SR - AGR-6392 - CDBG ALLEY & STREET IMP PROJECT HIGHLAND STREET NEIGHBORHOOD1. SUBJECT Bid No. 167 -02; Award of Fiscal Year 2015 -16 (FY16) Community Development Block Grant (CDBG) Alley and Street Improvements Project: Highland Street Neighborhood (SP- 3935). 2. SUMMARY The bids for the Fiscal Year 2015 -16 (FY16) CDBG Alley and Street Improvements Project were received and opened on August 18, 2016. Five (5) bidders responded to the Notice Inviting Bids. The apparent low bidder is All American Asphalt of Corona, CA for $403,909.30. The Engineer's original estimate was $425,300 including 15% contingencies and staff cost. 3. RECOMMENDED ACTION Award the contract in the amount of $403,909.30 to All American Asphalt, and authorize the Mayor and City Clerk to execute the necessary documents on behalf of the City. 4. FISCAL IMPACT CDBG funds of $468,498 are currently appropriated for this project. 310.9645.56330.20125 (Highland Street Neighborhood) $ 468,498 5. STRATEGIC PLAN GOAL(S) lb. Provide for a safe community - Provide and maintain infrastructure necessary to ensure the safety of the public. 4b. Provide outstanding public service - Provide facilities and services to meet customer expectations. 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 3.0 Ensure adequate maintenance of public rights -of -way to enhance public safety and improve circulation. Policy 3.1: Continue to maintain and repair sidewalks and pavement surfaces on public rights - of -way. 7. DISCUSSION and BACKGROUND The Federal CDBG Program provides grant funds to enable eligible localities to upgrade Low and Moderate Income Areas within their jurisdictions. Based on 2010 Census data and supplemental 2014 American Community Survey, designated areas within the City of Orange qualify for CDBG funds. Eligible activities include infrastructure upgrades such as street and alley improvements. The streets and alleys for this project were rated in the Citywide Pavement Management Program with a Pavement Condition Index (PCI) ranging from 16 -49 (out of a maximum score of 100) indicating the need for street rehabilitation and alley reconstruction. The scope of street rehabilitation, in general consists of, but is not limited to ADA compliant access ramps, localized removal and replacement of the existing pavement, asphalt concrete overlay, removal and replacement of failed sections of curb and gutter, driveways, sidewalks, cross gutters, spandrels, and adjustment of manholes and water valve covers to grade. The scope of alley reconstruction, in general consists of, but is not limited to complete removal and replacement of the existing pavement, driveways, cross gutters, and adjustment of manholes and water valve covers to grade. The City Council previously approved advertisement for bids on July 12, 2016. The bid solicitation was advertised on July 27, 2016 for a period of three weeks, and bids were opened on August 18, 2016. The five received bids are as follows: 1) All American Asphalt, Corona ........ ............................... $ 403,909.30 2) Hardy & Harper Inc., Santa Ana ..... ............................... $ 456,000.00 3) RJ Noble, Orange ............................ ............................... $ 479,622.65 4) EBS General Engineering Inc., Corona ......................... $ 493,763.55 5) Palp Inc., DBA Excel Paving Company, Long Beach... $ 547,864.00 The revised estimated total project cost is $464,495, which includes the apparent low bid of $403,909.30, and approximately 15% contingencies and staff cost. The proposed project is categorically exempt from the provisions of the California Environmental Quality Act (CEQA) under CEQA guidelines Section 15301 "Existing Facilities" Class 1 (c). The CEQA Notice of Exemption has been filed with the County Recorder's Office. The proposed project is also categorically excluded from the provisions of the National Environmental Policy Act (NEPA) under 24 CFR Section 58.35. Documentation of this determination is on file. Construction is scheduled to begin in October 2016 and is expected to be completed within 45 calendar days. 8. ATTACHMENTS • Bid Abstract • Location Map CITY COUNCIL MINUTES SEPTEMBER 13, 2016 3. CONSENT CALENDAR (Continued) BIDS 3.12 Bid No. 167 -07; Approval of plans and specifications, and authorization to advertise for bids for City Hall HVAC Roof Top Units Replacement Project. (C2500.M.5) ACTION: Approved plans and specifications and authorized advertising for bids for City Hall HVAC Roof Top Units Replacement Project. 3.13 CLAIMS (C3200.0) The following claim(s) have been received and investigated by the City Attorney's Office and /or the Risk Manager. After a thorough investigation with the involved departments, it is the recommendation of the City Attorney's Office that the claim(s) be denied. a. County of Orange b. Guadalupe Cisneros c. Melissa Gority d. Norma Jean Murphy e. Mario Ernesto Murillo f. Steve Cavenee ACTION: Denied Claim(s) for damages and referred to City Attorney and Adjuster. CONTRACTS 3.14 Award of Contract — Bid No. 167 -01; Weimer Room Men's Restroom Remodel Project. (A2100.0; Agr -6391) ACTION: 1) Appropriated $33,000 from the Capital Projects (500) unreserved fund balance to expenditure account number 500.5028.56032.20305; and 2) Awarded the contract to Astra Builders, Inc. of Anaheim, California in the amount of $26,780 and authorized the Mayor to execute and the City Clerk to attest the contract on behalf of the City. 3.15 Award of Contract — Bid No. 167 -02; Fiscal Year 2015 -16 (FY16) Community Development Block Grant (CDBG) Alley and Street Improvements Project: Highland Street Neighborhood. (A2100.0; Agr -6392) ACTION: 1) Awarded the contract in the amount of $403,909.30 to All American Asphalt, and authorized the Mayor and City Clerk to execute the necessary documents on behalf of the City. PAGE 5