03.20 Police Facility Lobby Wall Repairs1. SUBJECT Appropriation of $21,673 from the Police Facility Fees unreserved fund balance for Police facility lobby wall repairs and painting by Orange County Commercial Interiors, Inc. (OCCI). 2. SUMMARY The interior lobby walls of the Police Department facility require repairs and painting due to exposure to extreme heat and rainwater damage. An appropriation of $21,673 from the Police Facility Fees unreserved fund balance is necessary to cover the difference in cost from the Capital Improvement budgeted amount of $8,182, and the OCCI total repair cost of $29,855. 3. RECOMMENDATION Authorize the appropriation of $21,673 from the Police Facility Fees unreserved fund balance to expenditure account number 570.4011.51401.00000, Repairs to Building and Fixed Equipment. 4. FISCAL IMPACT Upon appropriation, funds will be available to cover the cost of the lobby wall repairs as follows: 570.4011.51401.00000 Repairs to Building & Fixed Equipment $21,673 725.4011.56020.12103 Police Facility Interior Painting 8,182 Project Total $29,855 5. STRATEGIC PLAN GOAL(S) la. Provide for a Safe Community: Provide staffing and resources to deliver services that ensure public safety. 6. GENERAL PLAN IMPLEMENTATION Public Safety Goal 6.0 Provide public safety services of the highest quality. Policy 6.1: Provide the Police Department with adequate personnel, equipment, and state- of -the- art technology to effectively combat crime, meet existing and projected service demands, and provide crime prevention programs. These resources should be provided prior to anticipated needs. 7. DISCUSSION and BACKGROUND The Orange Police Department's front lobby operates with five transaction windows that serve the public. The lobby is an expansive area, approximately 4,500 square feet, where people come together to meet, get information, and interact. The Police facility is a two -story building except for the lobby area where walls are continuous, extending beyond the second floor to the glass dome ceiling. The glass dome ceiling does not protect interior walls from exposure to changing weather conditions including extreme heat during the summer and rainwater /moisture during the winter. The exposure to changing weather conditions has deteriorated the original wallpaper, causing the brittle wallpaper to peel from the wall. While most facility improvements can be performed by the City's facilities staff, the maintenance and repair of the lobby walls require an outside contractor. The proposed improvement includes the removal of existing wallpaper, masking, dust control, preparing and sealing the drywall for skim coating, and painting. The contractor shall provide all labor, materials, tools, and equipment to clean, prepare, and repair existing walls. The Department was able to locate three qualified contractors with experience in this type of work; their bids are listed below. V Bid- A*0unt OCCI $28,355 Ashmore Construction $45,000 Avalon Paint & Fine Finishes $57,885 Of the three proposals, OCCI was ranked the best overall. Their proposal in the amount of $28,355 was substantially lower than Ashmore Construction and Avalon Paint & Fine Finishes. The total cost of the repairs is $28,355, a $1,500 contingency is recommended for additional unforseen expenses for a total not to exceed amount of $29,855. As such, the contract will be executed by the City Manager. However, in order for the project to commence, an appropriation of $21,673 is necessary. It is recommended that the City Council appropriate $21,673 from the Police Facility Fees unreserved fund balance. 8. ATTACHMENTS • OCCI Bid ITEM 2 7/10/18