Loading...
SR - - ADVERTISE BIDS 2015-16 ANNUAL PAVEMENT MAINTENANCE VARIOUS LOCATIONSAGENDA ITEM February 9, 2016 �OCO, 6,1�,.•.� TO: Honorable Mayor and Members of the City Council THRU: Rick Otto, City Manager oil-- FROM: Joe DeFrancesco t Public Works D' ector Reviewed/Verifie City Manager Finance Dire for To Be Presented By: Joe DeFrancesco X Cons Calendar City Mgr Rpts Council Reports _ _ Legal Affairs Boards /Cmtes Public Hrgs Admin Reports Plan/Environ 1. SUBJECT Bid No. 156 -30; SP -3946; Annual Pavement Maintenance at Various Locations, Fiscal Year 2015- 2016. Approval of plans and specifications and authorization to advertise for bids. 2. SUMMARY Plans and specifications have been completed for the Annual Pavement Maintenance Project at Various Locations, FY 2015 -2016. The project is ready to be advertised for bids. The estimated construction cost is $2,750,000 including 10% construction engineering and contingency. 3. RECOMMENDED ACTION Approve plans and specifications and authorize advertising for bids for the Annual Pavement Maintenance Project at Various Locations, FY 2015 -2016. 4. FISCAL IMPACT Funds are budgeted in the Capital Improvement Program and are available in the following accounts: 263.5011.56330.13120 (Local Street Maintenance) 272.5011.56330.13120 (Local Street Maintenance) $2,000,000 $1,598,303 TOTAL $3,598,303 5. STRATEGIC PLAN GOAL(S) lb. Provide for a safe community - Provide and maintain infrastructure necessary to ensure the safety of the public. 4b. Provide outstanding public service - Provide facilities and services to meet customer expectations. ITEM 3. g 1 02/09/2016 O Pfinted on Recycled Paper 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 3.0 Ensure adequate maintenance of public rights -of -way to enhance public safety and improve circulation. Policy 3.1: Continue to maintain and repair sidewalks and pavement surfaces on public rights -of- way. 17. DISCUSSION and BACKGROUND I This project is part of our FY 2015 -2016 Annual Street Maintenance activities, and is designed to prolong pavement life of city streets. Rehabilitation methods vary depending on the sustained damage but in general consist of asphalt concrete overlays with localized areas of pavement reconstruction and slurry seal. The rehabilitated pavement will have a longer service life and will provide a safe and smooth ride for the traveling public. This asphalt concrete overlay and slurry seal project will rehabilitate approximately 35 residential streets and 4 arterial streets throughout the City. The streets selected for maintenance in accordance with our Pavement Management Plan, generally fall into the "poor to fair" category and require work at this time to prevent total pavement failure and more costly reconstruction in the future. The total cost is estimated at $2,750,000 including 10% construction engineering and contingency. If the unit price for slurry and asphalt come in below the estimate, additional streets may be added for rehabilitation. The proposed 4 arterial streets are as follow: 1. Main Street from Fwy. 22 to La Veta Ave. and from Chapman Ave. to Collins Ave. 2. Batavia Street from Railroad tracks to Fletcher Ave. 3. Fletcher Avenue from Glassell St. to East End 4. Cannon Street from Chapman Ave. to Creekside Ave. The proposed project is categorically exempt from the provisions of the California Environmental Quality Act (CEQA) under CEQA guidelines Section 15301 "Existing Facilities" Class 1 (c). The CEQA Notice of Exemption will be filed with the County Recorder's Office upon Council's approval of the plans and specifications. Construction is estimated to begin in May 2016 and to be completed by October 2016. 18. ATTACHMENTS • Location List • Plans, specifications, and cost estimates are available for review in the Public Works Department JD;m;ly N: \Public Works\ADMIN\LYoung \Council Items\ COUNCIL \Feb - 2016 \2- 9- 16\Authorization to Advertise Annual Pavement 15- 16.docx ITEM 2 02/09/2016 Printed on Recycled Paper