Loading...
SR - AGR-6376 - SHAFFER STREET SEWER LINE REPLACEMENTAward of Contract; Bid No. 156 -46, Sewer Line Replacement, Shaffer Street -300 Feet North of Chapman Avenue to Walnut Avenue, Parker Street - Chapman Avenue to Almond Avenue, Palmyra Avenue, Olive Street to Orange Street, (S -238). 2. SUMMARY Bids for Sewer Line Replacement, Shaffer Street -300 Feet North of Chapman Avenue to Walnut Avenue, Parker Street - Chapman Avenue to Almond Avenue, Palmyra Avenue, Olive Street to Orange Street (S -238) were received and opened on July 28, 2016. Seven bidders responded to the Notice Inviting Bids. The apparent low bidder is Vailston Company Inc. of San Marcos, California. 3. RECOMMENDED ACTION 1. Appropriate $20,000 from Sanitation (220) unreserved fund balance to expenditure account 220.5011.56200.15508 (Sewer Line Replacement). 2. Accept the lowest bid, and award the contract to Vailston Company Inc. of San Marcos, California in the amount of $1,034,103 and authorize the Mayor to execute and the City Clerk to attest the contract on behalf of the City. 4. FISCAL IMPACT Upon appropriation, funds are budgeted in the Capital Improvement Program and are available in the following accounts: 220.5011.56200.15508 (Sewer Line Replacement) $ 779,985 520.5011.56200.15508 (Sewer Line Replacement) $ 5,402 272.5011.56330.13120 (Pavement Management Program) $ 280,000 $ 1,065,387 ITEMS . 1 S 1 08/09/16 5. STRATEGIC PLAN GOAL(S) lb. Provide for a safe community - Provide and maintain infrastructure necessary to ensure the safety of the public. 4b. Provide outstanding public service - Provide facilities and services to meet customer expectations. 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 1.0: Ensure water, sewer, and storm drain systems that meet the needs of residents and businesses. Policy 1.1: Provide sufficient levels of water, sewer, and storm drain service throughout the community. 7. DISCUSSION and BACKGROUND The City Council previously approved advertisement for bids at its June 9, 2016 meeting. The bid solicitation was advertised on July 7, 2016 for a period of three weeks and bids were opened on July 28, 2016. Seven bidders submitted proposals as follows: The Sewer Maintenance crew provides information from their field observations of the sewer system to Engineering Design on a continuous basis. As result of this feedback, the sewer segment on Shaffer Street -300 feet north of Chapman Avenue to Walnut Avenue needs to be replaced. This location has been requiring a higher than normal level of maintenance service for several reasons, but generally it is due to offset joints, tree roots, broken sections, and/or being undersized. The sewer segments on Parker Street and Palmyra Avenue are located in areas where pavement rehabilitation was scheduled to take place in the summer of 2016. Pavement rehabilitation will now take place after the sewer lines are replaced. A video survey of the sewer pipe was requested. In reviewing the footage it was determined that these areas are warranted for sewer replacement due to large offsets and broken pipe sections. The project addresses the maintenance issues by replacing existing 6" lines with approximately 2,943 linear feet of 8" and 371 liner feet of 6" clay lines and reconnecting the service laterals. As part of this project, (Shaffer and Palmyra and Shaffer and Maple), two concrete street intersections will also be reconstructed due to poor pavement conditions. The concrete pavement ITEM 2 08/09/16 TOTAL BID 1) Vailston Company, Inc., San Marcos ............ $1,034,103 2) Lonerock, Irvine ............. ............................... $1,137,296 3) Paulus Engineering, Inc., Anaheim ............... $1,151,800 4) Mike Prlich and Sons, Inc., Baldwin Park..... $1,167,684 5) Kordich Construction Inc., Cypress ............... $1,225,172 6) Ramona, Inc., Arcadia .... ............................... $1,265,785 7) GCI Construction, Inc., San Clemente .......... $1,430,598 The Sewer Maintenance crew provides information from their field observations of the sewer system to Engineering Design on a continuous basis. As result of this feedback, the sewer segment on Shaffer Street -300 feet north of Chapman Avenue to Walnut Avenue needs to be replaced. This location has been requiring a higher than normal level of maintenance service for several reasons, but generally it is due to offset joints, tree roots, broken sections, and/or being undersized. The sewer segments on Parker Street and Palmyra Avenue are located in areas where pavement rehabilitation was scheduled to take place in the summer of 2016. Pavement rehabilitation will now take place after the sewer lines are replaced. A video survey of the sewer pipe was requested. In reviewing the footage it was determined that these areas are warranted for sewer replacement due to large offsets and broken pipe sections. The project addresses the maintenance issues by replacing existing 6" lines with approximately 2,943 linear feet of 8" and 371 liner feet of 6" clay lines and reconnecting the service laterals. As part of this project, (Shaffer and Palmyra and Shaffer and Maple), two concrete street intersections will also be reconstructed due to poor pavement conditions. The concrete pavement ITEM 2 08/09/16 reconstruction will be completed after the sewer replacement work and will be funded with Gas Tax funds. The proposed sewer replacement is categorically exempt from the provisions of the California Environmental Quality Act (CEQA) under CEQA guidelines Section 15301" Existing Facilities" Class 1 (b). The Notice of Exemption has been filed with the County Recorder's Office. Construction is scheduled to begin in September 2016 and is expected to be completed within 90 calendar days. 8. ATTACHMENTS • Bid Abstract CITY COUNCIL MINUTES AUGUST 9, 2016 3. CONSENT CALENDAR (Continued) 3.14 CLAIMS (C3200.0) The following claim(s) have been received and investigated by the City Attorney's Office and /or the Risk Manager. After a thorough investigation with the involved departments, it is the recommendation of the City Attorney's Office that the claim(s) be denied. a. Jacqueline P. Gutierrez b. Gregory Dougherty c. Maxwell Lawrence d. John Wolfe e. Maria Silvia Rodriguez Flores ACTION: Denied Claim(s) for damages and referred to City Attorney and Adjuster. CONTRACTS 3.15 Award of Contract — Bid No. 156 -46; Sewer Line Replacement on Shaffer Street - 300 feet North of Chapman Avenue to Walnut Avenue, Parker Street — Chapman Avenue to Almond Avenue, Palmyra Avenue, Olive Street to Orange Street. (A2100.0; AGR- 6376) ACTION: 1) Appropriated $20,000 from Sanitation (220) unreserved fund balance to expenditure account 220.5011.56200.15508 (Sewer Line Replacement); and 2) Accepted the lowest bid, awarded the contract to Vailston Company, Inc. of San Marcos, CA, in the amount of $1,034,103, and authorized the Mayor to execute and the City Clerk to attest the contract on behalf of the City. 3.16 Award of Contract — Bid No. 156 -45; Reservoir 2 Paving Project. (A2100.0; AGR- 6379) ACTION: Awarded contract in the amount of $105,361 to Hardy & Harper, Inc.; and authorized the Mayor and the City Clerk to execute the necessary documents on behalf of the City. 3.17 Award of Contract — Bid No. 156 -47; Collins Avenue Storm Drain Improvements Project. (A2100.0; AGR -6377) ACTION: 1) Relieved the bid received from the first apparent low bidder, Ramona, Inc. of Arcadia, CA, on the basis of their request for relief due to a mathematical error; 2) Transferred $22,000 from 220.5021.56015.14997 (Municipal Parking Lot Maintenance) to 220.5022.56330.30078 (Sanitation & Sewer - Installation of Bio Clean Unit on Collins); and 3) Awarded the contract in the amount of $196,630 to Grbcon, Inc. of Arcadia, CA, and authorized the Mayor and City Clerk to execute on behalf of the City. PAGE 5