Loading...
SR - BID 167-27 - ADVERTISE BIDS FY 17 ANNUAL CONCRETE REPLACEMENT VARIOUS LOCATIONS1. SUBJECT Bid No. 167 -27; SP -3987; FY 17 Annual Concrete Replacement at Various Locations. Approval of plans and specifications, and authorization to advertise. 2. SUMMARY Plans and specifications are complete and ready for the advertisement of bids for the FY 17 Annual Concrete Replacement at Various Locations Project. The total estimated construction cost including construction - engineering administration is $300,000, which includes a 15% contingency. 3. RECOMMENDED ACTION Approve plans and specifications and authorize advertising for bids for the FY 17 Annual Concrete Replacement at Various Locations Project. 4. FISCAL IMPACT Budgeted funds are available in the following accounts: 263.5021.51700.00000 Traffic Improvement - Measure M2 $ 165,000 Contractual Services 263.5011.56330.13120 Traffic Improvement — Measure M2 $ 135,000 Pavement Management Program Total: $ 300,000 5. STRATEGIC PLAN GOAL(S) lb. Provide for a safe community - Provide and maintain infrastructure necessary to ensure the safety of the public. ITEM . 13 1 02/14/17 Q Printed on Recycled Paper 4b. Provide outstanding public service - Provide facilities and services to meet customer expectations. 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 3.0 Ensure adequate maintenance of public rights -of -way to enhance public safety and improve circulation. Policy 3.1: Continue to maintain and repair sidewalks and pavement surfaces on public rights - of -way. 17. DISCUSSION and BACKGROUND I This project is part of the annual street maintenance replacement at various locations for curb and gutter, sidewalk, driveway, and cross gutter. Utilizing the City's Pavement Management Survey ranking of the current street conditions, the City has prepared a list of streets requiring pavement rehabilitation for FY17. The street rehabilitation overlay and slurry seal project will be bid out as a separate project later this fiscal year. This project will replace damaged concrete in specified areas prior to the street overlay and slurry seal project. The total estimated quantities for concrete replacement are as follows: 1. 1,100 linear feet of curb and gutter 2. 18,000 square feet of sidewalk 3. 700 square feet of driveway apron 4. 3,000 square feet cross gutter and spandrel 5. 10 ADA sidewalk access ramps The total estimated construction cost for the annual concrete replacement project is $300,000 with a 15% contingency. Construction is estimated to begin in March 2017 and be completed by June 2017. 8. ATTACHMENTS • Plans, specifications and the engineer's cost estimate are available for review at the Public Works Department. JD;ml:cp N:\Public WorkSWDMIN\Corina Perez \Council Items - ENGINEERING DIVISION\Feb- 2017\2- 14 -17 \SP -3987 Auth to Adv Aannual Concrete FY 16- 17.docx ITEM 2 02/14/17 O pPrinted on Recycled Paper