Loading...
03.26 Orange Park Acres Pavement Maintenance1. SUBJECT Award of Contract; SP -4057, Pavement Maintenance on Amapola Avenue and Meads Avenue in Orange Park Acres. 2. SUMMARY The street maintenance work on Amapola and Meads Avenue in Orange Park Acres will be completed in conjunction with the County of Orange Job Order Contract. The work will be performed by Excel Paving Company of Long Beach, CA. The estimated City's portion of work is $90,000. 3. RECOMMENDED ACTION Award the contract in the amount of $90,000 to Excel Paving Company and authorize the Mayor and City Clerk to execute the necessary documents on behalf of the City. 4. FISCAL IMPACT Funds are budgeted and available in the following account: 263.5011.56330.13120 Pavement Management Program $2,555,358 5. STRATEGIC PLAN GOAL(S) ;provide for a sate community - b. Provide and maintain infrastructure necessary to ensure the safety of the public. 4. Provide outstanding public service — b. Provide facilities and services to meet customer expectations. 6. GENERAL PLAN IMPLEMENTATION Infrastructure Goal 3.0 Ensure adequate maintenance of public rights -of -way to enhance public safety and improve circulation. Policy 3.1: Continue to maintain and repair sidewalks and pavement surfaces on public rights - of -way. 7. DISCUSSION and BACKGROUND The County of Orange has selected Excel Paving Company for the Job Order Contract to complete the pavement rehabilitation of its street in the Orange Park Acres area. There are several City of Orange streets that are within the County project area. The City is working with the County to get the City's portions completed in conjunction with the County project. The City and the County share both Amapola and Meads Avenue, and this contract will ensure the entire street are resurfaced at the same time. Public Works Department staff has reviewed the pavement condition index of the streets that are co- owned. The selected streets for maintenance within the County project area are Amapola Avenue from 185' east of Orange Park Boulevard to Ranchwood Trail, from 150' west of Ridgeline Road to Santiago Canyon Road and Meads Avenue, and from 745' east of Orange Park Boulevard to 890' east of Orange Park Boulevard. In accordance with the City Pavement Management Plan, the selected streets generally fall into the "poor to fair" category and require work at this time to prevent total pavement failure and higher reconstruction cost in the future. The scope of work includes but not limited to asphalt concrete grind and overlay and traffic striping. The total cost for City's portion of work is estimated at $90,000. The construction is scheduled to commence in early May 2018 and be completed in late May 2018. 8. ATTACHMENTS • Excel Paving Company Cost Proposal • Contract Agreement CITY COUNCIL MINUTES MAY 8, 2018 3. CONSENT CALENDAR (Continued) 3.23 Award of contract for Cambridge Storm Drain and Street Improvements; Bid No. 178 -32. (A2100.0; AGR -6611) ACTION: Awarded the contract in the amount of $1,064,925 to Garrett J. Gentry of Upland, California; and authorized the Mayor and City Clerk to execute on behalf of the City. 3.24 Award of contract for Police Department Exterior Wall Sealing Project (FY18); Bid No. 178 -36. (A2100.0; AGR -6612) ACTION: Awarded the contract in the amount of $47,000 to Newbuild Construction and Restoration, Inc. of Orange, California; and authorized the Mayor and City Clerk to execute on behalf of the City. 3.25 Award of contract for Preventive Maintenance and Repairs for Emergency Power Generators; Bid No. 178 -37. (A2100.0; AGR -6613) ACTION: 1) Rejected the bid received from the apparent low bidder, Global Power Group, Inc., a California Corporation, on the basis that the bid was not responsive; 2) Rejected the bid received from the second lowest bidder, Quinn Power Systems., a California Corporation, on the basis that the bid was not responsive; and 3) Awarded the contract to Odyssey Power Corporation in an amount not -to- exceed $42,980 and authorize the Mayor and City Clerk to execute on behalf of the City. 3.26 Award of contract for pavement maintenance on Amapola Avenue and Meads Avenue in Orange Park Acres. (A2100.0; AGR -6614) ACTION: Awarded the contract in the amount of $90,000 to Excel Paving Company; and authorized the Mayor and City Clerk to execute on behalf of the City. 3.27 Final Acceptance of Bid No. 167 -47; Emergency Generator for Reservoir 9A Pump Station; and authorization to file a Notice of Completion with the County Recorder. ACTION: Accepted the Emergency Generator for Reservoir 9A Pump Station project as complete, and authorized the Mayor and City Clerk to execute the Notice of Completion. 3.28 Final Acceptance of Bid No. 178 -23; Pavement and Sidewalk Repair at Rancho Santiago Boulevard and Chapman Avenue; and authorization to file a Notice of Completion with the County Recorder. ACTION: Accepted the Pavement and Sidewalk Repair at Rancho Santiago Boulevard and Chapman Avenue project as complete, and authorized the Mayor and City Clerk to execute the Notice of Completion. 3.29 Final Acceptance of Bid No. 167 -25; Yorba Park Landscape Renovation; and authorization to file a Notice of Completion with the County Recorder ACTION: Accepted the Yorba Park Landscape Renovation project as complete, and authorized the Mayor and City Clerk to execute the Notice of Completion. PAGE 7