SR - AGR-6377.1 - CHANGE ORDER NO. 1 COLLINS AVENUE STORM DRAIN IMPROVEMENTS PROJECT1. SUBJECT Contract Change Order No. 1 and Final for Bid No. 156 -47; Collins Avenue Storm Drain Improvements Project (D -170). 2. SUMMARY This Contract Change Order No. 1 authorizes contract payment for extra work at agreed upon lump sum price for the Shaffer Street Storm Drain Improvements Project in the amount of $25,000. 3. RECOMMENDED ACTION 1) Approve Contract Change Order No. 1 in the amount of $25,000 to GRBCON, Inc. 2) Authorize the appropriation of $19,000 from the Sanitation Fund (220) unreserved fund balance to expenditure account 220.5022.56330.30078, Streets -Bio Clean Hydro Unit Collins. 4. FISCAL IMPACT Upon appropriation, funds will be available to cover the cost of the project as follows: 220.5022.56330.30078 Streets -Bio Clean Hydro Unit Collins $25,231 5. STRATEGIC PLAN GOAL(S) 1. Provide for a safe community — b. Provide and maintain the infrastructure necessary to ensure the safety of the public 4. Provide outstanding public service — b. Provide facilities and services that meet customer expectations. 6. GENERAL PLAN IMPLEMENTATION Infrastructure Goal 1.0 Ensure water, sewer, and storm drain systems that meet the needs of residents and businesses. Policy 1.1: Provide sufficient levels of water, sewer, and storm drain service throughout the community. Policy 1.2: Correct known deficiencies in the City's sewer, storm drain, and water systems and work toward environmentally sustainable systems. Natural Resources Elements Goal 2.0 Protect air, water, and energy resources from pollution and overuse. Policy 2.13: Control surface runoff water discharges into the storm water conveyance system to comply with the City's National Pollutant Discharge Elimination system (NPDES) Municipal Permit and other regional permits issued by the Santa Ana Regional Water Quality Control Board. Policy 2.16: Protect in- stream habitat and natural stream and channel features. 7. DISCUSSION and BACKGROUND The City Council awarded the Collins Avenue Storm Drain Improvement Project on August 9, 2016, to GRBCON Inc. A hydrodynamic separator was installed at the downstream end of the existing 48" reinforced concrete pipe (RCP) storm drain line west of Eckhoff Street that currently discharges into the Santa Ana River. The storm drain line collects runoff from a 54 -acre drainage area. The hydrodynamic separator and pipe screens will capture trash, sediment, bacteria, organic matter, nutrients, pesticides, and other debris to minimize pollutants that enter the Santa Ana River. Prior to the start of work, the Bio Clean unit was relocated to the parking lot of the County Corporation Yard from Collins Avenue for easier maintenance access and to lessen the construction impacts to the businesses in the area. Staff negotiated a change order of $ 25,000 for the cost of relocating the unit due to increased depth of the trench, excavation, and backfill material. The original contract amount was $196,630. This Contract Change Order represents a 12.71% increase from the original contract amount bringing the contract amount to $221,630. 8. ATTACHMENTS • Final CCO