Loading...
SR - AGR-6332 - 2015-16 ADA WHEELCHAIR ACCESS RAMPS VARIOUS LOCATIONS� OP ORa �U AGENDA ITEM April 12,2016 TO: Honorable Mayor and Members of the City Council THRU: Rick Otto City Manager FROM: Joe DeFrancesco Public Works Di for William R. Crouch W� Community Development Director Admin Reports Plan/Environ 1. SUBJECT 7 — Award of Contract — Bid No. 156 -28; SP -3943; Community Development Block Grant (CDBG) Americans with Disabilities Act (ADA) Wheelchair Access Ramps at Various Locations Project, Fiscal Year 2015 -2016 (FY16). 1 2. SUMMARY Seven (7) bids for CDBG ADA Wheelchair Access Ramps at Various Locations, FY16 were received and opened on March 17, 2016. The apparent responsive low bidder is EBS General Engineering, Inc. in the amount of $213,900. 3. RECOMMENDED ACTION 1. Reject the bid received from the first apparent low bidder, C.J. Concrete Construction, Inc., a California Corporation, on the basis that the bid was not responsive. 2. Reject the bid received from the second apparent low bidder, S &H Civilworks, a California Corporation, on the basis that the bid was not responsive. 3. Award the contract in the amount of $213,900 to EBS General Engineering, Inc. and authorize the Mayor and City Clerk to execute the necessary documents on behalf of the City. 4. FISCAL IMPACT Funds are budgeted and available in the Capital Improvement Program in the following account: 310.9645.56330.11328 CDBG — ADA Improvements $ 250,000 5. STRATEGIC PLAN GOAL(S) lb. Provide for a safe community - Provide and maintain infrastructure necessary to ensure the safety of the public. ITEM 3,J ;k 1 04/12/16 Reviewed/Verifie City Manager Finance Direc or To Be Presented By: Joe DeFrancesco X Cons Calendar City Mgr Rpts Council Reports Legal Affairs Boards /Cmtes _ Public Hrgs Printed on Recycled Paper 4b. Provide outstanding public service - Provide facilities and services to meet customer expectations. 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 3.0 Ensure adequate maintenance of public right -of -way to enhance public safety and improve circulation. Policy 3.1: Continue to maintain and repair sidewalks and pavement surfaces on public right -of- way. 7. DISCUSSION and BACKGROUND The City Council previously approved advertisement for bids at its February 9, 2016 meeting. The bid solicitation was advertised on February 17, 2016 for a period of two (2) weeks, and bids were opened on March 17, 2016. Seven (7) bidders submitted proposals as follows: 1) CJ Concrete Construction, Inc. $192,700 2) S &H Civilworks $212,400 3) EBS General Engineering, Inc. $213,900 4) Horizons Construction Co., Int'l. $259,250 5) Dilian Construction, Inc. $294,200 6) S. Parker Engineering $294,500 7) Nobest Inc. $307,000 Upon review of bids received, staff determined that CJ Concrete Construction, Inc. was not responsive and did not conform in all material respects to the specifications contained in the City's invitation to bid. Section "2 -1.3 Procedure for Proposal Submittal" of the City of Orange Special Provisions required bidders to meet the DBE goal of 6 %, or show Good Faith Efforts. CJ Concrete Construction, Inc. did not meet the required DBE commitment nor did they show Good Faith Efforts as outlined in the specifications and do not qualify as a responsive bidder. S &H Civilworks was the apparent second lowest bidder. Upon review of their bid, staff has determined that it was not responsive to and did not conform in all material respects to the specifications contained in the City's invitation to bid. Section "2 -1.2 Qualifications of Bidders" of the City of Orange Special Provisions required bidders to have a minimum of five (5) years' experience in completing contracts of a similar nature. The Contractors' State License Board shows that S &H Civilworks has held a Class A license for less than 5 years at the time of bid submittal, meaning that S &H Civilworks did not meet the minimum work experience required to qualify as a responsive bidder. EBS General Engineering, Inc. is the apparent responsive low bidder. This contractor has performed several project for the City of Orange. All projects were completed within project specifications and on schedule. Therefore, staff recommends that EBS General Engineering, Inc. be awarded the contract in the amount of $213,900 for the CDBG ADA Wheelchair Access Ramps at Various Locations Project (FYI 6). This project will provide for construction of approximately fifty ADA wheelchair access ramps at the locations depicted on the attached location map. As part of this project, detectable warning ITEM 2 04/12/16 Printed on Recycled Paper surfaces (truncated domes) will be installed per the American with Disabilities Act Accessibility Guidelines (ADAAG) requirements. The City receives CDBG funding from the U.S. Department of Housing and Urban Development for activities that primarily benefit Low and Moderate Income residents. Construction of ADA compliant access ramps qualifies for CDBG funding because the ramps benefit disabled residents that are considered to be Low Income. The estimated total cost for this project is $250,000 including 15% contingency and construction engineering. Construction is scheduled to begin in early May 2016, and is expected to be completed within two months. 8. ATTACHMENTS • Bid Abstract • Location Map JD: mal:ly N:\Public Works \ADM1TALYoung \Counci1 Items \COUNCIL \Aprl2 \4- 12- 16\ADA Ramp 15 -16 - Auth to Advertise- DRAFr.docx ITEM 3 04/12/16 O Printed on Recycled Paper 0 5 AG,R -,,33 Recorded in Official Records, Orange County RECORDING REQUESTED BY AND Hugh Nguyen, Clerk- Recorder WHEN 0 ECORDED MAIL TO: 11 $ I 1 III Ilil 111 III 111111 III I111 III IIIiI 1 11 NO FEE City o Orange 0 8 5 6 1 3 5 3$* 300 East Chapman Avenue 2016000346729 1:51 pm 07/28/16 Orange, California 92866 93 415 N12 A04 1 Attention: City Clerk 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 [Space above this line for Recorder's use only.] THIS DOCUMENT IS RECORDED AT THE REQUEST AND FOR THE BENEFIT OF THE CITY OF ORANGE AND IS EXEMPT FROM THE PAYMENT OF A RECORDING FEE PURSUANT TO GOVERNMENT CODE SECTIONS 6103 AND 27383. 1 0 NOTICE OF COMPLETION AND ACCEPTANCE 4' NOTICE IS HEREBY GIVEN that work on that certain public work and improvements known as "CDBG ADA Wheelchair Access Ramps at Various Locations FY 2015 -2016 (Bid No. 156 -28, SP- 3943)" (herein referred to as the "Project "), for the owner, the City of Orange, a municipal corporation (herein referred to as the "City "), whose address is 300 E. Chapman Avenue, Orange, CA 92866, was completed and accepted by the City Council of the City of Orange on July 12, 2016 at a regular meeting of its members, at which a quorum was present and acting throughout. The Project is at various locations in the City of Orange, State of California. The contractor who performed (or caused to be performed) said public work and improvements was EBS General Engineering, Inc., a California corporation, with its principal office at 1320 E. Sixth Street Suite 100 in the City of Corona, State of California 92879. The name of the surety on the Labor and Material Bond for the Project is Suretec Insurance Company State of Texas (Bond No. 4405770) in the amount of $213,900.00. DATED as of the 12th day of July 2016. CITY OF ORANGE, a municipal corporation By: Wit ( 1 O eresa E. Smith Mayor of the City of Orange STATE OF CALIFORNIA COUNTY OF ORANGE I, Teresa E. Smith, Mayor of the City of Orange, state that I have read the foregoing document, know the contents thereof, and that the facts therein stated are true of my own knowledge. I hereby declare under penalty of perjury that the foregoing is true and correct. DATED as of the 12th day of July 2016 at Orange, California. C:::%) .1‘/--e4-st— Xr Teresa E. Smith, Mayor of the City of Orange I, Mary E. Murphy, City Clerk for the City of Orange, hereby attest that Teresa E. Smith is known to me to be the Mayor of the City of Orange and known to me to be the person who executed the within instrument on behalf of said municipal corporation, and acknowledged to me that the City of Orange executed the same. (I k Mary E. My Clerk of the City of r