Loading...
SR - AGR-6253 - FEDERAL HIGHWAY SAFETY IMPROVEMENT PROGRAM LEFT TURN PHASING SIGNAL MODIFICATION PROJECTSAGENDA ITEM August 11, 2015 TO: Honorable Mayor and Members of the City Council THRU: Rick Otto Interim City Manager FROM: Joe DeFrancesco A� :( Public Works Dir r ReviewedNerified B : City Manager Finance Director To Be Presented By: Joe DeFrancesco X Cons Calendar City Mgr Rpts Council Reports Legal Affairs Boards /Crates Public Hrgs Admin Reports Plan/Environ i. susJEcr Award of Contract for Bid No. 145 -04; three (3) Federal Highway Safety Improvement Program (HSIP) Left Turn Phasing Signal Modification Projects: 1) Chapman Avenue at Hewes Street; 2) Chapman Avenue at Esplanade Street; and 3) Tustin Street at Mayfair Avenue. 2. SUMMARY The bids for the three (3) HSIP projects 1) Chapman Avenue at Hewes Street; 2) Chapman Avenue at Esplanade Street; and 3) Tustin Street at Mayfair Avenue were received and opened on July 1, 2015. The apparent low bidder is JFL Electric, Inc. (JFL) of Los Angeles, CA in the amount of $631,514. The total estimated construction cost including 15% for contingencies and construction engineering is $726,241. 13. RECOMMENDED ACTION 1) Authorize the appropriation from the 500 unreserved Capital Projects fund balances to the following expenditure accounts: 500 .5032.556100.20190 ............. Capital Projects Chapman and Hewes ................. $ 10,000 500 .5032.556100.20192 ............. Capital Projects Chapman and Esplanade ..............43,000 2) Authorize the appropriation from the 284 unreserved TSIP B fund balances to the following expenditure account: 284 .5032.556100.20193 ............. TSIP B Tustin and Mayfair ........... .........................77,800 3) Award the contract in the amount of $631,514.00 to JFL Electric, Inc., and authorize the Mayor and the City Clerk to execute on behalf of the City 4. FISCAL IMPACT Upon appropriation, funds will be available for the construction costs as follows: ITEM 1 6 8/11/2015 1 0 Printed on Recycled Paper 500.5032 .56100.20190 .................. Capital Projects Chapman and Hewes..................... $ 10,000 550.5032 .56100.20190 .................. HSIP5 Chapman and Hewes ............... ........................199,100 263.5032 .56100.20190 .................. Measure M2 Chapman and Hewes ................................ 22,100 500.5032 .56100.20192 .................. Capital Projects Chapman and Esplanade .....................43,000 550.5032 .56100.20192 .................. HSIP5 Chapman and Esplanade .................................. 166,100 263.5032 .56100.20192 .................. Measure M2 Chapman and Esplanade . .........................18,500 284.5032 .56100.20193 .................. TSIP B Tustin and Mayfair .................. ......................... 77,800 550.5032 .56100.20193 .................. HSIP5 Tustin and Mayfair ........................................... 190,200 .................................................................... ............................... ..........................Total $726,800 5. STRATEGIC PLAN GOAL(S) lb. Provide for a safe community — Provide and maintain infrastructure necessary to ensure the safety of the public. 3d. Enhance and promote quality of life in the community- Maintain and improve multi -modal transportation throughout the City. 6. GENERAL PLAN IMPLEMENTATION Growth Management Goal 1.0 Reduce traffic congestion within the City. Policy 3.0: Ensure adequate maintenance of public rights -of -way to enhance public safety and improve circulation. Policy 3.3: Continue to design, install, and maintain signals, signage, streetlights, and traffic control devices within rights -of -way 7. DISCUSSION and BACKGROUND The City Council approved authorization to advertise the projects for construction bids on April 14, 2015. The solicitation for bids was first advertised on June 10, 2015 for a period of three (3) weeks. Seven bids were received and opened on July 1, 2015 as follows: 1) JFL Electric, Inc., Los Angeles ........... ..............................$ 631,514 2) Elecnor Belco Electric, Inc., Chino ............... ........................645,100 3) California Professional Engr., La Puente ...... ........................645,632 4) Comet Electric Inc., Chatsworth ................... ........................657,184 5) DBX Inc., Temecula ....... ............................... ........................665,055 6) Asplundh Construction Corp., Anaheim ....... ........................856,960 7) Select Electric, Inc., Poway ........................... ........................886,283 JFL's proposal complies in all material respects to the bid solicitation and is a responsible bidder. JFL would be a first time contractor for the City of Orange. Reference checks with the cities of Irvine, Huntington Beach, Pomona, and Caltrans turned out positive reviews of JFL's performance on its respective traffic signal or street lighting projects. The total estimated construction cost for the three projects including contract, and 15% for contingencies and construction engineering is $726,241 while available construction funds are 2 $617,500. Staff is recommending additional appropriation of $109,000 from the Capital Projects (500), and TSIP B (284) unreserved fund balances to complete the construction of the projects. The project is federally funded under the Highway Safety Improvement Program. HSIP provides a maximum of 90% reimbursement for eligible project costs; while the local agency contributes the remaining 10% and any additional costs. The three projects were combined into one bid to take advantage of the economies of scale, and ease of construction coordination with one contractor. The traffic signal modification at the three intersections will provide protected left -turn phasing (green arrow) for the northbound and southbound directions. When completed, the addition of left -turn phasing is expected to reduce accidents and improve the operational efficiency. The scope of work, in general, includes removal of existing and replacement with new signal poles, mast arms, luminaries (safety lighting), signal head indications, electrical service, street name signs, and concrete foundation; relocation of signal controller cabinet, and battery back -up system; installation of preemption units, new conduits and conductors; and construction of ADA compliant sidewalk access ramps. The project is categorically exempt from the provisions of the 2014 CEQA Guidelines under Article 19. "Categorical Exemptions ", Section 15301 "Existing Facilities ". The Notice of Exemption for each project has been filed with County Recorder's Office. Actual construction is expected to start early fall of 2015 upon delivery of long lead materials and equipment. Construction of the three projects is scheduled to be completed next summer. 8. ATTACHMENTS • Location Maps JD /js:ml:pt 2!� 3HSIP5 Award Report [N: /PublicWorks /Admin/Traffic /Traffic Council Items /2015 Reports /August] 3 CITY COUNCIL MINUTES 3. CONSENT CALENDAR (Continued) AUGUST 11, 2015 3.18 Award of Contract — Bid No. 145 -04; three (3) Federal Highway Safety Improvement Program (HSIP) Left Turn Phasing Signal Modification Projects: 1) Chapman Avenue at Hewes Street; 2) Chapman Avenue at Esplanade Street; and 3) Tustin Street at Mayfair Avenue. (A2100.0 Agr -6253) ACTION: 1) Authorized the appropriation from the 500 unreserved Capital Projects fund balances to the following expenditure accounts: a) 500.5032.556100.20190 Capital Projects Chapman and Hewes $10,000; b) 500.5032.556100.20192 Capital Projects Chapman and Esplanade $43,000; 2) Authorized the appropriation from the 284 unreserved TSIP B fund balances to the following expenditure account: 284.5032.556100.20193 TSIP B Tustin and Mayfair $77,800; and 3) Awarded the contract in the amount of $631,514.00 to JFL Electric, Inc., and authorized the Mayor and the City Clerk to execute on behalf of the City. 3.19 Final Acceptance of Bid No. 145 -20; Shaffer Street Storm Drain Improvement Project performed by David Wasden, Inc.; and authorization to file the Notice of Completion with the County Recorder. (No staff report required (A2100.0 Agr -6167) ACTION: Accepted public work improvements, authorized release of Allegheny Casualty Company of Pennsylvania, Bond No. 0671024 in the amount of $82,000.00 to the contractor on said job, and authorized the Mayor and City Clerk to execute the Notice of Completion. 3.20 Final Acceptance of Bid No. 145 -12; Reservoir No. 5 Rehabilitation performed by Advanced Industrial Services and authorization to file the Notice of Completion with the County Recorder. (No staff report required.) (A2100.0 Agr -6158) ACTION: Accepted the completion of installation, authorized release of The Ohio Casualty Insurance Company, Bond No. 024058962 in the amount of $756,900.00 to the contractor on said job, and authorized the Mayor and City Clerk to execute the Notice of Completion. 3.21 Final Acceptance of Bid No. 145 -27; OC &PT Wrought Iron Fence Installation Project performed by Wolverine Fence Company, Inc.; and authorization to file the Notice of Completion with the County Recorder. (No staff report required (A2100.0 Agr -6199) ACTION: Accepted public work improvements, authorized release of Developers Surety and Indemnity Company of Iowa, Bond No. 802621 P in the amount of $59,995.00 to the contractor on said job, and authorized the Mayor and City Clerk to execute the Notice of Completion. PAGE 6