SR - AGR-6374 - UCI MEDICAL CENTER MASTER METER PROGRAM - UCIMC1. SUBJECT Agreement with Stantec Consultant Services Inc. for professional services for the UCI Medical Center (UCIMC) Master Meter Program in an amount not to exceed $94,660. 2. SUMMARY — 7 Authorize the consultant to conduct a field survey, prepare plans, specifications, and cost estimates, prepare required CEQA documents and legal easements, and provide needed construction support to construct and complete the UCIMC Master Meter Program. 3. RECOMMENDED ACTION Award Consultant Service Agreement to Stantec Consultant Services Inc. of Irvine, CA, in an amount not to exceed $94,660 and authorize the Mayor and City Clerk to execute the necessary documents on behalf of the City 4. FISCAL IMPACT 7771 Funds are available to cover the cost of the agreement as follows: 550.8041.56510.18104 UCI- Master Meter Program $ 2,000,000 5. STRATEGIC PLAN GOAL(S) Provide for a safe community: b. Provide and maintain infrastructure necessary to ensure the safety of the public. 2. Be a fiscally healthy community: d. Effectively manage and develop City assets. 4. Provide outstanding public service: b. Provide facilities and services to meet customer expectations. 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 6.0: Ensure water, sewer, and storm drain systems meet the needs of residents and businesses. Policy 1.1: Provide sufficient levels of water, sewer, and storm drain services throughout the community. Economic Development Element Goal 6.0: Provide sufficient infrastructure to support anticipated economic development and growth. Policy 6.1: Provide public improvements to support commercial, industrial, and institutional uses. 7. DISCUSSION and BACKGROUND On February 10, 2016, the City of Orange entered into an agreement with the Regents of the University of California Irvine Medical Center (UCIMC) to complete the final water master metering of the UCIMC main campus (Agreement No. 6301). As part of that agreement, UCIMC agreed to provide $2,000,000 to cover the cost of the required metering and associated water improvements in exchange for the City designing and constructing the improvements along with the relinquishing of an unused on -site water tank to UCIMC. The initial step to begin the project is to hire a qualified consultant to develop the plans, specifications and cost estimate for the project. To accomplish that task, the Water Division solicited proposals from qualified firms familiar with this type of work. The work required consists of conducting a topographic survey of the site, preparing construction plans and specifications, developing easement documents, conducting structural calculations, developing required CEQA documents, and providing cost estimates for the project. Proposals were solicited from six qualified engineering firms that specialize in providing the desired design and engineering services. Upon review of the project and specific requirements, three firms declined to submit a proposal due to concerns with specific environmental document challenges and/or concerns with some of the specialized structural requirements needed for the project. Two other firms were unable to submit a proposal due to scheduling conflicts. Stantec Consultant Services Inc. was the only firm that submitted a proposal. The proposal was carefully reviewed and evaluated independently by the review panel based on team qualifications, professional experience, detail of proposal, and project schedule. After reviewing the proposal, staff felt comfortable and confident with Stantec Consultant Services Inc. proposal and staff was able to successfully negotiate with Stantec to lower its total fee. Stantec is an experienced engineering firm that has successfully worked with the City on projects in the past, the most recent project being the design and construction of the Marywood Pump Station project. ITEM 2 8/09/16 Staff is recommending award of the contract to Stantec Consultant Services Inc. in the amount of $94,660. 8. ATTACHMENTS 77�:] • Consultant Services Agreement • Rater Summary Sheet ITEM 3 8/09/16 CITY COUNCIL MINUTES AUGUST 9, 2016 3. CONSENT CALENDAR (Continued) 3.4 Treasurer's Reports for the months of April, May, and June 2016. (C2500.F) ACTION: Received and filed. AGREEMENTS 3.5 Agreement with California Waters Development, Inc. (California Waters) for ongoing maintenance of City Fountains for a four -year Aggregate amount not to exceed $70,317. (A2100.0; AGR -6373) ACTION: Approved agreement with California Waters Development Inc., and authorized the Mayor and City Clerk to execute on behalf of the City. (ITEM REMOVED AND HEARD SEPARATELY) 3.6 Appropriation of $123,584 from General Fund Unreserved Fund Balance and Award of four -year Agreement for Landscape Maintenance of City Parks and Recreation Trails, Proposal No. 156 -37, to Merchants Landscape, Inc. in the aggregate not -to- exceed amount of $2,993,600. A2100.0; AGR -6375) City Manager Rick Otto clarified that this was a four -year agreement for landscape services for 20 of the City's improved parks including Santiago Creek Trail. MOTION — Smith SECOND — Murphy AYES — Alvarez, Whitaker, Smith, Murphy, Nichols Moved to: 1) Authorize the appropriation of $123,584 from General Fund 100 unreserved fund balance to expenditure account 100.7022.51420.00000 (Maintenance Contracts); and 2) Approve agreement with Merchants Landscape Inc. and authorize the Mayor and City Clerk to execute on behalf of the City. 3.7 Agreement with Stantec Consulting Service, Inc. for professional services for the UCI Medical Center (UCIMC) Master Meter Program in an amount not -to- exceed $94,660. (A2100.0; AGR -6374) ACTION: Awarded Consultant Services Agreement to Stantec Consulting Service, Inc. of Irvine, CA, in an amount not to exceed $94,660; and authorized the Mayor and City Clerk to execute the necessary documents on behalf of the City. 3.8 A Consultant Services Agreement with CSG Consultants, Inc., a Private Consultant Firm, to Provide Plan Review and Field Inspection Services for the Building Division of the Community Development Department. (A2100.0; AGR- 3375.L) ACTION: Approved and authorized the Mayor and City Clerk to execute a consultant services agreement with CSG Consultants, Inc., with the total compensation not to exceed $80,000. PAGE 3