SR - - ADVERTISE BIDS ANNUAL CONCRETE REPLACEMENT FY181. SUBJECT Bid No. 178 -14; SP -4017; Annual Concrete Replacement at Various Locations (FY18). Approval of plans and specifications, and authorization to advertise bids for construction. 2. SUMMARY Plans and specifications are complete and ready for the advertisement of bids for the Annual Concrete Replacement at Various Locations Project (FY18). The total estimated construction cost including construction engineering administration is $400,000 which includes 15% for contingency. 3. RECOMMENDED ACTION Approve plans and specifications and authorize advertising for bids for the Annual Concrete Replacement at Various Locations Project (FY18). 4. FISCAL IMPACT Budgeted funds are available in the Capital Improvement Program in the following accounts: 263.5021.51700.00000 Measure M — Contractual Services $ 165,000 263.5011.56330.13120 Local Street Maintenance $235,000 Total: $ 400,000 5. STRATEGIC PLAN GOAL(S) 1. Provide for a safe community - b. Provide and maintain infrastructure necessary to ensure the safety of the public. 4. Provide outstanding public service — b. Provide facilities and services to meet customer expectations. 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 3.0 Ensure adequate maintenance of public rights -of -way to enhance public safety and improve circulation. Policy 3.1: Continue to maintain and repair sidewalks and pavement surfaces on public rights -of- way. 7. DISCUSSION and BACKGROUND This project is the first phase of the City's Pavement Management program and it will address needed concrete work for the forthcoming Annual Street Pavement Maintenance projects and SB- 1 Project list. The work consists of replacing ADA access ramps, failed sections of curb and gutter, driveways, sidewalks, cross gutters, and spandrels. The total estimated quantities for concrete replacement are as follows: 1. 20 ADA access ramps 2. 2,000 linear feet of curb and gutter 3. 20,000 square feet of sidewalk 4. 700 square feet of driveway apron 5. 3,000 square feet cross gutter and spandrel The total estimated construction cost for the annual concrete replacement project is $400,000 with 15% contingency. Construction is estimated to begin in January 2018 and be completed by March 2018. 8. ATTACHMENTS • Plans, specifications, and the engineer's cost estimate are available for review at the Public Works Department. JD;ml:cp N:\Public Works\ADMIN\Corina Perez Council \Council Items - ENGINEERING DIVISION\2017 \10- 10 -17 \SP -4017; Annual Concrete Replacement Project \SP -4017; Auth to Adv Aannual Concrete FY 17- 18.docx ITEM 2 10/24/17 CITY COUNCIL MINUTES OCTOBER 24, 2017 3. CONSENT CALENDAR (Continued) 3.5 Agreement with USA Shade & Fabric Structures for design, materials and installation of shade canopy structures over the tot lot play and exercise equipment at Shaffer Park and appropriation of corresponding Park Development funds for the tot lot play shades. (A2100.0; AGR -6526) ACTION: 1) Appropriated $86,375 from unreserved Fund 510 (Park Acquisition — Infill) to 510.7021.56020.20059 (Tot Lot Shade Sails); 2) Approved agreement with USA Shade & Fabric Structures in the amount not -to- exceed $160,768.68; and 3) Authorized the Mayor and the City Clerk to execute on behalf of the City. 3.6 Number not used. 3.7 Request to accept and appropriate into the City's revenue budget a $41,000 Grant from California Library Literacy Services (CLLS) for FY 2017 -2018 (FY18). (C2500.I) ACTION: Accepted in the City's revenue budget a $41,000 grant from CLLS into revenue account 100.2001.45290.30100, State Grants — CA Literacy (CLLS) FY18; and authorized the appropriation of $41,000 into expenditure account 100.2001.53001.30100, Materials & Supplies -CLLS Grant FY18. 3.8 Request to accept and appropriate into the City's revenue budget a $24,000 donation from the Friends of the Orange Public Library (Friends). (C2500.I) ACTION: Accepted into the City's revenue budget a $24,000 donation from the Friends into revenue account number 100.2001.48390.19990 (Friends Donations); and appropriated $24,000 into the following expenditure account numbers: 100.2001.53011.19990 - FOPL (Employee Recognition Program) $2,000 100.2001.53301.19990 - FOPL (Book Budget) $16,300 100.2004.51423.19990 — FOPL (Maintenance & Equipment) $700 100.2016.53340.19990 - FOPL (Craft supplies- Adult) $500 100.2017.53340.19990 - FOPL (Craft supplies- Children & Teen) $4,500 $24,000 3.9 Bid No. 178 -14; Approval of plans and specifications for Annual Concrete Replacement at Various Locations (FY18). (S4000.S.7) ACTION: Approved plans and specifications and authorized advertising for bids for the Annual Concrete Replacement at Various Locations Project (FY18). PAGE 5