Loading...
03.11 Cambridge Storm Drain Improvements1. SUBJECT Bid No. 178 -32; Cambridge Storm Drain and Street Improvements (D -171), FY 2017 -18. 2. SUMMARY Plans and specifications have been completed for the construction of the Cambridge Storm Drain and Street Improvements from Maple Avenue to Palm Avenue Project. This project will alleviate flooding at the intersection of Palm Avenue and Cambridge Street and will provide the necessary storm drain facility for ultimately extending the storm drain to Collins Avenue. The project is ready to be advertised for bids. The total estimated construction cost including 10% for contingencies and construction engineering is $1,400,000. 1 3. RECOMMENDED ACTION Transfer $541,480 from 220.5011.56200.15508 (Sanitation & Sewer) to 220.5011.56340.20323. 2. Approve plans and specifications and authorizing advertisement for bids for Cambridge Storm Drain and Street Improvements (D -171). 4. FISCAL IMPACT After the transfer, funds will be available in the following accounts: 500.5011.56340.20323 272.5011.56340.20323 220.5011.56340.20323 Capital Improvement Program Gas Tax Sanitation & Sewer $ 345,841 $ 350,000 $ 733,780 Total $1,429,621 5. STRATEGIC PLAN GOAL(S) 1. Provide for a safe community - b. Provide and maintain infrastructure necessary to ensure the safety of the public. 4. Provide outstanding public service — b. Provide facilities and services to meet customer expectations. 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 1.0: Ensure water, sewer, and storm drain systems that meet the needs of residents and businesses. Policy 1.1: Provide sufficient levels of water, sewer, and storm drain service throughout the community. Infrastructure Element Goal 3.0 Ensure adequate maintenance of public rights -of -way to enhance public safety and improve circulation. Policy 3.1: Continue to maintain and repair sidewalks and pavement surfaces on public rights - of -way. 7. DISCUSSION and BACKGROUND In 2011, the City completed a storm drain improvement project on Cambridge Street from Chapman Avenue to Maple Avenue. The project included the construction of 72" storm drain line to eliminate flooding that occurs at the intersection of Cambridge Street and Maple Avenue, replacement of a 6" sewer line with an 8" sewer line, and the reconstruction of roadway pavement in poor condition. The Public Works Department has completed the preparation of plans and specifications for the Cambridge Storm Drain and Street Improvements project and is requesting authorization from the Orange City Council to advertise and receive public bids. This project will extend the 72" reinforced concrete pipe on Cambridge Street from Maple Avenue to Palm Avenue to eliminate flooding that occurs at the intersection of Cambridge Street and Palm Avenue and will provide the necessary storm drain facility for ultimately extending the storm drain to Collins Avenue. Also, the extension of a 72" storm drain line will provide needed capacity to cover and deficiencies in the existing parallel unreinforced concrete Santa Ana Valley Irrigation (SAVI) line that is partially filled with silt and is located in the residential properties where the City has no easy access for maintenance. The proposed project will also include the reconstruction of street pavement, damaged concrete curb and gutter, sidewalk, driveways, and Americans with Disabilities Act (ADA) compliant ramps. In addition, the work will remove and replace segments of existing 6" sewer line with 8" sewer line and segments of the existing damaged 8" sewer line that require a higher than normal level of maintenance on Cambridge Street from Maple Avenue to Sycamore Avenue. The total estimated construction cost including 10% for contingencies and construction engineering is $1,400,000. Upon receipt of public bids, staff will return to the City Council and recommend any funding adjustments and award of contracts based on the outcome of the public ITEM 2 03/13/18 bid. Construction is scheduled to begin in summer 2018 and is expected to be completed within 90 calendar days. The proposed project is categorically exempt from the provisions of the California Environmental Quality Act (CEQA) under CEQA guidelines Section 15301 "Existing Facilities" Class 1 (c). The proposed sewer replacement is categorically exempt from the provisions of the California Environmental Quality Act (CEQA) under CEQA guidelines Section 15301 "Existing Facilities" Class 1 (b). The Notice of Exemption will be filed with the County Recorder's Office upon Council's approval of the plans and specifications. 8. ATTACHMENTS • Location Map • Plans, specifications, and cost estimates are available for review in the Public Works Department JD;m;cp ITEM 3 03/13/18 CITY COUNCIL MINUTES MARCH 13, 2018 3. CONSENT CALENDAR (Continued) 3.10 Appropriation of funds to the existing CIP project to perform restoration and surface coating of the historic cast iron fountain located at the Orange Public Library & History Center. (C2500.I) ACTION: Authorized the appropriation of $5,621 from the Library Facilities Fees (Fund 573) unreserved fund balance to account number 573.2001.56020.20295, Library Fountain Library Facilities Fees. 3.11 Approval of plans and specifications for Cambridge Storm Drain and Street Improvements, FY 2017 -18, Bid No. 178 -32; and authorization to advertise for bids. (C2500.M.17) ACTION: 1) Appropriated $541,480 from account number 220.5011.56200.15508 (Sanitation & Sewer) to 220.5011.56340.20323; and 2) Approved plans and specifications and authorized advertisement for bids for Cambridge Storm Drain and Street Improvements. 3.12 Approval of plans and specifications for Street Improvements on Palmyra Avenue and Sewer Improvements on Palmyra Avenue and Waverly Street, FY 2017 -18, Bid No. 178 -31; and authorization to advertise for bids. (C2500.M.3) ACTION: 1) Appropriated $600,000 from Fund 520 unreserved fund balance to account number 520.5011.56200.15508 (Sewer Line Maintenance Replacement); and 2) Approved plans and specifications and authorized advertisement for bids for the Street Improvements on Palmyra Avenue and Sewer Improvements on Palmyra Avenue and Waverly Street. (ITEMS 3.13 AND 3.14 WERE REMOVED FROM THE CONSENT CALENDAR AND HEARD CONCURRENTLY) 3.13 Approval of plans and specifications for Annual Slurry Seal at Various Locations, Fiscal Year 2017 -18, Bid No. 178 -30; and authorization to advertise for bids. (S4000.S.7) 3.14 Approval of plans and specifications for Annual Pavement Maintenance at Various Locations, Fiscal Year 2017 -18, Bid No. 178 -29; and authorization to advertise for bids. (S4000.S.7) Councilmember Alvarez requested that the Handy, Fern, and Palm neighborhood be added to the list of streets being slurry sealed and /or paved. City Engineer Frank Sun explained that the current CDBG Fern Neighborhood Street and Sewer Improvements Project includes the intersection of Fern Street, Handy Street, and Palm Avenue. There is a CDBG project planned for next year that will include the improvement of Palm Avenue. MOTION — Alvarez SECOND — Whitaker AYES — Alvarez, Whitaker, Smith, Murphy, Nichols Moved to approve plans and specifications and authorize advertising for bids for the Annual Slurry Seal at Various Locations, Fiscal Year 2017 -18; and approve plans and specifications and authorize advertising for bids for the Annual Pavement Maintenance Project at Various Locations, FY 2017 -2018. PAGE 5