Loading...
SR - AGR-6223 - FIRE STATION KITCHEN IMPROVEMENTSAGENDA ITEM 9�.. May 12, 2015 ° A'• fan � � �bUN c TO: Honorable Mayor and Members of the City Council THRU: Rick Otto Interim City Manager FROM: Joe DeFrances co 4e�, / Public Works rector Patrick Dibb, Fire Chiee ReviewedNerifie City Manager Finance Dire- r To Be Presented By: Joe DeFrancesco X Cons Calendar City Mgr Rpts Council Reports _ Legal Affairs Boards /Crates Public Hrgs Admin Reports _ Plan/Environ 1. SUBJECT Award of contract for Bid No. 145 -42, SP -3910; Fire Station Kitchen Improvements. 2. SUMMARY The bids for the Fire Station Kitchen Improvements were received and opened on April 9, 2015. Nine (9) bidders responded to the Notice Inviting Bids. The apparent low bidder is Frank Shariat General Engineering, of Laguna Niguel, CA for $95,220.00. The Engineer's construction estimate was $124,680.00. 3. RECOMMENDED ACTION Award the contract in the amount of $95,220.00 to Frank Shariat General Engineering, and authorize the Mayor and City Clerk to execute the necessary documents on behalf of the City. 4. FISCAL IMPACT Funds are budgeted in the Capital Improvement Program and are available in the following account: 560.3021.56015.30069 (Fire Station Kitchen Improvements) $ 149,989 5. STRATEGIC PLAN GOAL(S) lb. Provide for a safe community - Provide and maintain infrastructure necessary to ensure the safety of the public. 4b. Provide outstanding public service - Provide facilities and services to meet customer expectations. ITEM 3- 1D 1 5/12/15 O Printed on Recycled Paper 6. GENERAL PLAN IMPLEMENTATION Economic Development Element Goal 6.0 Provide sufficient infrastructure to support anticipated economic development and growth. Policy 6.2: Provide public improvements to support commercial, industrial and institutional uses. 7. DISCUSSION and BACKGROUND This project consists of kitchen improvements at three fire stations. Fire stations 1, 5, and 6 have housed multiple fire companies for decades. The kitchen facilities at these stations are aging and worn. In some cases, there is water damage under the sinks. The objective of this project is to maintain and improve the City's infrastructure by replacing the kitchen cabinets and flooring at fire stations 1, 5, and 6 in FY 2014 -15. The project scope consists of replacing base and overhead cabinets, removing countertops and fitting them with stainless steel tops, replacing or refinishing cabinet doors, installing vinyl sheet flooring and 18" x 18" tiles, replacing faucets and garbage disposals, installing lighting, painting and other minor items. The bid solicitation was advertised on March 19, 2015 for a period of three weeks, and bids were opened on April 9, 2015. Nine bids were received as follows: 1) Frank Shariat General Engineering, Laguna Niguel ......... $ 95,220.00 2) Line Tech Contractors, Los Alamitos ............................... $ 97,400.00 3) Damon Inc., Downey ........................ ............................... $ 106,454.00 4) ENL Service, Inc., South Gate ......... ............................... $ 112,700.00 5) Pacific Builder, Laguna Niguel ........ ............................... $ 122,225.00 6) Menard, Inc., Corona ........................ ............................... $ 124,393.00 7) Jasper Construction, Lomita ............. ............................... $ 128,000.00 8) A2Z Construction, Inc., Rancho Santa Margarita........... $ 136,175.00 9) R Dependable Construction, Inc., San Bernardino ......... $ 147,500.45 Construction is scheduled to begin in June 2015 and is expected to be completed within ninety calendar days. S. ATTACHMENTS • Bid Abstract JD;pt;ly N: \Public Works\ADMIN\ADMIN \LYoung\LYoung \Council Items \C0LJNCIL\May - 2015 \SP -3910 Award Fire Station Kitchen lmprovements.doc ITEM 2 5/12/15 O Printed on Recycled Paper