Loading...
SR - AGR-6379 - RESERVOIR 2 PAVING PROJECT1. SUBJECT Final Contract Change Order for Agreement No. 6379, Bid No. 156 -45; Reservoir 2 Paving Project (W -675). 2. SUMMARY The Final Contract Change Order authorizes payment for extra work completed at an agreed upon lump sum price. The total cost for this change order is $12,186. 3. RECOMMENDED ACTION 1) Authorize the appropriation of $12,186 from the water fund unreserved fund balance to Account No. 600.8041.53830.00000, Asphalt Products. 2) Approve Final Contract Change Order in the amount of $12,186 to Hardy & Harper, Inc. for additional cost. 4. FISCAL IMPACT Upon additional appropriation, funds will be available to cover the total cost of the project as follows: 600.8041.53830.00000 Asphalt Products $ 12,186 5. STRATEGIC PLAN GOAL(S) 1. Provide for a safe community: b. Provide and maintain infrastructure necessary to ensure the safety of the public. 2. Be a fiscally healthy community: d. Effectively manage and develop City assets. 4. Provide outstanding public service; b. Provide facilities and services to meet customer expectations. 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 6.0: Ensure water, sewer, and storm drain systems that meet theneeds of residents and businesses. Policy 1.1: Provide sufficient levels of water, sewer, and storm drain service throughout the community. Economic Development Element Goal 6.0: Provide sufficient infrastructure to support anticipated economic development and growth. Policy 6.1: Provide public improvements to support commercial, industrial and institutional uses. 7. DISCUSSION and BACKGROUND Reservoir 2 has an existing 2" asphalt surface that was constructed in 1958 and has been deteriorating over the years. Visible cracks and settlement are observed throughout the site. To better protect the reservoir site and provide a drivable surface for maintenance vehicles, the Water Division is proposing to replace the existing asphalt surface with a thicker paving section. The site will also be re- graded to improve the drainage pattern. The scope of work for this project includes the installation of 3" asphalt concrete over 4" aggregate base, 8" AC curb around the site perimeter, and adjustment of utility valves to grade. The contract was awarded to Hardy & Harper, Inc. in the amount of $105,361. Construction began on October 25, 2016 and is completed. Due to proximity of the jobsite to ChildTime (childcare) and to minimize asphalt fumes, the City agreed to Childtime's request to perform the paving work on two Saturdays. In addition, the City slurry sealed Childtime's parking lot adjacent to the reservoir easement driveway, raised a buried manhole and additional cost for extra tonnage of AC and Aggregate Base for a total amount of $12,186. The original contract amount is $105,361. This Final Contract Change Order in the amount of $12,186, represents an 11.57% increase from the original amount. This brings the total contract amount to $117,547. 8. ATTACHMENTS • Contract Change Order 41 -Final ITEM 1/10/17 CITY COUNCIL MINUTES JANUARY 10, 2017 3. CONSENT CALENDAR (Continued) CONTRACTS 3.9 Approval of a contract with Turboscape, Inc. for annual and as needed replenishment of certified playground wood chips for park tot lots. (A2100.0; AGR -6441) ACTION: Approved contract with Turboscape, Inc. in the amount not to exceed $150,000; and authorized the Mayor and City Clerk to execute on behalf of the City. 3.10 Final Contract Change Order for Agreement No. 6379, Bid No. 156 -45; Reservoir 2 Paving Project (W -675). (A2100.0; AGR -6379) ACTION: 1) Authorized the appropriation of $12,186 from the water fund unreserved fund balance to Account No. 600.8041.53830.00000, Asphalt Products; and 2) Approved Final Contract Change Order in the amount of $12,186 to Hardy & Harper, Inc. for additional cost. 3.11 Final Acceptance of Bid No. 156 -47; Collins Avenue Storm Drain Improvement Project performed by Grbcon, Inc.; and authorization to file the Notice of Completion with the County Recorder. (No staff report required.) ACTION: Accepted public work improvements, authorized release of SureTec Insurance Company of Texas Bond No. 4409025 in the amount of $234,530.00 to the contractor on said job; and authorized the Mayor and City Clerk to execute the Notice of Completion. QUITCLAIMS 3.12 Quitclaim of an old Santa Ana Irrigation Company (S.A.V.I.) easement at 2935 E. Walnut Avenue. (D4000.0) ACTION: Authorized the Mayor and City Clerk to execute a Quitclaim Deed to the property owner, GS Home Services, LLC, for the S.A.V.I. easement located at 2935 E. Walnut Avenue. REPORTS 3.13 Request to reclassify several Library Page and Library Clerk positions. (C2500.I) ACTION: 1) Approved the reclassification of a full -time Library Page position as a full - time Library Clerk position; 2) Approved the reclassification of a 20 -hour Library Clerk position to a 20 -hour Library Page position; and 3) Approved the reclassification of a 19- hour Library Clerk position to a 19 -hour Library Page position. PAGE 6