Loading...
SR - - ADVERTISE BIDS 2015-16 ADA WHEELCHAIR ACCESS RAMPS VARIOUS LOCATIONSGam: • "���'co W11 THRU: FROM: AGENDA ITEM February 9, 2016 Honorable Mayor and Members of the City Council Rick Otto City Manager Joe DeFrancesco Public Works �ectdr. _ William R. Crouch Community Develo Director Reviewed/Verified City Manager Finance Dire c �� To Be Presented By: Joe DeFrancesco X Cons Calendar City Mgr Rpts Council Reports Legal Affairs Boards /Cmtes Public Hrgs Admin Reports Plan/Environ 1. SUBJECT Bid No. 156 -28; SP -3943; Community Development Block Grant (CDBG) Americans with Disabilities Act (ADA) Wheelchair Access Ramps at Various Locations Project (FY 16). Approval of plans and specifications, authorization to advertise bids for construction. 2. SUMMARY Plans and specifications have been completed for the CDBG- funded (FY16) ADA Wheelchair Access Ramps at Various Locations Project and the Project is ready to be advertised for bids. The total estimated construction cost including contingencies and construction engineering (15 %) is $250,000. 3. RECOMMENDED ACTION Approve plans and specifications and authorize advertising for bids for the (FY16) CDBG ADA Wheelchair Access Ramps at Various Locations. 4. FISCAL IMPACT Funds are budgeted and available in the Capital Improvement Program in the following account: 310.9645.56330.11328 CDBG — ADA Improvements $ 250,000.00 5. STRATEGIC PLAN GOAL(S) lb. Provide for a safe community - Provide and maintain infrastructure necessary to ensure the safety of the public. 4b. Provide outstanding public service - Provide facilities and services to meet customer expectations. ITEM 3:1 1 02/09/15 Q Printed on Recycled Paper 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 3.0 Ensure adequate maintenance of public right -of -way to enhance public safety and improve circulation. Policy 3.1: Continue to maintain and repair sidewalks and pavement surfaces on public right -of- way. 7. DISCUSSION and BACKGROUND This project will provide for construction of approximately fifty (50) ADA wheelchair access ramps at various locations, City wide. As part of this project, detectable warning surfaces (truncated domes) will be installed per the American with Disabilities Act Accessibility Guidelines (ADAAG) requirements. The City receives CDBG funding from the U.S. Department of Housing and Urban Development for activities that primarily benefit Low and Moderate Income residents. Construction of ADA compliant access ramps City -wide qualifies for CDBG funding because the ramps benefit disabled residents that are considered to be Low Income. The proposed project is categorically exempt from the provisions of the California Environmental Quality Act (CEQA) under CEQA guidelines Section 15301 "Existing Facilities" Class 1 (c). The Notice of Exemption has been filed with the County Recorder's Office. The proposed project is also categorically excluded from the provisions of the National Environmental Policy Act (NEPA) under CFR 24 Section 58.35. Documentation of this determination is on file. The estimated total cost for this project is $250,000 including 15% contingency and construction engineering. Construction is scheduled to begin in March 2015, and is expected to be completed within one month. 8. ATTACHMENTS • Location Map Plans, specifications, and cost estimate are available for review in the Public Works Department. JD:ml:ly N:\Public Works \ADMIN\LYoung \Council Items \COUNCILUan - 2016 \1 -12 -16 \ADA Ramp 15 -16 - Auth to Advertise- DRAFr.docx ITEM 2 02/09/15 O Printed on Recycled Paper