Loading...
SR - AGR-6359 - CRITICAL INTERSECTION IMPROVEMENTS LINCOLN AVENUE TUSTIN STREETAGENDA ITEM June 14, 2016 TO: Honorable Mayor and Members of the City Council THRU: Rick Otto, City Manager FRO Joe DeFrancesco, Public Works Di t� Reviewed/Verifie City Manager Finance Dire To Be Presented By: Joe DeFrancesco X Cons Calendar _ City Mgr Rpts Council Reports _ Legal Affairs Boards /Cmtes _ Public Hrgs Admin Reports Plan/Environ 1. SUBJECT Award of Contract - Bid No. 156 -43; Lincoln Avenue and Tustin Street Critical Intersection Improvements Project (SP- 3864). 2. SUMMARY Bids for the Lincoln Avenue and Tustin Street Critical Intersection Improvements Project were received and opened on June 2, 2016. Five bidders responded to the Notice Inviting Bids. The apparent low bidder is All American Asphalt of Corona, CA in the amount of $515,515. The total estimated construction cost for the Lincoln Avenue and Tustin Street Critical Intersection Improvements Project including 15% for contingencies and construction engineering is $592,842. 3. RECOMMENDED ACTION Award the contract in the amount of $515,515 to All American Asphalt of Corona, CA and authorize the Mayor and City Clerk to execute on behalf of the City. 4. FISCAL IMPACT Funds are budgeted in the Capital Improvement Program and are available in the following accounts: 550.5011.56330.30012 (CTFP — ICE Tustin & Lincoln Intersection Widening) $602,368 284.5011.56330.30012 (TSIP Area `B" Tustin & Lincoln Intersection Widening) $202,500 600.8041.56451.18400 (Pipeline Renewal Projects) $120,000 $904,868 ITEM A 1 06/14/16 O Printed on Recycled Paper 5. STRATEGIC PLAN GOAL(S) lb. Provide for a safe community - Provide and maintain infrastructure necessary to ensure the safety of the public. 4b. Provide outstanding public service - Provide facilities and services to meet customer expectations. 6. GENERAL PLAN IMPLEMENTATION Circulation & Mobility Element Goal 1.0 Provide safe, efficient, and comprehensive circulation system that serves local needs, meet forecasted demands, and sustain quality of life in neighborhoods. Policy 1.2: Identify key intersections and streets with historical or projected traffic congestion problems and apply creative traffic management measures to improve overall circulation. 7. DISCUSSION and BACKGROUND The Lincoln Avenue and Tustin Street intersection is a critical intersection as identified in the City of Orange General Plan adopted by the City Council on March 9, 2010. The City of Orange applied for and received funds through the Combined Transportation Funding Program for Intersection Capacity Enhancement (CTFP -ICE) as administered by the Orange County Transportation Authority (OCTA). The City has been approved for $541,140 from the program for engineering, acquisition of right -of -way, and construction funds for the improvement of the Lincoln Avenue and Tustin Street intersection. The City Council previously approved advertisement for bids for the construction of this project on May 10, 2016. The project was advertised on May 11, 2016 for three weeks, and bids were opened on June 2, 2016. Eight bid proposals were sold, and five bidders responded as follows: 1. All American Asphalt, Corona, CA .............. .......................$515,000 2. Palp, Inc., Long Beach, CA ............................ ........................628,280 3. R.J. Noble Company, Orange, CA ................. ........................690,880 4. Hillcrest Contracting, Inc. Corona, CA .......... ........................733,000 5. Beador Construction Company, CA .............. ........................765,300 All American Asphalt is the apparent responsive low bidder. This contractor has performed many projects for the City of Orange. Staff recommends that All American Asphalt be awarded the contract in the amount of $515,515 for the Lincoln Avenue and Tustin Street Critical Intersection Improvements Project. The project will construct an additional eastbound Lincoln Avenue to northbound Tustin Street dedicated left turn lane and a raised stamped concrete median on Lincoln Avenue, restripe northbound Tustin Street to add an additional northbound -to- westbound Lincoln Avenue dedicated left turn lane on Tustin Street, and pavement rehabilitation. This project will also remove and reconstruct a sidewalk access ramp at the southwest corner of Tustin Street and ITEM 2 06/14/16 Lincoln Avenue, replace traffic signal poles, adjust utility covers to grade, new pavement striping and traffic control. The existing water mains in the intersection of Tustin Street and Lincoln Avenue are scheduled to be replaced as part of the larger Annual Pipeline Renewal Project in early 2017. For cost saving and public convenience, the water mains within this intersection will be replaced ahead of schedule as part of the Tustin/Lincoln Improvement Project. The scope of work, in general, consists of utility potholing and installation of approximately 435 linear feet of 12" ductile iron pipe, including all necessary valves and fittings. To reduce construction impacts, most of the construction activities will be performed at night between the hours of 9:00pm- 5:00am. Daytime working hours will be between 8:30am- 3:30pm with one lane open in each direction, and two lanes will be maintained in each direction during peak commute times. The total estimated construction cost including 15% for contingencies and construction engineering is $592,842. The construction is scheduled to begin in July 2016 and is expected to be completed within one hundred twenty calendar days. 8. ATTACHMENTS • Location Map • Bid Abstract • Plans, specifications, and cost estimates are available for review in the Public Works Department JD;m;ly N:\Public Works\ADMIN\LYoung \Council Items \COUNCILVune - 2016 \SP -3864 Lincoln- Tustin Improvements_AWARD.doc ITEM 3 06/14/16