Loading...
03.12 Orangewood Ave 16" Water Main1. SUBJECT Cooperative agreement with the City of Anaheim for the design and construction of the 16" water main on Orangewood Avenue. 2. SUMMARY The City of Anaheim proposes to improve and widen Orangewood Avenue from State College Boulevard. to the Santa Ana River. The City of Orange has a need to install a new water transmission line to improve the reliability of the water system. The Cooperative Agreement between the City of Orange and the City of Anaheim outlines the respective roles and responsibilities for each agency. The City of Orange is responsible for an estimated cost of $2,782,000 for the design and construction of the 16" water main from State College Boulevard to Eckhoff Street. 3. RECOMMENDED ACTION Approve the Cooperative Agreement for the design and construction of the 16" water main on Orangewood Avenue from State College Boulevard to Eckhoff Street. 4. FISCAL IMPACT Funds are budgeted and are available to cover the cost as follows: 600.8041.56451.18400 Pipeline Renewal Projects $1,469,000 With the approval of the Fiscal Year 2018 -2019 budget, additional funds will be available as follows: 600.8041.56451.18400 Pipeline Renewal Projects $1,900,000 1 5. STRATEGIC PLAN GOAL(S) 1. Provide for a safe community: b. Provide and maintain infrastructure necessary to ensure the safety of the public. 2. Be a fiscally healthy community: d. Effectively manage and develop City assets. 4. Provide outstanding public service: b. Provide facilities and services to meet customer expectations. 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 6.0: Ensure water, sewer, and storm drain systems that meet the needs of residents and businesses. Policy 1.1: Provide sufficient levels of water, sewer, and storm drain service throughout the community. Economic Development Element Goal 6.0: Provide sufficient infrastructure to support anticipated economic development and growth. Policy 6.1: Provide public improvements to support commercial, industrial and institutional uses. 7. DISCUSSION and BACKGROUND The City of Anaheim proposes to improve and widen Orangewood Avenue from State College Boulevard to the Santa Ana River. In addition, the Orangewood Avenue Bridge over the Santa Ana River will also be widened to accommodate added sidewalks and future bike lanes. The City of Orange has a need to install a new water transmission line to improve the reliability of the water system. There are only 3 existing water mains connecting the important business district on the west side of the Santa Ana River to the rest of the water system. These existing river crossings are old and undersized. The new 16" ductile iron pipe (DIP) on Orangewood Avenue will greatly enhance the reliability and capability of the water system. The Cooperative Agreement between the City of Orange and the City of Anaheim outlines the respective roles and responsibilities for each agency. The City of Orange is responsible for an estimated cost of $2,782,000 for the design and construction of the 16" water main from State College Boulevard to Eckhoff Street. The Agreement stipulates that the City of Orange is only responsible for the actual expenses of its water main. The Orangewood Avenue Widening Project and the Water Main Improvement Project are both currently in the design phase. Construction is scheduled to begin in August 2018. 8. ATTACHMENTS Cooperative Agreement Location Map ITEM 2/13/18 2 CITY COUNCIL MINUTES FEBRUARY 13, 2018 3. CONSENT CALENDAR (Continued) 3.6 Designation of alternate Board Member for the Metro Cities Fire Authority. (OC 1300.A) ACTION: Designated Susan Galvan as the City's alternate voting board member to the Metro Cities Fire Authority. 3.7 Agreement with Pyro Spectaculars, Inc. for fireworks display at the City of Orange Third of July Celebration. (A2100.0; AGR- 3516.N) ACTION: Approved a revised five -year agreement with Pyro Spectacular, Inc. in an amount not -to- exceed $87,500, and authorized the Mayor and the City Clerk to execute on behalf of the City. 3.8 First Amendment to Agreement No. 6400.A with Cornerstone Communications for membership to Behind the Badge OC, in the amount of $48,000. (A2100.0; AGR - 6400.A.1) ACTION: Approved Amendment with Cornerstone Communications in an amount not- to- exceed $48,000 and authorized the Mayor and City Clerk to execute the agreement on behalf of the City. 3.9 Amendment No. 1 to Consultant Services Agreement No. 6370 with Secoy Architect, Inc., for additional Professional Services for Council Chamber Remodel Project. (A2100.0; AGR- 6370.1) ACTION: Approved Amendment No. 1 to the existing Secoy Architect, Inc., Consultant Services Agreement and increase the contract amount by $25,500; and authorized the Mayor and City Clerk to execute the Amendment on behalf of the City. 3.10 Contract with Advanced Aquatic Technology, Inc. for regular maintenance and repair of City fountains. (A2100.0; AGR -6573) ACTION: Approved a four -year contract with Advanced Aquatic Technology, Inc. for an amount not -to- exceed $78,232.20; and authorized the Mayor and the City Clerk to execute on behalf of the City. 3.11 Purchase of Four Storage Area Network (SAN) Fabric Switches from Sidepath, Inc. (C2500.J) NOTE: Mayor pro tem Murphy recorded an abstention due to a potential conflict with employment. ACTION: Approved the purchase of four SAN Fabric Switches from Sidepath, Inc. in the amount of $92,742.14; and authorized the appropriation of $12,750 from Information Technology (790) unreserved fund balance to account number 790.1601.56033.20293. 3.12 Cooperative agreement with the City of Anaheim for the design and construction of the 16" water main on Orangewood Avenue. (A2100.0; AGR -6575) ACTION: Approved the Cooperative Agreement for the design and construction of the 16" water main on Orangewood Avenue from State College Boulevard to Eckhoff Street. PAGE 4