SR - - ADVERTISE BIDS 2015-16 ADA WHEELCHAIR ACCESS RAMPS VARIOUS LOCATIONSGam: • "���'co
W11
THRU:
FROM:
AGENDA ITEM
February 9, 2016
Honorable Mayor and
Members of the City Council
Rick Otto
City Manager
Joe DeFrancesco
Public Works �ectdr. _
William R. Crouch
Community Develo
Director
Reviewed/Verified
City Manager
Finance Dire c ��
To Be Presented By:
Joe DeFrancesco
X Cons Calendar
City Mgr Rpts
Council Reports
Legal Affairs
Boards /Cmtes
Public Hrgs
Admin Reports
Plan/Environ
1. SUBJECT
Bid No. 156 -28; SP -3943; Community Development Block Grant (CDBG) Americans with
Disabilities Act (ADA) Wheelchair Access Ramps at Various Locations Project (FY 16). Approval
of plans and specifications, authorization to advertise bids for construction.
2. SUMMARY
Plans and specifications have been completed for the CDBG- funded (FY16) ADA Wheelchair
Access Ramps at Various Locations Project and the Project is ready to be advertised for bids. The
total estimated construction cost including contingencies and construction engineering (15 %) is
$250,000.
3. RECOMMENDED ACTION
Approve plans and specifications and authorize advertising for bids for the (FY16) CDBG ADA
Wheelchair Access Ramps at Various Locations.
4. FISCAL IMPACT
Funds are budgeted and available in the Capital Improvement Program in the following account:
310.9645.56330.11328 CDBG — ADA Improvements $ 250,000.00
5. STRATEGIC PLAN GOAL(S)
lb. Provide for a safe community - Provide and maintain infrastructure necessary to ensure the
safety of the public.
4b. Provide outstanding public service - Provide facilities and services to meet customer
expectations.
ITEM 3:1 1 02/09/15
Q Printed on Recycled Paper
6. GENERAL PLAN IMPLEMENTATION
Infrastructure Element Goal 3.0 Ensure adequate maintenance of public right -of -way to enhance
public safety and improve circulation.
Policy 3.1: Continue to maintain and repair sidewalks and pavement surfaces on public right -of-
way.
7. DISCUSSION and BACKGROUND
This project will provide for construction of approximately fifty (50) ADA wheelchair access
ramps at various locations, City wide. As part of this project, detectable warning surfaces
(truncated domes) will be installed per the American with Disabilities Act Accessibility Guidelines
(ADAAG) requirements.
The City receives CDBG funding from the U.S. Department of Housing and Urban Development
for activities that primarily benefit Low and Moderate Income residents. Construction of ADA
compliant access ramps City -wide qualifies for CDBG funding because the ramps benefit disabled
residents that are considered to be Low Income.
The proposed project is categorically exempt from the provisions of the California Environmental
Quality Act (CEQA) under CEQA guidelines Section 15301 "Existing Facilities" Class 1 (c). The
Notice of Exemption has been filed with the County Recorder's Office. The proposed project is
also categorically excluded from the provisions of the National Environmental Policy Act (NEPA)
under CFR 24 Section 58.35. Documentation of this determination is on file.
The estimated total cost for this project is $250,000 including 15% contingency and construction
engineering.
Construction is scheduled to begin in March 2015, and is expected to be completed within one
month.
8. ATTACHMENTS
• Location Map
Plans, specifications, and cost estimate are available for review in the Public Works
Department.