Loading...
SR - BID-178-03 - ADVERTISE BIDS RESERVOIR NO. 4 SLOPE REGRADING1. SUBJECT Bid No. 178 -03; Reservoir No. 4 Slope Re- grading (W -681). 2. SUMMARY Precise Grading Plan and Specifications have been completed for the re- grading of the slope in the south area of Reservoir No. 4. The project is ready to be advertised for bids. The preliminary cost estimate including 15% contingencies for the construction is $70,000. 3. RECOMMENDED ACTION Approve plans and specifications and authorize advertising for bids. 4. FISCAL IMPACT Funds are budgeted and are available in the following account: 600.8011.51401.00000 Repairs to Buildings and Fixed Equipment $177,845 5. STRATEGIC PLAN GOAL(S) 1. Provide for a safe community: b. Provide and maintain infrastructure necessary to ensure the safety of the public. 2. Be a fiscally healthy community: d. Effectively manage and develop City assets. 4. Provide outstanding public service: b. Provide facilities and services to meet customer expectations. 1 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 6.0: Ensure water, sewer, and storm drain systems that meet the needs of residents and businesses. Policy 1.1: Provide sufficient levels of water, sewer, and storm drain service throughout the community. Economic Development Element Goal 6.0: Provide sufficient infrastructure to support anticipated economic development and growth. Policy 6.1: Provide public improvements to support commercial, industrial and institutional uses. 7. DISCUSSION and BACKGROUND Over the years, dirt and debris have collected against the existing neighbors freestanding block wall located along the Reservoir 4's southern perimeter. This is creating a problem for the walls that were not designed to take the resulting lateral loading. To remedy the situation, the Water Division is proposing to re -grade this area and to construct a new concrete V- ditch/terrace drain. This will fix the problem by removing the load from the wall and provide positive drainage for the affected area. The Water Division retained Joseph C. Truxaw and Associates, Inc. to conduct a topographic survey and complete the design. Plans and specifications for this project have been completed and the project is ready to be advertised for bids. The total estimated construction cost including 15% for contingencies and construction engineering is $70,000. Construction is expected to start in the fall 2017 and should be completed within 45 calendar days. 8. ATTACHMENTS • Location Map