Loading...
12-03-18 Billboard Appendix C - AQ-GHG Supporting Info Appendix C: Air Quality and Greenhouse Gas Emissions Supporting Information THIS PAGE INTENTIONALLY LEFT BLANK CalEEMod Version: CalEEMod.2016.3.2 Page 1 of 1 Date: 9/4/2018 9:52 AM 0404.0014 City of Orange Billboard Removal site - Orange County, Summer 0404.0014 City of Orange Billboard Removal site Orange County, Summer 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric Lot Acreage Floor Surface Area Population User Defined Industrial 1.00 User Defined Unit 0.01 25.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s)2.2 Precipitation Freq (Days)30 Climate Zone 8 Operational Year 2018 Utility Company Southern California Edison CO2 Intensity (lb/MWhr) 702.44 CH4 Intensity (lb/MWhr) 0.029 N2O Intensity (lb/MWhr) 0.006 1.3 User Entered Comments & Non-Default Data Project Characteristics - Removal sites- Construction only Land Use - Removal of existing billboards Construction Phase - It is expected to take approximately 2 working days per location to remove each of the existing billboard structures, for a maximum of approximately 6 working days to remove all 3 billboards. Off-road Equipment - Hand tools and small crane rigs would be used to remove the billboards. Trips and VMT - Additional vendor trips and haul trips were added to account for delivery of material and transport of removed billboards. Table Name Column Name Default Value New Value tblConstructionPhase NumDays 10.00 6.00 tblLandUse LandUseSquareFeet 0.00 25.00 tblLandUse LotAcreage 0.00 0.01 tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00 tblOffRoadEquipment UsageHours 1.00 0.00 tblTripsAndVMT HaulingTripNumber 0.00 6.00 Exhaust PM10 PM10 Total tblTripsAndVMT VendorTripNumber 0.00 2.00 2.0 Emissions Summary 2.1 Overall Construction (Maximum Daily Emission) NBio- CO2 Total CO2 Unmitigated Construction ROG NOx CO SO2 Fugitive PM10 CH4 N2O CO2e Year lb/day lb/day Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 2018 0.9142 8.1678 6.5565 0.0123 0.1196 0.4841 0.6037 0.0322 0.4668 0.4990 0.0000 1,206.830 5 1,206.8305 0.1804 0.0000 1,211.340 6 Maximum 0.9142 8.1678 6.5565 0.0123 0.0000 1,211.340 6 0.1196 0.4841 0.6037 0.0322 0.4668 0.4990 Fugitive PM10 Exhaust PM10 0.0000 1,206.830 5 1,206.8305 0.1804 PM2.5 Total Bio- CO2 NBio- CO2 Mitigated Construction ROG NOx CO SO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day PM10 Total Fugitive PM2.5 Exhaust PM2.5 2018 0.9142 8.1678 6.5565 0.0123 0.1196 0.4841 0.6037 0.0322 0.4668 0.4990 0.0000 1,206.830 5 1,206.8305 0.1804 0.0000 1,211.340 6 Maximum 0.9142 8.1678 6.5565 0.0123 0.1196 0.4841 0.6037 0.0322 0.4668 0.4990 0.0000 1,206.830 5 1,206.8305 0.1804 0.0000 1,211.340 6 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 Demolition Demolition 10/1/2018 10/8/2018 5 6 Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 0 Acres of Paving: 0 Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area: 0 OffRoad Equipment Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Demolition Concrete/Industrial Saws 1 8.00 81 0.73 Demolition Cranes 1 2.00 231 0.29 Demolition Rubber Tired Dozers 0 0.00 247 0.40 Demolition Tractors/Loaders/Backhoes 1 6.00 97 0.37 Trips and VMT Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class HDT_Mix HHDTDemolition38.00 2.00 6.00 14.70 6.90 20.00 LD_Mix 3.1 Mitigation Measures Construction SO2 Fugitive PM10 Exhaust PM10 PM2.5 Total Bio- CO2 NBio- CO2 3.2 Demolition - 2018 Unmitigated Construction On-Site ROG NOx CO Total CO2 CH4 N2O CO2e Category lb/day lb/day PM10 Total Fugitive PM2.5 Exhaust PM2.5 Off-Road 0.8616 7.5924 6.1071 0.0100 0.4805 0.4805 0.4634 0.4634 972.3961 972.3961 0.1641 976.4986 Total 0.8616 7.5924 6.1071 0.0100 976.49860.4805 0.4805 0.4634 0.4634 Fugitive PM10 Exhaust PM10 972.3961 972.3961 0.1641 PM2.5 Total Bio- CO2 NBio- CO2 Unmitigated Construction Off-Site ROG NOx CO SO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day PM10 Total Fugitive PM2.5 Exhaust PM2.5 Hauling 8.6300e- 003 0.3124 0.0711 7.8000e- 004 0.0174 1.2400e- 003 0.0187 4.7700e- 003 1.1900e- 003 5.9600e- 003 87.0347 87.0347 9.0900e- 003 87.2620 Vendor 8.1000e- 003 0.2386 0.0640 5.1000e- 004 0.0128 1.7700e- 003 0.0145 3.6800e- 003 1.6900e- 003 5.3700e- 003 54.8657 54.8657 4.7600e- 003 54.9847 Worker 0.0358 0.0244 0.3142 9.3000e- 004 0.0894 5.9000e- 004 0.0900 0.0237 5.4000e- 004 0.0243 92.5341 92.5341 2.4500e- 003 92.5953 Total 0.0526 0.5753 0.4493 2.2200e- 003 234.84200.1196 3.6000e- 003 0.1232 0.0322 3.4200e- 003 0.0356 234.4344 234.4344 0.0163 Fugitive PM10 Exhaust PM10 PM2.5 Total Bio- CO2 NBio- CO2 Mitigated Construction On-Site ROG NOx CO SO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day PM10 Total Fugitive PM2.5 Exhaust PM2.5 Off-Road 0.8616 7.5924 6.1071 0.0100 0.4805 0.4805 0.4634 0.4634 0.0000 972.3961 972.3961 0.1641 976.4986 Total 0.8616 7.5924 6.1071 0.0100 976.49860.4805 0.4805 0.4634 0.4634 Fugitive PM10 Exhaust PM10 0.0000 972.3961 972.3961 0.1641 PM2.5 Total Bio- CO2 NBio- CO2 Mitigated Construction Off-Site ROG NOx CO SO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day PM10 Total Fugitive PM2.5 Exhaust PM2.5 Hauling 8.6300e- 003 0.3124 0.0711 7.8000e- 004 0.0174 1.2400e- 003 0.0187 4.7700e- 003 1.1900e- 003 5.9600e- 003 87.0347 87.0347 9.0900e- 003 87.2620 Vendor 8.1000e- 003 0.2386 0.0640 5.1000e- 004 0.0128 1.7700e- 003 0.0145 3.6800e- 003 1.6900e- 003 5.3700e- 003 54.8657 54.8657 4.7600e- 003 54.9847 Worker 0.0358 0.0244 0.3142 9.3000e- 004 0.0894 5.9000e- 004 0.0900 0.0237 5.4000e- 004 0.0243 92.5341 92.5341 2.4500e- 003 92.5953 Total 0.0526 0.5753 0.4493 2.2200e- 003 0.1196 3.6000e- 003 0.1232 0.0322 3.4200e- 003 0.0356 234.4344 234.4344 0.0163 234.8420 Trips and VMT - Additional worker trips and vendor trips added to the building construction phase to account for the delivery of materials. Construction Off-road Equipment Mitigation - 1.3 User Entered Comments & Non-Default Data Project Characteristics - Construction only Land Use - Construction only Construction Phase - Billboard construction will take approximately 2-4 weeks to complete. Off-road Equipment - Estimated construction equipment Off-road Equipment - Estimated construction equipment CO2 Intensity (lb/MWhr) 702.44 CH4 Intensity (lb/MWhr) 0.029 N2O Intensity (lb/MWhr) 0.006 30 Climate Zone 8 Operational Year 2018 Utility Company Southern California Edison 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s)2.2 Precipitation Freq (Days) Floor Surface Area Population User Defined Industrial 1.00 User Defined Unit 0.01 25.00 0 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric Lot Acreage CalEEMod Version: CalEEMod.2016.3.2 Page 1 of 1 Date: 9/4/2018 10:11 AM 0404.0014 City of Orange Billboard Construction - Orange County, Summer 0404.0014 City of Orange Billboard Construction Orange County, Summer 0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2ROGNOxCOSO2Fugitive PM10 0.0000 553.0394 553.0394 0.1335 0.0000 556.37670.1022 0.2442 0.3464 0.0274 0.2247 0.2521Maximum0.4629 4.8542 2.5476 5.4700e- 003 0.0000 553.0394 553.0394 0.1335 0.0000 556.37670.1022 0.2442 0.3464 0.0274 0.2247 0.252120180.4629 4.8542 2.5476 5.4700e- 003 Total CO2 CH4 N2O CO2e Year lb/day lb/day PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 0.0000 553.0394 553.0394 0.1335 0.0000 556.37670.1022 0.2442 0.3464 0.0274 0.2247 0.2521Maximum0.4629 4.8542 2.5476 5.4700e- 003 0.0000 553.0394 553.0394 0.1335 0.0000 556.37670.1022 0.2442 0.3464 0.0274 0.2247 0.252120180.4629 4.8542 2.5476 5.4700e- 003 CH4 N2O CO2e Year lb/day lb/day Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 Unmitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total tblTripsAndVMT WorkerTripNumber 0.00 8.00 2.0 Emissions Summary 2.1 Overall Construction (Maximum Daily Emission) tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 0.00 tblTripsAndVMT VendorTripNumber 0.00 2.00 tblLandUse LotAcreage 0.00 0.01 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00 tblConstructionPhase NumDays 100.00 20.00 tblLandUse LandUseSquareFeet 0.00 25.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 Table Name Column Name Default Value New Value Water Exposed Area 6.90 20.00 LD_Mix HDT_Mix HHDT 3.1 Mitigation Measures Construction Building Construction 2 8.00 2.00 0.00 14.70 Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Trips and VMT Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Building Construction Tractors/Loaders/Backhoes 0 8.00 97 0.37 Building Construction Forklifts 1 6.00 89 0.20 Load Factor Building Construction Cranes 1 4.00 231 0.29 OffRoad Equipment Phase Name Offroad Equipment Type Amount Usage Hours Horse Power 20 Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 0 Acres of Paving: 0 Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area: 0 End Date Num Days Week Num Days Phase Description 1 Building Construction Building Construction 10/1/2018 10/26/2018 5 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date 147.3997 147.3997 7.2100e- 003 147.58000.1022 2.3600e- 003 0.1046 0.0274 2.2300e- 003 0.0296Total0.0439 0.2629 0.3783 1.4400e- 003 92.5341 92.5341 2.4500e- 003 92.59530.0894 5.9000e- 004 0.0900 0.0237 5.4000e- 004 0.0243Worker0.0358 0.0244 0.3142 9.3000e- 004 54.8657 54.8657 4.7600e- 003 54.98470.0128 1.7700e- 003 0.0145 3.6800e- 003 1.6900e- 003 5.3700e- 003 Vendor 8.1000e- 003 0.2386 0.0640 5.1000e- 004 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Hauling0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e Category lb/day lb/day PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 405.6397 405.6397 0.1263 408.79670.2419 0.2419 0.2225 0.2225Total0.4190 4.5913 2.1694 4.0300e- 003 405.6397 405.6397 0.1263 408.79670.2419 0.2419 0.2225 0.2225Off-Road 0.4190 4.5913 2.1694 4.0300e- 003 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 3.2 Building Construction - 2018 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 147.3997 147.3997 7.2100e- 003 147.58000.1022 2.3600e- 003 0.1046 0.0274 2.2300e- 003 0.0296Total0.0439 0.2629 0.3783 1.4400e- 003 92.5341 92.5341 2.4500e- 003 92.59530.0894 5.9000e- 004 0.0900 0.0237 5.4000e- 004 0.0243Worker0.0358 0.0244 0.3142 9.3000e- 004 54.8657 54.8657 4.7600e- 003 54.98470.0128 1.7700e- 003 0.0145 3.6800e- 003 1.6900e- 003 5.3700e- 003 Vendor 8.1000e- 003 0.2386 0.0640 5.1000e- 004 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Hauling0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e Category lb/day lb/day PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Mitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 0.0000 405.6397 405.6397 0.1263 408.79670.2419 0.2419 0.2225 0.2225Total0.4190 4.5913 2.1694 4.0300e- 003 0.0000 405.6397 405.6397 0.1263 408.79670.2419 0.2419 0.2225 0.2225Off-Road 0.4190 4.5913 2.1694 4.0300e- 003 Total CO2 CH4 N2O CO2e Category lb/day lb/day PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 1.3 User Entered Comments & Non-Default Data Project Characteristics - Removal sites- Construction only Land Use - Removal of existing billboards Construction Phase - It is expected to take approximately 2 working days per location to remove each of the existing billboard structures, for a maximum of approximately 6 working days to remove all 3 billboards. Off-road Equipment - Hand tools and small crane rigs would be used to remove the billboards. Trips and VMT - Additional vendor trips and haul trips were added to account for delivery of material and transport of removed billboards. CO2 Intensity (lb/MWhr) 702.44 CH4 Intensity (lb/MWhr) 0.029 N2O Intensity (lb/MWhr) 0.006 30 Climate Zone 8 Operational Year 2018 Utility Company Southern California Edison 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s)2.2 Precipitation Freq (Days) Floor Surface Area Population User Defined Industrial 1.00 User Defined Unit 0.01 25.00 0 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric Lot Acreage CalEEMod Version: CalEEMod.2016.3.2 Page 1 of 1 Date: 8/30/2018 3:04 PM 0404.0014 City of Orange Billboard Removal site - Orange County, Annual 0404.0014 City of Orange Billboard Removal site Orange County, Annual 0.0000 3.2716 3.2716 4.9000e- 004 0.0000 3.28393.5000e- 004 1.4500e- 003 1.8100e- 003 9.0000e- 005 1.4000e- 003 1.5000e- 003 Maximum 2.7400e- 003 0.0246 0.0196 4.0000e- 005 0.0000 3.2716 3.2716 4.9000e- 004 0.0000 3.28393.5000e- 004 1.4500e- 003 1.8100e- 003 9.0000e- 005 1.4000e- 003 1.5000e- 003 2018 2.7400e- 003 0.0246 0.0196 4.0000e- 005 Total CO2 CH4 N2O CO2e Year tons/yr MT/yr PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 0.0000 3.2716 3.2716 4.9000e- 004 0.0000 3.28393.5000e- 004 1.4500e- 003 1.8100e- 003 9.0000e- 005 1.4000e- 003 1.5000e- 003 Maximum 2.7400e- 003 0.0246 0.0196 4.0000e- 005 0.0000 3.2716 3.2716 4.9000e- 004 0.0000 3.28393.5000e- 004 1.4500e- 003 1.8100e- 003 9.0000e- 005 1.4000e- 003 1.5000e- 003 2018 2.7400e- 003 0.0246 0.0196 4.0000e- 005 CH4 N2O CO2e Year tons/yr MT/yr Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 Unmitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total tblTripsAndVMT VendorTripNumber 0.00 2.00 2.0 Emissions Summary 2.1 Overall Construction tblOffRoadEquipment UsageHours 1.00 0.00 tblTripsAndVMT HaulingTripNumber 0.00 6.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00 tblLandUse LotAcreage 0.00 0.01 tblOffRoadEquipment OffRoadEquipmentType Cranes tblConstructionPhase PhaseEndDate 10/12/2018 10/8/2018 tblLandUse LandUseSquareFeet 0.00 25.00 Table Name Column Name Default Value New Value tblConstructionPhase NumDays 10.00 6.00 6.90 20.00 LD_Mix HDT_Mix HHDTDemolition38.00 2.00 6.00 14.70 Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Trips and VMT Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Demolition Cranes 1 2.00 231 0.29 Demolition Tractors/Loaders/Backhoes 1 6.00 97 0.37 Demolition Rubber Tired Dozers 0 0.00 247 0.40 Load Factor Demolition Concrete/Industrial Saws 1 8.00 81 0.73 OffRoad Equipment Phase Name Offroad Equipment Type Amount Usage Hours Horse Power 6 Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 0 Acres of Paving: 0 Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area: 0 End Date Num Days Week Num Days Phase Description 1 Demolition Demolition 10/1/2018 10/8/2018 5 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date Quarter Start Date End Date Maximum Unmitigated ROG + NOX (tons/quarter)Maximum Mitigated ROG + NOX (tons/quarter) Highest 0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2ROGNOxCOSO2Fugitive PM10 0.0000 0.6252 0.6252 5.0000e- 005 0.0000 0.62633.5000e- 004 1.0000e- 005 3.7000e- 004 9.0000e- 005 1.0000e- 005 1.1000e- 004 Total 1.6000e- 004 1.7800e- 003 1.3200e- 003 0.0000 0.0000 0.2420 0.2420 1.0000e- 005 0.0000 0.24222.6000e- 004 0.0000 2.7000e- 004 7.0000e- 005 0.0000 7.0000e- 005 Worker 1.1000e- 004 8.0000e- 005 9.0000e- 004 0.0000 0.0000 0.1478 0.1478 1.0000e- 005 0.0000 0.14814.0000e- 005 1.0000e- 005 4.0000e- 005 1.0000e- 005 1.0000e- 005 2.0000e- 005 Vendor 2.0000e- 005 7.3000e- 004 2.0000e- 004 0.0000 0.0000 0.2354 0.2354 3.0000e- 005 0.0000 0.23605.0000e- 005 0.0000 6.0000e- 005 1.0000e- 005 0.0000 2.0000e- 005 Hauling 3.0000e- 005 9.7000e- 004 2.2000e- 004 0.0000 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 0.0000 2.6464 2.6464 4.5000e- 004 0.0000 2.65761.4400e- 003 1.4400e- 003 1.3900e- 003 1.3900e- 003 Total 2.5800e- 003 0.0228 0.0183 3.0000e- 005 0.0000 2.6464 2.6464 4.5000e- 004 0.0000 2.65761.4400e- 003 1.4400e- 003 1.3900e- 003 1.3900e- 003 Off-Road 2.5800e- 003 0.0228 0.0183 3.0000e- 005 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 3.2 Demolition - 2018 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 3.1 Mitigation Measures Construction 0.0000 0.6252 0.6252 5.0000e- 005 0.0000 0.62633.5000e- 004 1.0000e- 005 3.7000e- 004 9.0000e- 005 1.0000e- 005 1.1000e- 004 Total 1.6000e- 004 1.7800e- 003 1.3200e- 003 0.0000 0.0000 0.2420 0.2420 1.0000e- 005 0.0000 0.24222.6000e- 004 0.0000 2.7000e- 004 7.0000e- 005 0.0000 7.0000e- 005 Worker 1.1000e- 004 8.0000e- 005 9.0000e- 004 0.0000 0.0000 0.1478 0.1478 1.0000e- 005 0.0000 0.14814.0000e- 005 1.0000e- 005 4.0000e- 005 1.0000e- 005 1.0000e- 005 2.0000e- 005 Vendor 2.0000e- 005 7.3000e- 004 2.0000e- 004 0.0000 0.0000 0.2354 0.2354 3.0000e- 005 0.0000 0.23605.0000e- 005 0.0000 6.0000e- 005 1.0000e- 005 0.0000 2.0000e- 005 Hauling 3.0000e- 005 9.7000e- 004 2.2000e- 004 0.0000 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Mitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 0.0000 2.6464 2.6464 4.5000e- 004 0.0000 2.65761.4400e- 003 1.4400e- 003 1.3900e- 003 1.3900e- 003 Total 2.5800e- 003 0.0228 0.0183 3.0000e- 005 0.0000 2.6464 2.6464 4.5000e- 004 0.0000 2.65761.4400e- 003 1.4400e- 003 1.3900e- 003 1.3900e- 003 Off-Road 2.5800e- 003 0.0228 0.0183 3.0000e- 005 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 Trips and VMT - Additional worker trips and vendor trips added to the building construction phase to account for the delivery of materials. Construction Off-road Equipment Mitigation - 1.3 User Entered Comments & Non-Default Data Project Characteristics - Construction only Land Use - Construction only Construction Phase - Billboard construction will take approximately 2-4 weeks to complete. Off-road Equipment - Estimated construction equipment Off-road Equipment - Estimated construction equipment CO2 Intensity (lb/MWhr) 702.44 CH4 Intensity (lb/MWhr) 0.029 N2O Intensity (lb/MWhr) 0.006 30 Climate Zone 8 Operational Year 2018 Utility Company Southern California Edison 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s)2.2 Precipitation Freq (Days) Floor Surface Area Population User Defined Industrial 1.00 User Defined Unit 0.01 25.00 0 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric Lot Acreage CalEEMod Version: CalEEMod.2016.3.2 Page 1 of 1 Date: 8/30/2018 4:17 PM 0404.0014 City of Orange Billboard Construction - Orange County, Annual 0404.0014 City of Orange Billboard Construction Orange County, Annual 0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2ROGNOxCOSO2Fugitive PM10 0.0000 4.9792 4.9792 1.2100e- 003 0.0000 5.00951.0000e- 003 2.4400e- 003 3.4500e- 003 2.7000e- 004 2.2500e- 003 2.5200e- 003 Maximum 4.6400e- 003 0.0486 0.0254 5.0000e- 005 0.0000 4.9792 4.9792 1.2100e- 003 0.0000 5.00951.0000e- 003 2.4400e- 003 3.4500e- 003 2.7000e- 004 2.2500e- 003 2.5200e- 003 2018 4.6400e- 003 0.0486 0.0254 5.0000e- 005 Total CO2 CH4 N2O CO2e Year tons/yr MT/yr PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 0.0000 4.9793 4.9793 1.2100e- 003 0.0000 5.00951.0000e- 003 2.4400e- 003 3.4500e- 003 2.7000e- 004 2.2500e- 003 2.5200e- 003 Maximum 4.6400e- 003 0.0486 0.0254 5.0000e- 005 0.0000 4.9793 4.9793 1.2100e- 003 0.0000 5.00951.0000e- 003 2.4400e- 003 3.4500e- 003 2.7000e- 004 2.2500e- 003 2.5200e- 003 2018 4.6400e- 003 0.0486 0.0254 5.0000e- 005 CH4 N2O CO2e Year tons/yr MT/yr Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 Unmitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total tblTripsAndVMT WorkerTripNumber 0.00 8.00 2.0 Emissions Summary 2.1 Overall Construction tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 0.00 tblTripsAndVMT VendorTripNumber 0.00 2.00 tblLandUse LotAcreage 0.00 0.01 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00 tblConstructionPhase NumDays 100.00 20.00 tblLandUse LandUseSquareFeet 0.00 25.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 Table Name Column Name Default Value New Value 6.90 20.00 LD_Mix HDT_Mix HHDTBuilding Construction 2 8.00 2.00 0.00 14.70 Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Trips and VMT Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Building Construction Tractors/Loaders/Backhoes 0 8.00 97 0.37 Building Construction Forklifts 1 6.00 89 0.20 Load Factor Building Construction Cranes 1 4.00 231 0.29 OffRoad Equipment Phase Name Offroad Equipment Type Amount Usage Hours Horse Power 20 Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 0 Acres of Paving: 0 Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area: 0 End Date Num Days Week Num Days Phase Description 1 Building Construction Building Construction 10/1/2018 10/26/2018 5 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date Quarter Start Date End Date Maximum Unmitigated ROG + NOX (tons/quarter)Maximum Mitigated ROG + NOX (tons/quarter) Highest 0.0000 1.2993 1.2993 6.0000e- 005 0.0000 1.30101.0100e- 003 3.0000e- 005 1.0200e- 003 2.7000e- 004 3.0000e- 005 2.9000e- 004 Total 4.4000e- 004 2.7100e- 003 3.6600e- 003 2.0000e- 005 0.0000 0.8067 0.8067 2.0000e- 005 0.0000 0.80728.8000e- 004 1.0000e- 005 8.8000e- 004 2.3000e- 004 1.0000e- 005 2.4000e- 004 Worker 3.6000e- 004 2.7000e- 004 2.9900e- 003 1.0000e- 005 0.0000 0.4927 0.4927 4.0000e- 005 0.0000 0.49381.3000e- 004 2.0000e- 005 1.4000e- 004 4.0000e- 005 2.0000e- 005 5.0000e- 005 Vendor 8.0000e- 005 2.4400e- 003 6.7000e- 004 1.0000e- 005 0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Hauling0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 0.0000 3.6799 3.6799 1.1500e- 003 0.0000 3.70852.4200e- 003 2.4200e- 003 2.2200e- 003 2.2200e- 003 Total 4.1900e- 003 0.0459 0.0217 4.0000e- 005 0.0000 3.6799 3.6799 1.1500e- 003 0.0000 3.70852.4200e- 003 2.4200e- 003 2.2200e- 003 2.2200e- 003 Off-Road 4.1900e- 003 0.0459 0.0217 4.0000e- 005 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 Water Exposed Area 3.2 Building Construction - 2018 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 3.1 Mitigation Measures Construction 0.0000 1.2993 1.2993 6.0000e- 005 0.0000 1.30101.0100e- 003 3.0000e- 005 1.0200e- 003 2.7000e- 004 3.0000e- 005 2.9000e- 004 Total 4.4000e- 004 2.7100e- 003 3.6600e- 003 2.0000e- 005 0.0000 0.8067 0.8067 2.0000e- 005 0.0000 0.80728.8000e- 004 1.0000e- 005 8.8000e- 004 2.3000e- 004 1.0000e- 005 2.4000e- 004 Worker 3.6000e- 004 2.7000e- 004 2.9900e- 003 1.0000e- 005 0.0000 0.4927 0.4927 4.0000e- 005 0.0000 0.49381.3000e- 004 2.0000e- 005 1.4000e- 004 4.0000e- 005 2.0000e- 005 5.0000e- 005 Vendor 8.0000e- 005 2.4400e- 003 6.7000e- 004 1.0000e- 005 0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Hauling0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Mitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 0.0000 3.6799 3.6799 1.1500e- 003 0.0000 3.70852.4200e- 003 2.4200e- 003 2.2200e- 003 2.2200e- 003 Total 4.1900e- 003 0.0459 0.0217 4.0000e- 005 0.0000 3.6799 3.6799 1.1500e- 003 0.0000 3.70852.4200e- 003 2.4200e- 003 2.2200e- 003 2.2200e- 003 Off-Road 4.1900e- 003 0.0459 0.0217 4.0000e- 005 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10