Loading...
SR - AGR-6549 - ANNUAL CONCRETE REPLACEMENT VARIOUS LOCATIONS FY 20181. SUBJECT Award of Contract - Bid No. 178 -14, SP -4017; Annual Concrete Replacement at Various Locations, Fiscal Year 2017 -2018 (FY2018). 2. SUMMARY Bids for Annual Concrete Replacement at Various Locations Project, FY18 were received and opened on November 22, 2017. Seven bidders responded to the Notice Inviting Bids. The apparent low bidder is Klassic Engineering of Orange, California in the amount of $292,263. 13. RECOMMENDED ACTION Award the contract in the amount of $292,263 to Klassic Engineering of Orange, California 92866 and authorize the Mayor and the City Clerk to execute on behalf of the City. 4. FISCAL IMPACT Funds are budgeted and available in the following accounts: 263.5021.51700.00000 Measure M — Contractual Services $ 165,000 263.5011.56330.13120 Local Street Maintenance $ 235,000 Total: $ 400,000 15. STRATEGIC PLAN GOAL(S) 1. Provide for a safe community - b. Provide and maintain infrastructure necessary to ensure the safety of the public. 4. Provide outstanding public service — b. Provide facilities and services to meet customer expectations. 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 3.0 Ensure adequate maintenance of public rights -of -way to enhance public safety and improve circulation. Policy 3.1: Continue to maintain and repair sidewalks and pavement surfaces on public rights -of- way. 7. DISCUSSION and BACKGROUND The City Council previously approved advertisement for bids on October 10, 2017. The project was publicly advertised for two weeks. The bids were opened on November 22, 2017. Seven bidders responded as follow: 1. Klassic Engineering $292,263 2. LC Paving $336,370 3. Gentry General Engineering $349,638 4. EBS General Engineering $383,439 5. Concrete Paving Contractor $396,595 6. Hardy & Harper $367,797 7. Nobest Incorporated $662,906 This project is part of the annual street maintenance replacement at various locations for curb and gutter, sidewalk, driveway, and cross gutter. Utilizing the City's Pavement Management Survey ranking of the current street conditions, the City has prepared a list of streets requiring pavement rehabilitation for FY18. The street rehabilitation overlay project will be bid out as a separate project later this fiscal year. This project will replace damaged concrete in specified areas in preparation for to the street rehabilitation overlay project in the fiscal year 2018. The estimated total quantities for the Annual Concrete Replacement Project at Various Locations, FYI is as follows: 1. 1,013 linear feet of curb and gutter 2. 21,790 square feet of sidewalk 3. 689 square feet of driveway apron 4. 160 square feet cross gutter and spandrel 5. 10 each ADA sidewalk access ramps The total estimated construction cost including 10% contingencies and construction engineering is $336,148. Construction is scheduled to begin in late January 2018 and be completed by April 2018. ITEM 2 12/12/17 O Printed on Recycled Paper 8. ATTACHMENTS • Bid Abstract • Contract JD:bs:cp ITEM 2 12/12/17 O Printed on Recycled Paper