,vE I, s� �y �
F �yN� �� °T o
M�JE F � � L o
z '- � > Z �� n m
� m a � � P
QMARTHA AVE � p = LL r NB ♦
a w MARTHAA � ? � �o� PO��E �
u f ��
y� � �l�'J� e a � R
� �� 1 d� �
SYCAMOR SYCAMOR VE � w
CAMORE AVE Z I� O
w �
� a � I �
, a
� �
Z g PALM AV N p PALM AYE ���
� _ � J �I LOC
�1, z c� 1 � ��
„ � _ � �I
� a � q q � � Z VINE AVE
�ANA PL ; N A� 6ANA AV ,��`, KILIINGSWOR?H AVE o Z o �
� II� W a
x ~¢
a Y M PLE AVE w
1 y� �,, � _
' Q„O I ERMAN AVE `�
/ �c� ��, �
j �� w
; �� � = ENNETTAVE �
; �, a � PEARLAVE
� �
� ,�, O w
' 8 ¢
�� �
CHAPMAN AVE
�
<
Z
w
¢
N ALMONDAVE � ALMONDAVE
Q
m ��
�
�. BURIY AVE
� � � z
? O W Z C7 2 Z N
J Q W '� F-
LOCATION MAP CITY OF ORANGE - PUBLIC WORKS - ENGINEERING
THOMAS GUIDE Page 800,A3,A4
������� Service Area
�� Residential Overlay SACRAMENTO AVE PAVEMENT REHABILITATION
Attachment"A"-Exhibit 1
Page 1 of 1
J N MAVFAI VE , _ � '�'� ..
s �
= oo MAYFAIRAVE � �
`� � ¢
a u�i
� � z �
� � � p N EVERETTPL
� z �" MAYFAIRAVE
� CARRIE � v i w c
N LL �
�
�d � � ROSE AVE
_ � ROSE W
�
S �
T�
N �
H �
0 HAMiLTON AVE ROSE AVE �
�" HAMILTON AVE Q
Z
w
ORANGEGROVE E Z O
ANGE GROVE AVE � f- ORANGE GROV VE
�
¢ O �� �
MADISCN AVE � ORANGE GROVE AV
� `� oi MA�ISONA'
Y � �a MADiSON AVE �
'""�"�T E ALNUT AVE
� �r
�� � yc
r ��� y� e `��
`�R�O�q�E ON PJ� �� � �� O
t J�� F- N � O�
M N Z � A � m
? V u�i Zp W 7 P
QMARTFiA AVE �4 O = � � �
� MARTHA z r }aC1 P�pKE C
U /j"
! '�d�'��j s � N R
~ e-��~ � �l/ W
SYCAMOR � 5YCAMOR VE �`
CAMORE A'JE iz ,I, O
o = � o p� �
J q ; PAIM AV � p PALM AVE ,��� LOC
T Y = � � ���
M � � �� Z VINE AVE
o�nniAPL � �AA� DANAAVE ,��,, KILLINGSWORTHAVE � Z o
� � � i v�i
, � � M LE AVE �
� 5~ �,,, � v�i
, �O ,I ERMAN AVE
i �o ,I � -
I �
I, � �
_ , � = eNNFrrave
� r 3 PEARLAV'c
1 I� a �
� �� o w
�� � �
��_
CHAPMAN AVE
�
Z
W
J
oi � ALMOND AVE
ALMOND AVE
�
y BURLY AVE
d' �
� � 0 3
�' J a
rr� Z Z �1
J a W W Y w J �
LOCATION MAP CITY OF ORANGE - PUBLIC WORKS - ENGINEERING
THOMAS GUIDE Page 800, A3,A4
�—����� Service Area
�� Residential Overlay PALM AVE STREET REHABILITATION
Attachment"A"•Exhibit 1
Page 1 of 1