SR - AGR-6348 - TUSTIN/VANOWEN TRAFFIC SIGNAL MODIFICATION FINAL CONTRACT CHANGE ORDER2. SUMMARY The Final Contract Change Order authorizes payment for extra work completed. The extra work included an increase in bid item quantities for unclassified excavation, asphalt concrete, sidewalk, and additional pavement work. The total cost for this change order is $31,044.60. 13. RECOMMENDED ACTION 1) Approve Final Contract Change Order in the amount of $31,044.60 to California Professional Engineering, Inc. for the extra work; and 2) Authorize the appropriation of $5,000 from the Transportation System Improvement Program (284) unreserved fund balance to expenditure account 284.5032.56100.20244 TustinNanowen Traffic Signal Modification; and 3) Authorize the increase in purchase order expenditures in the following account: 284.5032.56100.20244 Tustin / Vanowen Traffic Signal Modification $ 31,044.60 4. FISCAL IMPACT Upon additional appropriation, funds will be available to cover the total cost of the project as follows: 284.5032.56100.20244 Tustin/Vanowen Traffic Signal Modification $ 34,000 15. STRATEGIC PLAN GOAL(S) I lb. Provide for a safe community — Provide and maintain infrastructure necessary to ensure the safety of the public. 3d. Enhance and promote quality of life in the community- Maintain and improve multi -modal transportation throughout the City. Final Contract Change Order for Agreement No. 6348, Bid No. 156 -33; Tustin Street and Vanowen Avenue Traffic Signal Modification (SP- 3927). 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 3.0 Ensure adequate maintenance of public rights -of -way to enhance public safety and improve circulation. Policy 3.3: Continue to design, install, and maintain signals, signage, streetlights, and traffic control devices within rights -of -way 7. DISCUSSION and BACKGROUND On May 10, 2016, the City Council awarded the contract for the Tustin Street and Vanowen Avenue Traffic Signal Modification Project to California Professional Engineering, Inc. During the course of construction for the traffic signal modifications, several issues were encountered necessitating the change order. These include additional pavement rehabilitation on the northbound south leg of Tustin Street, and unsuitable subgrade encountered on Vanowen Avenue. The change order also includes adjustments to the bid item quantities for unclassified excavation, asphalt concrete, sidewalk, and curb and gutter. The project account balance is approximately $29,000. Staff is requesting an additional appropriation of $5,000 from unreserved 284 funds to cover the contract shortfall and staff time for project closeout. The original contract amount is $355,156. This Final Contract Change Order in the amount of $31,044.60, represents an 8.74% increase in the construction contract to $386,200.60. 18. ATTACHMENTS • Final Contract Change Order A R - 1034V Recorded in Official Records, Orange County Hugh Nguyen, Clerk- Recorder RECORDING REQUESTED BY AND 11 111111111, II I 1 1 111 1 NO FEE i WHEN RECORDED MAIL TO: * $ 8 0 0 0 8 9 2 6 6 8 5 $ * 2016000635120 2:05 pm 12/14116 City of Orange 143 413 N12 1 300 East Chapman Avenue 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Orange, California 92866 Attention: City Clerk [Space above this line for Recorder's use only.] THIS DOCUMENT IS RECORDED AT THE REQUEST AND FOR THE BENEFIT OF THE CITY OF ORANGE AND IS EXEMPT FROM THE PAYMENT OF A RECORDING FEE PURSUANT TO GOVERNMENT CODE SECTIONS 6103 AND 27383. NOTICE OF COMPLETION AND ACCEPTANCE NOTICE IS HEREBY GIVEN that work on that certain public work and improvements known as Bid No. 156 -33 O`c "Tustin Street and Vanowen Avenue Traffic Signal Modification (SP- 3927)" (herein referred to as the "Project "), for the owner, the City of Orange, a municipal corporation (herein referred to as the "City "), whose address is 300 E. Chapman Avenue, Orange, CA 92866, was completed and accepted by the City Council of the City of Orange on November 9, 2016 at a regular meeting of its members, at which a quorum was present and acting throughout. The Project is located at the intersection of Tustin Street and Vanowen Avenue in the City of Orange, State of California. The contractor who performed (or caused to be performed) said public work and improvements was California Professional Engineering, Inc., a California corporation authorized to do business in the State of California, with its principal office at 929 Otterbein Avenue, Unit E in the City of La Puente, CA 91748. The name of the surety on the Labor and Material Bond for the Project is Allied World Insurance Company of New Hampshire (Bond No. S001 -3042) in the amount of $355,156.00. DATED as of the 9t day of November, 2016. CITY OF ORANGE, a municipal corporation B --._....6...._ _ _. / . Teresa E. Smith Mayor of the City of Orange STATE OF CALIFORNIA COUNTY OF ORANGE I, Teresa E. Smith, Mayor of the City of Orange, state that I have read the foregoing document, know the contents thereof, and that the facts therein stated are true of my own knowledge. I hereby declare under penalty of perjury that the foregoing is true and correct. DATED as of the 9t day of November, 2016 at Orange, California. Teresa . Smith, Mayor of the City of Orange I, Mary E. Murphy, City Clerk for the City of Orange, hereby attest that Teresa E. Smith is known to me to be the Mayor of the City of Orange and known to me to be the person who executed the within instrument on behalf of said municipal corporation, and acknowledged to me that the City of Orange executed e same. r r Mary E. d rphy, City Clerk of the City ()flab- CITY COUNCIL MINUTES NOVEMBER 9, 2016 3. CONSENT CALENDAR (Continued) 3.23 CLAIMS (C3200.0) The following claim(s) have been received and investigated by the City Attorney's Office and /or the Risk Manager. After a thorough investigation with the involved departments, it is the recommendation of the City Attorney's Office that the claim(s) be denied. a. Jessica Fogla b. Kathleen Caruana c. County of Orange d. Ashruf and Laurie Shenouda e. Carleen R. Navarro f. Eddie Licea g. Alliance United Insurance Company als /o Francisco Moreno ACTION: Denied Claim(s) for damages and referred to City Attorney and Adjuster. CONTRACTS 3.24 Award of Contract — Bid No. 167 -07; City Hall HVAC Roof Top Units Replacement Project. (A2100.0; AGR -6420) ACTION: Awarded the contract in the amount of $256,122 to NKS Mechanical Contracting Inc.; and authorized the Mayor and City Clerk to execute the necessary documents on behalf of the City. 3.25 Final Contract Change Order for Agreement No. 6348, Bid No. 156 -33; Tustin Street and Vanowen Avenue Traffic Signal Modification (SP- 3927). (A2100.0; AGR -6348) ACTION: 1) Approved Final Contract Change Order in the amount of $31,044.60 to California Professional Engineering, Inc. for the extra work; 2) Authorized the appropriation of $5,000 from the Transportation System Improvement Program (284) unreserved fund balance to expenditure account 284.5032.56100.20244 Tustin/Vanowen Traffic Signal Modification; and 3) Authorized the increase in purchase order expenditures in the following account: 284.5032.56100.20244 Tustin/Vanowen Traffic Signal Modification $ 31,044.60 3.26 Final Acceptance of Bid No. 156 -33; Tustin Street and Vanowen Avenue Traffic Signal Modification performed by California Professional Engineering, Inc.; and authorize the Mayor and City Clerk to execute the Notice of Completion. (No staff report required.) ACTION: Accepted public works improvements, authorized release of Allied World Insurance Company of New Hampshire Bond No. S001 -3042 in the amount of $355,156 to the contractor on said job; and authorized the Mayor and the City Clerk to execute the Notice of Completion. PAGE 6