Loading...
SR - - ADVERTISE BIDS CONSTRUCTION SEWER LINE REPLACEMENT SHAFFER STREET CHAPMAN WALNUT°c� AGEN ITEM oc��.onux ciy a June 14, 2016 TO: Honorable Mayor and Members of the City Council THRU: Rick Otto, City Manager FROM: Joe DeFrancesco, Public Works Di ector Reviewed/Verified B City Manager Finance Director %" l/ To Be Presented By: Joe DeFrancesco X Cons Calendar _ City Mgr Rpts Council Reports _ Legal Affairs Boards /Cmtes _ Public Hrgs Admin Reports Plan/Environ 1. SUBJECT Bid No. 156 -46; Approval of plans and specifications, and request authorization to advertise for bids for construction of Sewer Line Replacement on Shaffer Street from 330 feet north of Chapman Avenue to Walnut Avenue (S -238). 2. SUMMARY Plans and specifications have been completed for the Sewer Line Replacement on Shaffer Street from 330 feet north of Chapman Avenue to Walnut Avenue. The project is ready to be advertised for bids. The total estimated construction cost including 10% for contingencies and construction engineering is $550,000. 13. RECOMMENDED ACTION Approve plans and specifications and authorize advertising for bids for Sewer Line Replacement on Shaffer Street from 330 feet north of Chapman Avenue to Walnut Avenue (S -238). 4. FISCAL IMPACT Funds are budgeted in the Capital Improvement Program and are available in the following accounts: 220.5011.56200.15508 (Sewer Line Replacement) 520.5011.56200.15508 (Sewer Line Replacement) $ 595,307 $ 2,402 $ 597,709 5. STRATEGIC PLAN GOAL(S) lb. Provide for a safe community - Provide and maintain infrastructure necessary to ensure the safety of the public. ITEM ' U 1 06/14/16 Q Printed on Recycled Paper 4b. Provide outstanding public service - Provide facilities and services to meet customer expectations. 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 1.0: Ensure water, sewer, and storm drain systems that meet the needs of residents and businesses. Policy 1.1: Provide sufficient levels of water, sewer, and storm drain service throughout the community. 7. DISCUSSION and BACKGROUND The Sewer Maintenance crew provides information from their field observations of the sewer hotspots as listed in the Sewer Master Plan to Engineering Design on a continuous basis. These locations have been requiring a higher than normal level of maintenance for several reasons but generally due to offset joints, tree roots, broken sections, and/or being undersized. Public Works has prepared plans and specifications to fix these problems by replacing approximately 2,300 linear feet of existing 6" lines with 8" clay lines and reconnecting the service laterals. During the working hours from 7:00 a.m. to 4:00 p.m., one -way traffic will be maintained on southbound Shaffer Street and detour routes will be provided. If necessary, a full roadway closure may be required due to the public safety and field conditions. The total estimated construction cost including 10% for contingencies and construction engineering is $550,000. At the time bids are received and actual bid prices are known, staff will determine if funds are adequate for awarding of contract. If necessary, staff may recommend to delay the project until sufficient funds are available. Construction is scheduled to begin in the Summer 2016 and is expected to be completed within ninety calendar days. The proposed sewer replacement is categorically exempt from the provisions of the California Environmental Quality Act (CEQA) under CEQA guidelines Section 15301 "Existing Facilities" Class 1 (b). The Notice of Exemption will be filed with the County Recorder's Office upon Council's approval of the plans and specifications. 8. ATTACHMENTS • Location Map • Plans, specifications, and cost estimates are available for review in the Public Works Department JD; el;ly N:Tubhc WorksWDMIN\LYoung \Council It ems \COUNCILUune - 2016\ S- 238_Sewer_Line_Replacement —at_ Shaffer_St.doc ITEM 2 06/14/16 O Printed on Recycled Paper