Loading...
SR - AGR-6388 - PREPARATION OF SPECS AND BID DOCUMENTS FOR SCADA UPGRADE PROJECT1. SUBJECT Agreement with Pacific Advanced Civil Engineering, Inc. for the preparation of specifications and bid documents for the Water Supervisory Control and Data Acquisition ( SCADA) Upgrade Project. 2. SUMMARY Authorize the consultant to provide designs, prepare plans, specifications, cost estimates, and bid documents to complete the SCADA Upgrade Project. 3. RECOMMENDED ACTION Award Consultant Service Agreement to Pacific Advanced Civil Engineering, Inc. in the amount of $43,000 and authorize the Mayor and City Clerk to execute the necessary documents on behalf of the City. 4. FISCAL IMPACT Funds are available to cover the cost of the agreement as follows: 600.8011.56510.18912 Water Plant Telemetry SCADA $ 350,000 5. STRATEGIC PLAN GOAL(S) Provide for a safe community: b. Provide and maintain infrastructure necessary to ensure the safety of the public. 2. Be a fiscally healthy community: d. Effectively manage and develop City assets. 4. Provide outstanding public service: b. Provide facilities and services to meet customer expectations. 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 6.0: Ensure water, sewer, and storm drain systems meet the needs of residents and businesses. Policy 1.1: Provide sufficient levels of water, sewer, and storm drain services throughout the community. Economic Development Element Goal 6.0: Provide sufficient infrastructure to support anticipated economic development and growth. Policy 6.1: Provide public improvements to support commercial, industrial, and institutional uses. 7. DISCUSSION and BACKGROUND The existing SCADA system for the City of Orange Water Division has been in operation for approximately 19 years. This system is used to monitor and control the water system remotely from the Water Division Headquarters or from a remote laptop or tablet. The existing SCADA system is obsolete, inefficient, and has limited capability. It does not provide the desired automation and synchronization of the water system to provide a more efficient operation by today's critical standards. Currently, the water system includes 14 wells, 15 reservoirs, 15 pump stations, and 8 import connections, all of which are controlled by the SCADA system. In July of 2014, the City of Orange awarded a contract to Pacific Advanced Civil Engineering Inc. to assess, evaluate, and recommend improvements (including varying degrees of automation) to the City's existing SCADA system. This step had been completed and the report was used as the basis for the City's Request for Proposals for the second step of the process. The next step in the project is to develop the plans, specifications, and cost estimate for the purchase and installation of the remote telemetry unit. To accomplish that task, the Water Division solicited proposals from qualified firms familiar with this type of work. Proposals were solicited from seven qualified engineering firms that specialize in SCADA systems hardware and software. Two consultants responded with a written proposal. The proposals were carefully reviewed and evaluated independently by a panel based on team qualifications, professional experience, detail of proposal, and project schedule. Three raters collectively recommended Pacific Advanced Civil Engineering, Inc. as the top ranked consultant. After reviewing the proposal, staff was able to successfully negotiate with Pacific Advanced Civil Engineering, Inc. to lower its total fee. Pacific Advanced Civil Engineering, Inc. is an experienced engineering firm that has successfully worked with the City on the SCADA project in the past. Therefore, staff recommends award of the contract to Pacific Advanced Civil Engineering, Inc. in the amount of $43,000. ITEM 2 9/13/16 8. ATTACHMENTS • Consultant Services Agreement • Exhibit A — Scope of Work CITY COUNCIL MINUTES SEPTEMBER 13, 2016 3. CONSENT CALENDAR All items on the Consent Calendar are considered routine and are enacted by one motion approving the recommended action listed on the Agenda. Any member of the City Council, staff or the public may request an item be removed from the Consent Calendar for discussion or separate action. Unless otherwise specified in the request to remove an item from the Consent Calendar, all items removed shall be considered immediately following action on the remaining items on the Consent Calendar. 3.1 Confirmation of warrant registers dated July 28, August 4, 5, 11, 18, 22, 25, 31, and September 1, 2016. (C2500.J.1.7) ACTION: Approved. 3.2 City Council Minutes, Regular Meeting of August 9, 2016; and Special Meeting of August 23, 2016. (C2500.D.4) ACTION: Approved. 3.3 Waive reading in full of all ordinances on the Agenda. ACTION: Approved. 3.4 Investment Oversight Committee Report for the period ending August 31, 2016. (OR1800.0.27.16) ACTION: Received and filed. AGREEMENTS 3.5 First Amendment to Agreement 6260 (AGR -6260) with BC Traffic Specialist for installation of traffic striping, pavement markings, and raised pavement markers at various locations within the City of Orange. (A2100.0; Agr- 6260.1) ACTION: Approved First Amendment to the agreement with BC Traffic Specialist in an amount not -to- exceed $137,114 for installation of traffic striping, pavement markings and raised pavement markers at various locations within the City of Orange. 3.6 Agreement with Pacific Advanced Civil Engineering, Inc. for the preparation of specifications and bid documents for the Water Supervisory Control and Data Acquisition (SCADA) Upgrade Project. (A2100.0; Agr -6388) ACTION: Awarded Consultant Service Agreement to Pacific Advanced Civil Engineering, Inc. in the amount of $43,000 and authorized the Mayor and City Clerk to execute the necessary documents on behalf of the City. PAGE 3