Loading...
SR - - ADVERTISE BIDS LEFT TURN SIGNAL MODIFICATION TUSTIN STREET VANOWEN AVENUE*� AGENDA ITEM March 8, 2016 TO: Honorable Mayor and Members of the City Council THRU: Rick Otto City Manager FROM: Joe DeFrancesco Public Works Di ector Reviewed/Verified B City Manager Finance Director To Be Presented By: Joe DeFrancesco X Cons Calendar City Mgr Rpts Council Reports Legal Affairs Boards /Crates Public Hrgs Admin Reports Plan /Environ 1. SUBJECT Bid No. 156 -33; Approval of plans and specifications, and request authorization to advertise for bids the Tustin Street and Vanowen Avenue Left Turn Signal Modification Project (SP- 3927). 2. SUMMARY The plans and specifications for the Tustin Street at Vanowen Avenue Left Turn Signal Modification project have been completed. The project is ready to be advertised for bids. The total estimated construction cost including contingencies (10 %) and construction engineering (5 %) is $300,000. 3. RECOMMENDED ACTION Approve plans and specifications, and authorize advertising for bids the Tustin Street at Vanowen Avenue Left Turn Signal Modification Project. 4. FISCAL IMPACT Funds are budgeted and available in the following account: 283.5032.56100.201244 Tustin/Vanowen Traffic Signal Modification $308,000.00 5. STRATEGIC PLAN GOAL(S) 1 b) Provide for a safe community — Provide and maintain infrastructure necessary to ensure the safety of the public. 3d) Enhance and promote quality of life in the community- Maintain and improve multi -modal transportation throughout the City. ITEM ._�"�= 1 3/08/2016 Printed on Recycled Paper 6. GENERAL PLAN IMPLEMENTATION Circulation & Mobility Goal 1.0 Provide a safe, efficient, and comprehensive circulation system that serves local needs, meets forecasted demands, and sustains quality of life in neighborhoods. Policy 1.2: Identify key intersections and streets with historical or projected traffic congestion problems and apply creative traffic management measures to improve overall circulation. Policy 1.6: Maintain and repair roadways and sidewalks as necessary to improve circulation and safety. 7. DISCUSSION and BACKGROUND The traffic signal at the intersection of Tustin Street and Vanowen Avenue is outdated and requires much needed upgrades to achieve improved operation, enhanced pedestrian safety, and maintain the capacity of the roadway. Tustin Street is classified as a major arterial with three travel lanes in each direction and carries 40,000 average daily traffic. In November 2015, the City retained the services of KOA Corporation to prepare the plans, specifications, and estimates (PS &E) for the proposed improvements. The PS &E is now complete and the project is ready to be advertised. The total estimated construction cost including contingencies (10 %), and construction engineering (5 %) is $300,000. The project is categorically exempt from the provisions of the 2016 CEQA Guidelines under Article 19. "Categorical Exemptions ", Section 15301 "Existing Facilities ", classifies this project as Class 1 (c) "Existing highways and streets, sidewalks, gutters, bicycle and pedestrian trails, and similar facilities ". This categorical exemption applies to projects that involve minor alteration to an existing facility. The Notice of Exemption will be filed with the County of Orange upon approval of the PS &E. The scope of traffic signal work includes removal and replacement of controller and cabinet, signal poles and foundations, service, vehicular and pedestrian indications, detectors, pull- boxes, pedestrian push buttons, LED safety lighting fixtures, and street name signs; installation of emergency vehicle preemption, and CCTV camera; restoration of existing improvements. Civil works include removal and replacement of ADA compliant sidewalk access ramps, cross - gutter and spandrel, curb and gutter, and failed pavement sections. Construction is scheduled to start in July 2016 and is expected to be completed in approximately three months. 8. ATTACHMENTS • Location Map • Plans and specifications are available for review at the City Traffic Engineer's Office JD /js:ml:pt � Advertise Tustin Vanowen Left Turn Signalization Bid 156.33 N: /PublicWorks /Admin /Thenp /Traffic Council Items /2016 Reports /March 2 �� Printed on Recycled Paper