Loading...
SR - BID-167-03 - REJECTION OF BIDS FOR HSIP PEDESTRIAN CROSSINGS UPGRADE1. SUBJECT Bid No. 167 -03; SP -3857; Federal Highway Safety Improvement Program (HSIP) Pedestrian Crossings Upgrade at fourteen Intersections, rejection of all bids. 2. SUMMARY The bids for the HSIP Pedestrian Crossing Upgrade at fourteen Intersections Project were received and opened on March 16, 2017. Nine bidders responded to the Notice Inviting Bids. The lowest bid of $280,660 from L.A. Traffic Signal Transportation Inc. was higher than available construction funding. Staff recommends rejection of all bids and requests authorization to re- advertise the project with a reduced scope of work. 3. RECOMMENDED ACTION 1) Reject all bids received. 2) Authorized staff to re- advertise the project with a reduced scope of work. 4. FISCAL IMPACT Upon appropriation, funds will be available as follows: 550.5032.56100.20194 HSIP Pedestrian Crossing Upgrades $ 240,968 263.5032.56100.20194 M2 Pedestrian Crossing Upgrades 15,406 $ 256,374 5. STRATEGIC PLAN GOAL(S) 7=:::] Lb Provide for a safe community — Provide and maintain infrastructure necessary to ensure the safety of the public. 6. GENERAL PLAN IMPLEMENTATION Infrastructure Goal 3.0 Ensure adequate maintenance of public rights -of -way to enhance public safety and improve circulation. Policy 3.3: Continue to design, install, and maintain signals, signage, street lights, and traffic control devices within rights -of -way 7. DISCUSSION and BACKGROUND The City Council approved authorization to advertise the project for construction bids on August 9, 2016, contingent on receipt of Caltrans' "Authorization to Proceed with Construction" (E76). Caltrans eventually issued the E76 in January 2017. The bid solicitation was advertised on February 22, 2017, for a period of three weeks, and the bids were opened on March 16, 2017. Nine bids were received as follows: 1) LA Traffic Signal Transportation, Inc., Pasadena ...................$280,660.00 2) Elecnor Belco Electric, Inc., Chino ...................... .....................289,753.00 3) California Professional Engr. Inc., La Puente ....... .....................309,578.00 4) Aegis ITS, Anaheim .............. ............................... .....................314,154.04 5) ND Construction Co. Inc., Anaheim .................... .....................319,156.50 6) MSL Electric, Inc., Anaheim . ............................... .....................325,885.00 7) DBX Inc., Temecula .............. ............................... .....................364,259.00 8) Traffic Loops Crackfilling, Inc., Anaheim ........... .....................424,982.50 9) Comet Electric, Inc., Chatsworth .......................... .....................426,081.00 With the low bid of $ 280,660 and the necessity to include 15% for contingencies and construction engineering, the total project cost would be approximately $ 322,759, exceeding the total construction funds of $250,000. Staff is recommending rejection of all bids and requests authorization to re- advertise the project with a reduced scope of work. The upgrade to existing sidewalk access ramps and painting of high visibility crosswalks will be removed to reduce costs. The painting of visibility crosswalks will be added to the City's annual striping contract at a more reasonable cost. 8. ATTACHMENTS • Bid Abstract • Location Map