Loading...
SR - - CDBG WHEELCHAIR ACCESS RAMPS VARIOUS LOCATIONS FY171. SUBJECT Bid No. 167 -24; SP -3983; Community Development Block Grant (CDBG) Americans with Disabilities Act (ADA) Wheelchair Access Ramps at Various Locations Project for the fiscal year 2017 (FYI 7). 2. SUMMARY Bids for CDBG ADA Wheelchair Access Ramps at Various Locations Project, FY17 were received and opened on February 16, 2017. Seven bidders responded to the Notice Inviting Bids. The lowest bidder was deemed non - responsive, therefore staff is recommending the award to the second lowest bidder. 3. RECOMMENDED ACTION Reject the bid received from the apparent low bidder, C.J. Concrete Construction, Inc., a California Corporation, on the basis that the bid was not responsive. 2. Award the contract to Nobest, Inc. in an amount not to exceed $225,000 and authorize the Mayor and City Clerk to execute the necessary documents on behalf of the City. 4. FISCAL IMPACT Budgeted funds are available in the Capital Improvement Program in the following account: 310.9645.56330.11328 CDBG — ADA Improvements $ 261,158 5. STRATEGIC PLAN GOAL(S) 1. Provide for a safe community — b. Provide and maintain infrastructure necessary to ensure the safety of the public. 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 3.0 Ensure adequate maintenance of public rights -of -way to enhance public safety and improve circulation. Policy 3.1: Continue to maintain and repair sidewalks and pavement surfaces on public rights -of- way. 7. DISCUSSION and BACKGROUND The City Council previously approved advertisement for bids at the January 10, 2017, meeting. The bid solicitation was advertised on February 1, 2017 for two weeks, and bids were opened on February 16, 2017. Seven bidders submitted proposals as follows: 1) CJ Concrete Construction, Inc. $219,100 2) Nobest, Inc. $225,000 3) Vido Samarzich, Inc. $225,550 4) Golden State Constructors, Inc. $227,000 5) EBS Engineering, Inc. $229,100 6) STL Landscape, Inc. $239,300 7) Calpromax Engineering, Inc. $274,700 Upon review of bids received, staff determined that CJ Concrete Construction, Incorporated was not responsive to and did not conform in all material respects to the specifications contained in the City's invitation to bid. CJ Concrete failed to meet the DBE goal of 6% or to show Good Faith Efforts. The second lowest bid in the amount of $225,000 was received from Nobest Incorporated. City staff is recommending to award the project to Nobest, Incorporated who did meet all material respects to the specifications contained in the City's invitation to bid. The engineer's estimate for this project is $223,000. This project will provide for the construction of approximately 50 ADA wheelchair access ramps at various locations, citywide. As part of this project, detectable warning surfaces (truncated domes) will be installed per the American with Disabilities Act Accessibility Guidelines (ADAAG) requirements. The City receives CDBG funding from the U.S. Department of Housing and Urban Development for activities that primarily benefit Low and Moderate Income Residents. Construction of ADA compliant access ramps citywide qualifies for CDBG funding because the ramps benefit disabled residents that are considered to be low- income. ITEM 3 3/14/17 S. ATTACHMENTS • Bid Abstract • Location Map