SR - - ADVERTISE BIDS FOR RESRVOIR 2 PAVING PROJECT*`� Of 0 c* AGENDA ITEM a June 14, 2016 c�UN1'Y CPY TO: Honorable Mayor and Members of the City Council THRU: Rick Otto City Manager FROM: Joe DeFrancesco Public Works Di ector Reviewed /Verified B - City Manager Finance Director To Be Presented * DeFrancesco X Cons Calendar City Mgr Rpts Council Rpts Legal Affairs Boards /Crates Public Hrgs Admin Rpts Plan/Environ 1. SUBJECT Bid No. 156 -45 - Approval of plans and specifications for the Reservoir 2 Paving Project and authorization to advertise for bids. 2. SUMMARY Plans and specifications have been completed for the Reservoirs 2 Paving Project. This project is ready to be advertised for bids. The preliminary cost estimate is $95,000.00. 3. RECOMMENDED ACTION Approve plans and specifications and authorize advertising for Bid No. 156 -45 Reservoir 2 Paving Project. 4. FISCAL IMPACT Upon approval of the Fiscal Year 2016 -2017 budget, funds will be available as follows: 600.8041.53830.00000 Asphalt Products $ 532,000.00 5. STRATEGIC PLAN GOAL(S) 1. Provide for a safe community: b. Provide and maintain infrastructure necessary to ensure the safety of the public. 2. Be a fiscally healthy community: d. Effectively manage and develop City assets. 4. Provide outstanding public service: b. Provide facilities and services to meet customer expectations. ITEM /-'� 06/14/16 1 Printed on Recycled Paper 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 6.0: Ensure water, sewer, and storm drain systems that meet the needs of residents and businesses. Policy 1.1: Provide sufficient levels of water, sewer, and storm drain service throughout the community. Economic Development Element Goal 6.0: Provide sufficient infrastructure to support anticipated economic development and growth. Policy 6.1: Provide public improvements to support commercial, industrial and institutional uses. 7. DISCUSSION and BACKGROUND Reservoir 2 is near the intersection of Santiago Blvd. and Villa Real Dr. The existing 2" asphalt surface around the reservoir was constructed in 1958 and has been deteriorating over the years. Visible cracks and settlement are observed throughout the site. To better protect the reservoir site and provide a drivable surface for maintenance vehicles, the Water Division is proposing to replace the existing asphalt surface with a thicker paving section. In addition, the site will be re- graded to improve the drainage pattern. The scope of work for this project includes the installation of 3" Asphalt Concrete over 4" Aggregate Base, 8" AC curb around the site perimeter, and adjustment of utility valves to grade. The engineering estimate for construction costs for this project is $95,000.00. Construction is anticipated to begin in September 2016 and to be completed at the end of October 2016. This project is categorically exempt from the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Section 15301 (Minor Alterations to Existing Facilities) because it consists of pavement maintenance at an existing City facility involving no expansion of the existing use. 8. ATTACHMENTS • Plans and specifications are available for review in the Public Works Department. ITEM 06/14/16 2