Loading...
SR - AGR-6435 - WATER DIVISION ANTENNA TOWER INSTALLATION PROJECT1. SUBJECT Award of Contract for Bid No. 167 -15 for the Water Division Antenna Tower Installation Project (W -679). 2. SUMMARY Three bids for the Water Division Antenna Tower Installation Project (Bid No. 167 -15; W -679) were received and opened on November 10, 2016. The apparent low bidder is Tashjian Tower Corporation of Fowler, CA for $137,303. 3. RECOMMENDED ACTION Award contract in the amount of $137,303 to Tashjian Tower Corporation and authorize the Mayor and City Clerk to execute the necessary documents on behalf of the City. 4. FISCAL IMPACT Funds are budgeted and are available in the following accounts: 600.8011.56020.18101 Water Utility Security Improvements $ 220,588 5. STRATEGIC PLAN GOAL(S) 1. Provide for a safe community: b. Provide and maintain infrastructure necessary to ensure the safety of the public. 2. Be a fiscally healthy community: d. Effectively manage and develop City assets. 4. Provide outstanding public service: b. Provide facilities and services to meet customer expectations. ITEM 3. 1 b 1 12/13/16 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 6.0: Ensure water, sewer, and storm drain systems that meet the needs of residents and businesses. Policy 1.1: Provide sufficient levels of water, sewer, and storm drain service throughout the community. Economic Development Element Goal 6.0: Provide sufficient infrastructure to support anticipated economic development and growth. Policy 6.1: Provide public improvements to support commercial, industrial and institutional uses. 7. DISCUSSION and BACKGROUND As a part of the Water Division camera surveillance system and Supervisory Control and Data Acquisition ( SCADA) upgrade project, the installation of a new antenna tower is necessary to support the upgraded system receiver equipment and SCADA antennas. The new antenna tower will be located at the Water Plant Headquarters and will replace the existing undersized antenna. The scope of work for this project includes furnishing and installing a new 100 -foot tower, structural footings, equipment enclosures and pad, cable vault, spooling enclosure, installing electrical /communication conduits, grounding, climbing ladder with safety cable, cable management ladder, grounding and antenna/dismounts installed at the specified elevations. The engineering estimate for construction costs for this project is $110,000. The bids were received and opened on November 10, 2016. Three bidders responded as follows: CONTRACTOR AMOUNT Tashjian Towers Corporation $137,303 Petroleum Telcom Inc. $158,158 Metro Builders & Engineers Group, Ltd. $179,460 Staff conducted license and reference checks with other agencies and companies including the County of Ventura, Kern County School District, Sandia National Labs, and PG &E (Tulare Lake Substation). All agencies and companies contacted provided positive feedback and good reviews on the performance of Tashjian Towers Corporation. Therefore, staff recommends the awarding of the contract to Tashjian Towers Corporation in the amount of $137,303. Construction is scheduled to begin in January 2017 and is expected to be completed within 90 calendar days. 8. ATTACHMENTS • Bid Results