SR - AGR-6232 - CHANGE ORDER NO 1 WELL NO 27 EQUIPPING PLANP° AGENDA ITEM May 10, 2016 c�UNTY CP TO: Honorable Mayor and Members of the City Council THRU: Rick Otto City Manager FROM: Joe DeFrancesco Public Works Di ector Reviewed/Verified City Manager Finance Directo To Be Presented By: Joe DeFrancesco X Cons Calendar City Mgr Rpts Council Rpts Legal Affairs Boards /Cmtes Public Hrgs Admin Rp Plan/Environ i. SUBJECT Contract Change Order No. 1 - Bid No. 145-39; Well No. 27 Equipping Plan (W -659). 2. SUMMARY The Contract Change Order authorizes payment for unforeseen extra work at an agreed lump sum of $48,079.86. 3. RECOMMENDED ACTION 1. Authorize the appropriation of $25,000.00 from the water fund unreserved fund balance to Account No. 600.8011.56411.18119, Well 27 Construction 2. Approve Contract Change Order No. 1 in the amount of $48,079.86 to Cora Constructors, Inc. for additional work. 4. FISCAL IMPACT Upon appropriation, funds will be available to cover the cost as follows: 600.8011.56411.18119 Well 27 Construction $50,602.68 5. STRATEGIC PLAN GOAL(S) 1. Provide for a safe community: b. Provide and maintain infrastructure necessary to ensure the safety of the public. ITEM 2%&0 5/10/16 2. Be a fiscally healthy community: d. Effectively manage and develop City assets. 4. Provide outstanding public service: b. Provide facilities and services to meet customer expectations. 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 6.0: Ensure water, sewer, and storm drain systems that meet the needs of residents and businesses. Policy 1.1: Provide sufficient levels of water, sewer, and storm drain service throughout the community. Economic Development Element Goal 6.0: Provide sufficient infrastructure to support antici- pated economic development and growth. Policy 6.1: Provide public improvements to support commercial, industrial and institutional uses. 7. DISCUSSION and BACKGROUND The contract for the final above ground construction of Well 27 was awarded to Cora Constructors, Inc. on June 9, 2015. Construction has been underway since September 2015 and is scheduled to be completed by June 2016. During the construction, some unanticipated situations arose that required minor modifications to the plans and extra work in order to continue the project. Among the changes were the modification of a swing gate at the SCE transformer enclosure per their request, installation of a Motor Protection Relay that will report back a potential over - heating of the well motor in the event of a malfunction, removal of existing interfering buried concrete in the new pipe trench, and excavation around unmarked utilities. The original contract amount is $2,244,587. Contract Change Order No. 1 in the amount of $48,079.86 represents a 2.1% increase from the original amount, bringing the total contract amount to $2,292,666.86. 8. ATTACHMENTS Contract Change Order No. 1 ITEM 5/10/16 2