03.23 Cambridge Storm Drain Street Improvements1. SUBJECT Award of Contract Bid No. 178 -32; Cambridge Storm Drain and Street Improvements (D -171). 2. SUMMARY Bids for the Cambridge Storm Drain and Street Improvements project were received and opened on April 26, 2018. Seven (7) bidders responded to the Notice Inviting Bids. The apparent low bidder is Garrett J Gentry of Upland, California in the amount of $1,064,925. The Engineer's estimate including 10% for contingencies and construction engineering is $1,400,000. 13. RECOMMENDED ACTION Award the contract in the amount of $1,064,925 to Garrett J Gentry of Upland, California and authorize the Mayor to execute and the City Clerk to attest the contract on behalf of the City. 14. FISCAL IMPACT Funds are available in the following accounts: 500.5011.56340.20323 Capital Improvement Program $ 337,614 272.5011.56340.20323 Gas Tax $ 345,016 220.5011.56340.20323 Sanitation & Sewer $ 733,562 Total $1,416,192 15. STRATEGIC PLAN GOAL(S) 1. Provide for a safe community - b. Provide and maintain infrastructure necessary to ensure the safety of the public. 4. Provide outstanding public service — b. Provide facilities and services to meet customer expectations. 1 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 1.0: Ensure water, sewer, and storm drain systems that meet the needs of residents and businesses. Policy 1.1: Provide sufficient levels of water, sewer, and storm drain service throughout the community. Infrastructure Element Goal 3.0 Ensure adequate maintenance of public rights -of -way to enhance public safety and improve circulation. Policy 3.1: Continue to maintain and repair sidewalks and pavement surfaces on public rights - of -way. 17. DISCUSSION and BACKGROUND The City Council previously approved advertisement for bids on March 13, 2018. The bid solicitation was advertised on April 4, 2018 for a period of three weeks and bids were opened on April 26, 2018. Seven bids were received as follows: 1. Garrett J Gentry General Engineering, Inc. $ 1,064,925 2. GRFCO, Inc. $ 1,288,378 3. Paulus Engineering, Inc. $ 1,383,320 4. Beador Construction Company, Inc. $ 1,431,300 5. T.E. Roberts, Inc. $ 1,564,828 6. Palp, Inc. DBA Excel Paving Company $ 1,664,129 7. Mike Prlich and Sons, Inc. $ 1,907,084 This project will extend the 72" reinforced concrete pipe on Cambridge Street from Maple Avenue to Palm Avenue to eliminate flooding that occurs at the intersection of Cambridge Street and Palm Avenue. It will also provide the necessary storm drain facility for ultimately extending the storm drain to Collins Avenue. Also, the extension of a 72" storm drain line will provide needed capacity to cover the deficiencies in the existing parallel unreinforced concrete Santa Ana Valley Irrigation (SAVI) line that is partially filled with silt and is located in the residential properties where the City has no easy access for maintenance. The proposed project will also include the reconstruction of street pavement, damaged concrete curb and gutter, sidewalk, driveways, and Americans with Disabilities Act (ADA) compliant ramps. In addition, the work will remove and replace segments of existing 6" sewer line with 8" sewer line and segments of the existing damaged 8" sewer line that require a higher than normal level of maintenance on Cambridge Street from Maple Avenue to Sycamore Avenue. The Engineer's estimate including 10% for contingencies and construction engineering is $1,400,000. The proposed project is categorically exempt from the provisions of the California Environmental Quality Act (CEQA) under CEQA guidelines Section 15302 "Replacement or Reconstruction" Class 2 (c). The Notice of Exemption has been filed with the County Recorder's Office. ITEM 2 05/08/18 Construction is scheduled to begin in early summer 2018 and is expected to be completed within 60 calendar days. 8. ATTACHMENTS • Location Map • Bid Abstract • Contract Agreement JD;m;cp ITEM 3 05/08/18 CITY COUNCIL MINUTES MAY 8, 2018 3. CONSENT CALENDAR (Continued) 3.23 Award of contract for Cambridge Storm Drain and Street Improvements; Bid No. 178 -32. (A2100.0; AGR -6611) ACTION: Awarded the contract in the amount of $1,064,925 to Garrett J. Gentry of Upland, California; and authorized the Mayor and City Clerk to execute on behalf of the City. 3.24 Award of contract for Police Department Exterior Wall Sealing Project (FY18); Bid No. 178 -36. (A2100.0; AGR -6612) ACTION: Awarded the contract in the amount of $47,000 to Newbuild Construction and Restoration, Inc. of Orange, California; and authorized the Mayor and City Clerk to execute on behalf of the City. 3.25 Award of contract for Preventive Maintenance and Repairs for Emergency Power Generators; Bid No. 178 -37. (A2100.0; AGR -6613) ACTION: 1) Rejected the bid received from the apparent low bidder, Global Power Group, Inc., a California Corporation, on the basis that the bid was not responsive; 2) Rejected the bid received from the second lowest bidder, Quinn Power Systems., a California Corporation, on the basis that the bid was not responsive; and 3) Awarded the contract to Odyssey Power Corporation in an amount not -to- exceed $42,980 and authorize the Mayor and City Clerk to execute on behalf of the City. 3.26 Award of contract for pavement maintenance on Amapola Avenue and Meads Avenue in Orange Park Acres. (A2100.0; AGR -6614) ACTION: Awarded the contract in the amount of $90,000 to Excel Paving Company; and authorized the Mayor and City Clerk to execute on behalf of the City. 3.27 Final Acceptance of Bid No. 167 -47; Emergency Generator for Reservoir 9A Pump Station; and authorization to file a Notice of Completion with the County Recorder. ACTION: Accepted the Emergency Generator for Reservoir 9A Pump Station project as complete, and authorized the Mayor and City Clerk to execute the Notice of Completion. 3.28 Final Acceptance of Bid No. 178 -23; Pavement and Sidewalk Repair at Rancho Santiago Boulevard and Chapman Avenue; and authorization to file a Notice of Completion with the County Recorder. ACTION: Accepted the Pavement and Sidewalk Repair at Rancho Santiago Boulevard and Chapman Avenue project as complete, and authorized the Mayor and City Clerk to execute the Notice of Completion. 3.29 Final Acceptance of Bid No. 167 -25; Yorba Park Landscape Renovation; and authorization to file a Notice of Completion with the County Recorder ACTION: Accepted the Yorba Park Landscape Renovation project as complete, and authorized the Mayor and City Clerk to execute the Notice of Completion. PAGE 7