03.13 Annual Slurry Seal FY17-181. SUBJECT Bid No. 178 -30; SP -4047; Annual Slurry Seal at Various Locations, Fiscal Year 2017 -2018. 2. SUMMARY Plans and specifications have been completed for the Annual Slurry Seal Project at Various Locations, FY 2017 -2018. The project is ready to be advertised for bids. The estimated construction cost is $675,000 including 10% for construction engineering and contingency. 3. RECOMMENDED ACTION Approve plans and specifications and authorize advertising for bids for the Annual Slurry Seal at Various Locations, Fiscal Year 2017 -2018. 4. FISCAL IMPACT Funds are budgeted and available in the following accounts: 263.5011.56330.13120 Pavement Management Program $ 566,000 272.5011.56330.13120 Pavement Management Program $ 34,305 510.7021.56015.30053 Parking Lot Pavement Rehabilitation $ 75,000 $ 675,305 5. STRATEGIC PLAN GOAL(S) 1. Provide for a safe community — b. Provide and maintain infrastructure necessary to ensure the safety of the public. 4. Provide outstanding public service — b. Provide facilities and services to meet customer expectations. 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 3.0 Ensure adequate maintenance of public rights -of -way to enhance public safety and improve circulation. Policy 3.1: Continue to maintain and repair sidewalks and pavement surfaces on public rights -of- way. 7. DISCUSSION and BACKGROUND The Annual Slurry Seal Project at Various Locations is part of our FY 2017 -2018 Annual Street Maintenance activities and is designed to prolong pavement life of city streets. Rehabilitation methods vary depending on the sustained damage but in general consist of asphalt concrete overlays with localized areas of pavement reconstruction and slurry seal. The rehabilitated pavement will have a longer service life and will provide a safe and smooth ride for the public. This slurry seal project will include approximately 62 residential streets throughout the City. The streets selected for maintenance in accordance with our Pavement Management Plan, generally fall into the "fair" category and require work at this time to prevent pavement deterioration and higher cost for asphalt concrete overlay in the future. The project will also include the rehabilitation of El Camino Park parking lots. The work includes, but not limited to, slurry seal, signing and striping, and replacement of damaged concrete wheel- stops. The total cost for street slurry seal is estimated at $675,000 including 10% for construction engineering and contingency. Upon receipt of public bids, staff will return to the City Council and recommend any funding adjustments and award of contracts based on the outcome of the public bid. If the unit price for slurry seal comes in below the estimate, additional streets and parking lots may be added for rehabilitation. The proposed project is categorically exempt from the provisions of the California Environmental Quality Act (CEQA) under CEQA guidelines Section 15301 "Existing Facilities" Class 1 (c). The CEQA Notice of Exemption will be filed with the County Recorder's Office upon Council's approval of the plans and specifications. Construction is estimated to begin in June 2018 and to be completed by August 2018. 8. ATTACHMENTS • Location List • Plans, specifications, and cost estimates are available for review in the Public Works Department JD;m;cp ITEM 2 03/13/18 CITY COUNCIL MINUTES MARCH 13, 2018 3. CONSENT CALENDAR (Continued) 3.10 Appropriation of funds to the existing CIP project to perform restoration and surface coating of the historic cast iron fountain located at the Orange Public Library & History Center. (C2500.I) ACTION: Authorized the appropriation of $5,621 from the Library Facilities Fees (Fund 573) unreserved fund balance to account number 573.2001.56020.20295, Library Fountain Library Facilities Fees. 3.11 Approval of plans and specifications for Cambridge Storm Drain and Street Improvements, FY 2017 -18, Bid No. 178 -32; and authorization to advertise for bids. (C2500.M.17) ACTION: 1) Appropriated $541,480 from account number 220.5011.56200.15508 (Sanitation & Sewer) to 220.5011.56340.20323; and 2) Approved plans and specifications and authorized advertisement for bids for Cambridge Storm Drain and Street Improvements. 3.12 Approval of plans and specifications for Street Improvements on Palmyra Avenue and Sewer Improvements on Palmyra Avenue and Waverly Street, FY 2017 -18, Bid No. 178 -31; and authorization to advertise for bids. (C2500.M.3) ACTION: 1) Appropriated $600,000 from Fund 520 unreserved fund balance to account number 520.5011.56200.15508 (Sewer Line Maintenance Replacement); and 2) Approved plans and specifications and authorized advertisement for bids for the Street Improvements on Palmyra Avenue and Sewer Improvements on Palmyra Avenue and Waverly Street. (ITEMS 3.13 AND 3.14 WERE REMOVED FROM THE CONSENT CALENDAR AND HEARD CONCURRENTLY) 3.13 Approval of plans and specifications for Annual Slurry Seal at Various Locations, Fiscal Year 2017 -18, Bid No. 178 -30; and authorization to advertise for bids. (S4000.S.7) 3.14 Approval of plans and specifications for Annual Pavement Maintenance at Various Locations, Fiscal Year 2017 -18, Bid No. 178 -29; and authorization to advertise for bids. (S4000.S.7) Councilmember Alvarez requested that the Handy, Fern, and Palm neighborhood be added to the list of streets being slurry sealed and /or paved. City Engineer Frank Sun explained that the current CDBG Fern Neighborhood Street and Sewer Improvements Project includes the intersection of Fern Street, Handy Street, and Palm Avenue. There is a CDBG project planned for next year that will include the improvement of Palm Avenue. MOTION — Alvarez SECOND — Whitaker AYES — Alvarez, Whitaker, Smith, Murphy, Nichols Moved to approve plans and specifications and authorize advertising for bids for the Annual Slurry Seal at Various Locations, Fiscal Year 2017 -18; and approve plans and specifications and authorize advertising for bids for the Annual Pavement Maintenance Project at Various Locations, FY 2017 -2018. PAGE 5