2. SUMMARY
This Contract Change Order authorizes contract payment for extra work at the agreed cost for the
Cambridge Storm Drain Project in the amount of $109, 581.
13. RECOMMENDED ACTION
Approve Contract Change Order No. 2 in the amount of $109,581 to Garrett J Gentry
Engineering for the additional work.
4. FISCAL IMPACT
The total expenditure for this change order is $109,581 and will be funded in the Cambridge
Storm Drain Project (20323) through Sanitation and Sewer (220).
5. STRATEGIC PLAN GOAL(S)
1. Provide for a safe community -
b. Provide and maintain the infrastructure necessary to ensure the safety of the public
4. Provide outstanding public service —
b. Provide facilities and services to meet customer expectations.
ITEM 3.1 -1 1 10/09/18
6. GENERAL PLAN IMPLEMENTATION
Infrastructure Element Goal 3.0: Ensure adequate maintenance of public rights -of -way to
enhance public safety and improve circulation.
Policy 3.1: Continue to maintain and repair sidewalks and pavement surfaces on public rights -
of -way.
7. DISCUSSION and BACKGROUND
The City Council awarded the Cambridge Storm Drain Project on May 8, 2018, to Garrett J
Gentry Engineering. Due to an unforeseen utility conflict with an AT&T utility duct bank, the
project plans were modified to accommodate and protect the AT&T facility in place. This
unexpected change to our storm drain alignment has resulted in a loss of production and
additional work costs.
The staff has contacted AT&T regarding the utility conflict and has asked that they reimburse the
City for this extra cost to protect the AT&T facility in place. The City sent AT&T utility
notifications prior to the start of the project and they did not indicate any conflict with the City's
proposed storm drain alignment. AT&T's actual facility location in the field is different from
what was shown on the utility map, so the City's extra cost incurred by revising the construction
plan and change order should be reimbursed by AT&T per the franchise agreement.
The original contract amount was $1,064,925. This Contract Change Order represents a 10.29%
increase from the original contract amount bringing the final contract amount to $1,174,506.
8. ATTACHMENTS
• Contract Change Order No. 2
ITEM 2 10/9/18
City of
t4 �� PC
Public Works Department
CONTRACT CHANGE ORDER NO.2
PROJECT: Cambridge Storm Drain Project
PROJECT NO: 178J21D471
CONTRACTOR: ca..e. I V...,... u_a___�__r__
- - ---- - - uste: 8r27iW 18
You we hereby directed to make the herein described changes Gam the plans and specifications or do the following described work not included in the plans and specifcatons on this contract
NOTE: This change order is ant eQative until approved by the City Engineer.
Description ofwark to he done, an estimate of quanHlies, and prices to be paid Segregate bctwmn additional work at the hxntmct price, agreed price and force account Unless otherwise stated, rates
farremal of equipment cover only such amen equipment is actually used and no allowance will he made for idie time-
s following work is added or deleted, as applicable, from the contraetus a change ordain aceordancewith the provisions of Section 3 of the contract specifications, The method ofpayment shall be
as described far each item of this change order. The following work is added or deleted, m applicable, Sum the contract as a change order in acconlaneewith the p:ovisitins orSection 3 ufthe crnttaet
specification The method ofpoymenl shall be m described for each item afthis change arder
DESCRIPTION UNIT UNIT ORIGINAL ORIGINAL FINAL QUANTITY Increase (Decrease)
OFWORK
PRICE Dr.SCRIPTIO\ QUANTITY AMOUNT QUANTITY AMOUNT UANTITY AMOUNT
Loss of production caste due to AT&T
duct bank Existing location of AT&T
I duct bank prevented Garret J Gentry §60,000 00 LS 1 S60,00000
Corm utilising a trench shield See1 S60,000 00 1 $60,000 00
attached letter
ddidanal Manhaloa required as
-
2
ceded to avoid the AT&T dun bank
S16,52700
EA
0
SI6,527,00
3
316.52700
3,
S49,581D0
3
Fl Additional Calendar Da
21
DAYS
-
PROJECT TOTAL: $109 981 AO
Original Contract Amount: S1,064,925.00 Original Contract Time: 60
New Contract Amount Including
Contract Change Order: St,174,506.60 Original Agrement Date: 5182018
Change from Original Contract
Amount in Pereantages 10% Original Completion Dal= 8131/2018
. Time Extension per the CCO: 9212019-
Viangetc eatedlrw:- Apprvrycd. L�
Projeu Manager
Ci glineer
A off' Approval as to form:
Cho• Manager (if Applicable)
City Attorney
e campenaation (time and cost) set forth in this Change Order constitutes the total compensation due to the Cantraclor, all Subcontractors, and all suppliers, for thework or change defined in this
(7tangc Order, including all impacts an any unchanged work. By signing this Change Order, die Connector- acknowledges and agrees, on behalf orhimself, all Subcontmelors,and all suppliers, drat Ih
upulhne l compensation includes payment far all work contained in this Change Order, plus all payment for the rnlenuption of achedulrs, extended overhead costs, delays, and all impacts, ripple ellfr u
at cumulative impacts an all other work under this Contract, 77m signing ol'this Chenille Oh der shall indicate dint We Changu Order constitutes a Hill mutual accord and satisfaction for die change and
that the time andfur cost under the Change Order hanislitulq the total equitable adjustment owed the Contractor, all Subcontractors, and all supplies, as a result of the change The Contractor, on trehaif
m orhircif. oil Subcontractors, and supplies, agrees to waive all rights, widhout exception or reservation army kind whatsoever, to file any further claim or mquast for equitable adja tri—L army type.
for any reasonably farr:sceuble cause that shall arise cut of or as a result of this Change Order or the impact afthis Change Order an the.cmainder of the work under this Contract
Wc.the undersigned Contractor.lave given atefui emwalemlinn to the chengo proposed and heruby agree,,ifthis proposal is nppmved, out we will provide all equipment, famish all malaials, except'
m may otherwise be noted above, and pe fool all services necessary for the work above specified, and will accept us full payment, including all ovethead and hands.11heheforc the prices we shown
above
Acca�/ nca Date: oo.
Contractor:
8: Tide: s-
Contractor does not signify accepb ma: afthis order, his attention is directed to the requirements ol'the specifications as to proceeding with the under work sod filing a written pretest within the
If the Contractorme
titherein specified.
ere,
G.J. Gentry General Engineering; Inc.
1297 W 9th Street
Upland, CA 91786
909=693=3391
Lid. #A991354
DIR #1006645135
To: City Of Orange Contact:
Address: Public Works Department, 300 E. Chapman Ave. Phone: (714) 744-5544
Orange, CA 92866-1591 Fax:
Project Name: Cambridge Ave. Stone Drain (CO273-04) Bid Number:
Project I. oration: Bid Date: 8/14/2018
tern # Item Description Estimated Quantity Unit Unit Price Total Price
700-01 Alternate Pricing: 1.00 LS $60,000.00 $60,000.00
Excavate And Install 8" VCP Sanitary Sewer Mainline
(Placed Approx. 3' West Of Proposed Centerline To Avoid
Conflicts Associated With 72" Stone Drain Mainline
Operations). The Sole Purpose Of This Relocation Is To
Accommodate AT&T's Conflicting Duct Bank.
700-02 Additional Manholes Required As Needed To Avoid AT&T 3.00 EACH $16,527.00 $49,581.00
Conflicts. Manholes Installed Per City Of Orange Std. 408
Total Bid Price: $109,581.00
Notes:
• Exclusions: All permits, bonds, testing engineering, staking, fees, prevailing wage, unforeseen subsurface material, dewatering, shoring or sharing
support, SWPPP implementation or mantenance, noise screening, utility relocation, structural excavation and/or bacidill, wet materials, blasting,
geogrid, subdrains, drainage, wall backdrains, wall waterproofing, fencing, dust controll after hours/weekends or overtime, handling of oversized or
hazardous materials, landscape relocation, traffic control/traffic engineernig, attached/soft demolition, subsurface utility demo or relocations,
petromat, paving, striping, signage, construction water development/costs, street sweeping unless importing or exporting, spoils from other trades,
topsoil, import or export of materials.
• This proposal is good for 60 days from submittal date.
• Proposal & qualifications must be accepted as a part of the contract, and so specified if a special contract forth is used.
• DIR#1000045135
Uc: 991354
ACCEPTED:
The above prices, specifications and conditions are satisfactory
and hereby accepted.
Buyer:
Signature:
Date of Acceptance:
CONFIRMED:
G.3 Gentry Engineering Inc
Authorized Signature:
Estimator:
8/17/2018 7:24:07 AM Page 1 of 1
To: The City of Orange
Public Works Department
Attn: Bryan MezaSave
RE: AT&T conflict from station 9+89 thru station 16+43
Bryan,
1297 West 9th Street, Upland CA 91739
Phone: (909) 693.3391 Fax: (909) 899-4108
August 15, 2018
This letter is to notify you of the loss of production and the costs incurred caused by AXI s mismarked duct bank being in our way.
We originally bid this project at a production rate of 100' LF per day pulling a shield. Due to This duct bank being located one foot
inside the pipe zone.of proposed 72" RCP Storm Drain there is not enough room to utilize a shield. Therefore, hydraulic shoring must
now be used slowing our production rate to approximately 32' LF per day. In addition ... the existing manhole bases are also in conflict
with the proposed storm drain causing the need for additional manholes to be built. The cost incurred are reflected on Change Order
#273-04 Dated 8/14/2018 Total Price: $109,581.00
Sincerely,
Steve Miller
Chief Estimator
G.J. Gentry General Engineering, Inc.