03.22 Batavia Pipeline Renewal Project1. SUBJECT Bid No. 189 -01; Batavia Street & Railroad Crossing Pipeline Renewal Project (W -686); Approval of the project plans and specifications and authorization to advertise for bids. 2. SUMMARY Plans and specifications have been completed for the Batavia Street & Railroad Crossing Pipeline Renewal Project. This project is ready to be advertised for bids. The total estimated construction cost including 15% for contingencies is $300,000. 3. RECOMMENDED ACTION Approve plans, specifications, and authorize advertisement for bids on the Batavia Street & Railroad Crossing Pipeline Renewal Project. 4. FISCAL IMPACT 7=1 Funds are budgeted and are available in the following account: 600.8041.56451.18400 Pipeline Renewal Projects $ 1,900,000 5. STRATEGIC PLAN GOAL(S) 1. Provide for a safe community: b. Provide and maintain the infrastructure necessary to ensure the safety of the public. 2. Be a fiscally healthy community: d. Effectively manage and develop City assets. 4. Provide outstanding public service: b. Provide facilities and services to meet customer expectations. 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 6.0: Ensure water, sewer, and storm drain systems that meet the needs of residents and businesses. Policy 1.1: Provide sufficient levels of water, sewer, and storm drain service throughout the community. Economic Development Element Goal 6.0: Provide sufficient infrastructure to support anticipated economic development and growth. Policy 6.1: Provide public improvements to support commercial, industrial and institutional uses. 7. DISCUSSION and BACKGROUND The existing water main on Batavia Street under the railroad tracks was constructed in the early 1960s. This water main is aging and considered undersized by current water industry standards. The continued deterioration of the existing water main along with the recent water main breaks has forced the Water Divison to shut off and isolate this segment of the water main. Because the system main is crossing the railroad tracks, Water Division staff is unable and unequipped to safely make the repairs. The scope of work includes the replacement of approximately 500 linear feet of existing 6" Cast Iron Pipe with new 12" and 8" Ductile Iron Pipe. To meet the railraod's requirements, approximately 95 linear feet of the new 12" main will be encased in a 24" diameter steel casing within the railroad right -of -way. The proposed project will provide more reliable water service and fire protection to the businesses and residents in the area. The total estimated construction cost including 15% for contingencies is $300,000. Upon receipt of public bids, staff will return to the City Council and recommend the award of the contract to the lowest responsible bidder. Construction is scheduled to begin late September 2018 and is expected to be completed within 60 calendar days. 8. ATTACHMENTS • Location Map ITEM 07/10/18 2