03.20 Water Supervisory Control Data Acquisition1. SUBJECT Bid No. 178 -34; Water Supervisory Control and Data Acquisition ( SCADA) System & Controls upgrade - Approval of plans and specifications and authorization to advertise for bids. 2. SUMMARY Plans and specifications have been completed for the Water SCADA System & Controls upgrade. This project is ready to be advertised for bids. The preliminary cost estimate is $1,530,000. 3. RECOMMENDED ACTION Approve plans and specifications and authorize advertising for bids for the Water SCADA System & Controls upgrade. 4. FISCAL IMPACT Upon approval of the FY 2018 -2019 budget, funds will be available in the following account: 600.8011.56510.18912 Water Plant Telemetry $1,639,000 5. STRATEGIC PLAN GOAL(S) 1. Provide for a safe community: b. Provide and maintain the infrastructure necessary to ensure the safety of the public. 2. Be a fiscally healthy community: d. Effectively manage and develop City assets. 4. Provide outstanding public service: b. Provide facilities and services to meet customer expectations. 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 6.0: Ensure water, sewer, and storm drain systems that meet the needs of residents and businesses. Policy 1.1: Provide sufficient levels of water, sewer, and storm drain service throughout the community. Economic Development Element Goal 6.0: Provide sufficient infrastructure to support anticipated economic development and growth. Policy 6.1: Provide public improvements to support commercial, industrial and institutional uses. 7. DISCUSSION and BACKGROUND The existing SCADA system for the City of Orange Water Division has been in operation for approximately nineteen years. This system is used to monitor and control the entire water system remotely from the Water Division Headquarters or from a remote laptop or tablet. The existing SCADA system is outdated, inefficient, and has limited capability. It does not provide the desired automation and synchronization of the water system to provide a more efficient operation by today's standards. The Water Division is seeking to modernize the existing Programmable Logic Controls (PLCs), radio communication systems, and the programming at all 37 remote sites to improve reliability, serviceability, and communication speed. The scope of work includes the furnishing of all materials, labor, equipment, fuel, tools, transportation, and services for supply, installation, configuration, programming, testing, and commissioning of the proposed Water SCADA System and Controls Upgrade as described in the plans and specifications. The preliminary engineering cost estimate for this project is $1,530,000. Should Council approve the plans and specification, the City will bid the project out. Installation is anticipated to begin in October 2018 and to be completed within 185 calendar days. 8. ATTACHMENTS • None ITEM 2 06/12/18