03.21 Heim Ave Steel Pipe Repair1. SUBJECT Authorization of payment for the repair of existing 18" cement coated steel pipe on Heim Ave. 2. SUMMARY The existing 18" cement coated steel pipe had a leak due to corrosion. Valverde Construction was hired to repair the leak because of their experience working on this type of pipe material and because our previous experiences using Valverde Construction in this type of repair has been positive. The pipe was exposed and inspected. There were several corroded areas on the pipe that needed repair. It was determined that a 16 foot section of the existing pipe had to be removed and replaced. The total cost for this repair is $34,976. 3. RECOMMENDED ACTION Authorize the payment of $34,976 for the repairs of the existing 18" cement coated steel pipe. 4. FISCAL IMPACT Funds are available to cover the cost in the following account: 600.8041.55451.00000 Transmission and Distribution Mains $185,606 5. STRATEGIC PLAN GOAL(S) Provide for a safe community: b. Provide and maintain the infrastructure necessary to ensure the safety of the public. 2. Be a fiscally healthy community: d. Effectively manage and develop City assets. 4. Provide outstanding public service: b. Provide facilities and services to meet customer expectations. 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 6.0: Ensure water, sewer, and storm drain systems that meet the needs of residents and businesses. Policy 1.1: Provide sufficient levels of water, sewer, and storm drain service throughout the community. Economic Development Element Goal 6.0: Provide sufficient infrastructure to support anticipated economic development and growth. Policy 6.1: Provide public improvements to support commercial, industrial and institutional uses. 7. DISCUSSION and BACKGROUND The 18" diameter pipe was installed in 1958 as a transmission water main on Heim Aveune between Orange -Olive Road and Canal Street. This is a steel pipe with cement lining on the inside and outside of the pipe. A leak on this transmission line was reported and investigated by Water Division staff. Because of the pipe material, the repair required the expertise of an outside contractor. Valverde Construction, Inc. was contacted because of their experience repairing this pipe material. They have successfully repaired leaks at other locations for the City in the past. Their workmanship and reasonable pricing has proven beneficial to the City. Valverde Construction provided the City with a quote in the amount of $24,000 to excavate and repair the leak. Due to the need for this emergency repair work to be done expeditiously, staff sought and received approval to proceed from the Purchasing Officer. Upon exposing the existing water main, it was discovered that there were several other corroded areas along this section of pipe. In order to ensure the integrity of the pipe and to prevent future leaks, approximately 16 feet of the existing pipe was removed and replaced with new pipe material. The cost for this additional work is $10,976 bringing the total cost for the repair to $34,976. The repair work has been completed and the waterline is back in service. As this emergency repair exceeded the City Manager's $30,000 contract authority, City Council approval is necessary. Therefore, staff is requesting the authorization to make final payment to Valverde Construction, Inc. 8. ATTACHMENTS • Location Map ITEM 03/13/18 Pa CITY COUNCIL MINUTES MARCH 13, 2018 3. CONSENT CALENDAR (Continued) 3.21 Authorization of payment to Valverde Construction, Inc. for the repair of existing 18" cement coated steel pipe on Heim Avenue. (C2500.P) ACTION: Authorized the payment of $34,976 for the repairs of the existing 18" cement coated steel pipe 3.22 Purchase of tires and emergency roadside assistance from Pete's Road Service, Inc. on a sole source basis. (C2500.M.7) ACTION: Authorized the expenditure of $60,000 to Pete's Road Service, Inc. 3.23 Purchase of Cylance anti -virus software for a three -year term from Sidepath, Inc. (C2500.J) NOTE: Mayor pro tem Murphy recorded an abstention due to a potential conflict with employment. ACTION: Approved the purchase of Cylance anti -virus software for three years from Sidepath, Inc. in the amount of $92,132.26. 3.24 Purchase of five Dell R740 servers from Sidepath, Inc. (C2500.J) NOTE: Mayor pro tem Murphy recorded an abstention due to a potential conflict with employment. ACTION: 1) Approved the purchase of five Dell R740 servers from Sidepath, Inc. in the amount of $139,342.08; and 2) Authorized the appropriation of $17,900 from Information Technology (790) unreserved fund balance to account number 790.1601.56033.20289 (GIS Server). 3.25 City Traffic Commission Activity Report for 2017. (OR1800.0.19) ACTION: Received and filed. 3.26 Memorandum of Understanding between the City of Orange and the Orange Municipal Employees' Association (OMEA) effective July 1, 2017, to December 31, 2019. Resolution No. 11057. (C2500.J.4.5) A Resolution of the City Council of the City of Orange establishing a Memorandum of Understanding between the City of Orange and the Orange Municipal Employees' Association (OMEA) effective July 1, 2017, to December 31, 2019. ACTION: Approved Resolution No. 11057. 3.27 Authorization for temporarily closing portions of Public Streets for approved Special Events. Resolution No. 11068. (S4000.S.4) A Resolution of the City Council of the City of Orange temporarily closing sections of Public Streets for approved Special Events. ACTION: Approved Resolution No. 11068 approving the closure of public streets during the times of approved special events; and approved closure of municipal parking lots and temporary suspension of neighborhood permit parking restrictions for certain events and dates occurring in the Fiscal Year 2018 -19. PAGE 7