SR - AGR-6492 - INSTALLATION OF 12" DUCTILE IRON PIPE UNDERNEATH RAILROAD TRACK ON BATAVIA ST1. SUBJECT Award of Consultant Services Agreement with Joseph C. Truxaw and Associates, Inc. for the design and plan preparation of the 12" water main crossing the railroad track on Batavia Street. 2. SUMMARY Authorize Joseph C. Truxaw and Associates, Inc. to conduct field survey, prepare plans, specifications, cost estimates, and apply /obtain required permit from railroad authority to install approximately 200 feet of 12" Ductile Iron Pipe underneath the railroad track. As this request for engineering service will put the total contract agreement with Joseph C. Truxaw and Associates, Inc. over $30,000 for the fiscal year 17 -18, staff is requesting City Council approval for this service. 3. RECOMMENDED ACTION Award Consultant Service Agreement to Joseph C. Truxaw and Associates, Inc. of Orange, CA, in an amount not to exceed $19,475 and authorize the Mayor and City Clerk to execute the necessary documents on behalf of the City. 4. FISCAL IMPACT Funds are budgeted and are available in the following account: 600.8011.51620.00000 Engineering Services $ 59,268.00 5. STRATEGIC PLAN GOAL(S) Provide for a safe community: b. Provide and maintain infrastructure necessary to ensure the safety of the public. 2. Be a fiscally healthy community: ITEM 7/11/17 1 d. Effectively manage and develop City assets. 4. Provide outstanding public service: b. Provide facilities and services to meet customer expectations. 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 6.0: Ensure water, sewer, and storm drain systems that meet the needs of residents and businesses. Policy 1.1: Provide sufficient levels of water, sewer, and storm drain service throughout the community. Economic Development Element Goal 6.0: Provide sufficient infrastructure to support anticipated economic development and growth. Policy 6.1: Provide public improvements to support commercial, industrial and institutional uses. 7. DISCUSSION and BACKGROUND The existing water main in Batavia St. at the railroad track was constructed in the early 1960s. This water main is aging and considered undersized by current water industry standards for arterial roadway such as Batavia St. Recent breaks along this segment of aged pipe required this water main to be turned off and isolated. As the water main are buried deep below the railroad track, Water Division staff is unable and unequipped to safely make repairs. Staff therefore solicited for proposals from qualified engineering firms that specialize in pipeline design within the railroad authority boundary. The scope of work includes the replacement of approximately 200 linear feet of existing 6" Cast Iron Pipe with new 12" Ductile Iron Pipe to provide a more reliable water service and fire protection to the business and residents in the area. Due to the small scale of the project and the time requirement, only Joseph C. Truxaw and Associates, Inc. and JL Patterson responded. Upon completing review of the submitted proposal, staff recommends award of the contract to Joseph C. Truxaw and Associates, Inc. in the amount of $19,445. As the inclusion of this engineering service will put the total contract agreement with Joseph C. Truxaw and Associates, Inc. over the $30,000 limit for the fiscal year 17 -18, staff is requesting City Council approval of this consultant services agreement. 8. ATTACHMENTS • Location Map • Consultant Services Agreement (Draft)