Loading...
SR - BID 167-24 - ADVERTISE BIDS CDBG ADA WHEELCHAIR ACCESS RAMPS AT VARIOUS LOCATIONS FY171. SUBJECT Bid No. 167 -24; SP -3983; Community Development Block Grant (CDBG) Americans with Disabilities Act (ADA) Wheelchair Access Ramps at Various Locations Project for fiscal year 2017 (FY17) — Approval of plans and specifications, authorization to advertise bids for construction. 2. SUMMARY Plans and specifications are complete and ready for the advertisement of bids for the CDBG- funded ADA Wheelchair Access Ramps at Various Locations Project FY17. The total estimated construction cost, including construction engineering administration, is $250,000 which includes 15% for contingency. 3. RECOMMENDED ACTION Approve plans and specifications and authorize advertising for bids for the CDBG ADA Wheelchair Access Ramps at Various Locations FY17. 4. FISCAL IMPACT Budgeted funds are available in the Capital Improvement Program in the following account: 310.9645.56330.11328 CDBG — ADA Improvements $ 250,000 5. STRATEGIC PLAN GOAL(S) lb. Provide for a safe community - Provide and maintain the infrastructure necessary to ensure the safety of the public. 4b. Provide outstanding public service - Provide facilities and services to meet customer expectations. 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 3.0 Ensure adequate maintenance of public right -of -way to enhance public safety and improve circulation. Policy 3.1: Continue to maintain and repair sidewalks and pavement surfaces on the public right - of -way. 17. DISCUSSION and BACKGROUND This project will provide for the construction of approximately 50 ADA wheelchair access ramps at various locations, City -wide. As part of this project, detectable warning surfaces (truncated domes) will be installed per the American with Disabilities Act Accessibility Guidelines (ADAAG) requirements. The City receives CDBG funding from the U.S. Department of Housing and Urban Development for activities that primarily benefit Low and Moderate Income Residents. Construction of ADA compliant access ramps City -wide qualifies for CDBG funding because the ramps provide assistance to the disabled residents who are considered to be Low Income. The proposed project is categorically exempt from the provisions of the California Environmental Quality Act (CEQA) under CEQA Guidelines Section 15301" Existing Facilities" Class 1 (c). The Notice of Exemption is on file with the County Recorder's Office. The proposed project is also categorically excluded from the provisions of the National Environmental Policy Act (NEPA) under CFR 24 Section 58.35. Documentation of the exclusion determination is on file. The project duration is 30 calendar days, and construction is scheduled to begin in February 2017. 8. ATTACHMENTS • Location Map • Plans, specifications, and the engineer's cost estimate are available for review in the Public Works Department. JD: ml:ly N:\Public Works \Active Construction Project \SP -XXXX CDBG ADA Wheelchair Access Ramps FY 16- 17\ADA Ramp 16 -17 - Auth to Advertise- DRAFT.docx ITEM 2 01/10/17 CITY COUNCIL MINUTES JANUARY 10, 2017 3. CONSENT CALENDAR (Continued) BIDS 3.5 Bid No. 167 -19; Approval of plans and specifications, and request authorization to advertise for bids — two (2) Federal Highway Safety Improvement Program (HSIP) Left -Turn Phasing Signal Modification Projects: 1) Collins Avenue at Batavia Street; and 2) Chapman Avenue at Cannon Street. (S4000.0) ACTION: Approved the plans and specifications, and authorized advertising for bids the HSIP Left -Turn Phasing Signal Modification projects: 1) Collins Avenue at Batavia Street; and 2) Chapman Avenue at Cannon Street. 3.6 Bid No. 167 -21; Approval of plans and specifications, and request authorization to advertise for bids for construction of Orangewood Avenue and Katella Avenue Water Quality Storm Drain Improvements, FY 2016 -2017 (D -172). (C2500.M.17) ACTION: Approved plans and specifications and authorized advertising for bids for Orangewood Avenue and Katella Avenue Water Quality Storm Drain Improvements, FY 2016 -2017 (D -172). 3.7 Bid No. 167 -24; Approval of plans and specifications, and request authorization to advertise for bids for Community Development Block Grant (CDBG) Americans with Disabilities Act (ADA) Wheelchair Access Ramps at Various Locations Project for Fiscal Year 2017 (FY17). (S4000.S.3.2) ACTION: Approved plans and specifications and authorized advertising for bids for the (FY17) CDBG ADA Wheelchair Access Ramps at Various Locations. 3.8 CLAIMS (C3200.0) The following claim(s) have been received and investigated by the City Attorney's Office and /or the Risk Manager. After a thorough investigation with the involved departments, it is the recommendation of the City Attorney's Office that the claim(s) be denied. a. Christian Suarez b. Catherine Delligatta c. Julia Beam d. Rafael Salgado ACTION: Denied Claim(s) for damages and referred to City Attorney and Adjuster. PAGE 5