SR - - FY 2015-16 SEWER LINE REPLACEMENT VARIOUS LOCATIONSAGENDA ITEM May 12, 2015 ° Ornvi^t C TO: Honorable Mayor and Members of the City Council THRU: Rick Otto, Interim City Manag ]�' FROM: Joe DeFrancesco, Public Works Dit�ec tor Pub c Wo ReviewedNeritied By: Interim City Manager , Finance Director To Be Presented By: Joe DeFrancesco X Cons Calendar _ City Mgr Rpts Council Reports _ Legal Affairs Boards /Cmtes _ Public Hrgs Admin Reports Plan /Environ 1. SUBJECT Bid No. 145 -53; Approval of plans and specifications, and request authorization to advertise for bids for construction of Sewer Line Replacement at Various Locations Project, FY 2014 -15 (S- 237). 2. SUMMARY Plans and specifications have been completed for the Sewer Line Replacement at Various Locations Project, FY 2014 -15. The project is ready to be advertised for bids. The total estimated construction cost including 10% for contingencies and construction engineering is $1,100,000. 3. RECOMMENDED ACTION 1) Approve plans and specifications and authorize advertising for bids for Sewer Line Replacement at Various Locations Project, FY 2014 -15 (S -237). 2) Appropriate $500,000 from the Sanitation (220) unreserved fund balance to CIP Project 220.5011.56200.15508 (Sewer Line Replacement) 4. FISCAL IMPACT Funds are budgeted in the Capital Improvement Program and are available in the following accounts after appropriation: 220.5011.56200.15508 (Sewer Line Replacement) $ 1,118,685 520.5011.56200.15508 (Sewer Line Replacement) $ 8,527 $ 1,127,212 ITEM -a 1 05/12/15 O Printed on Recycled Paper 5. STRATEGIC PLAN GOAL(S) 1 b. Provide for a safe community - Provide and maintain infrastructure necessary to ensure the safety of the public. 4b. Provide outstanding public service - Provide facilities and services to meet customer expectations. 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 1.0: Ensure water, sewer, and storm drain systems that meet the needs of residents and businesses. Policy 1.1: Provide sufficient levels of water, sewer, and storm drain service throughout the community. 7. DISCUSSION and BACKGROUND The Sewer Maintenance crew provides information from their field observations of the sewer hotspots as listed in the Sewer Master Plan to Engineering Design on a continuous basis. These locations have been requiring a higher than normal level of maintenance for several reasons but generally due to offset joints, tree roots, broken sections, and /or being undersized. Public Works has prepared plans and specifications to fix these problems by replacing approximately 7,000 linear feet of existing 6" lines with 8" clay lines and reconnecting the service laterals. The substandard mainline on Glassell needs to be replaced ahead of planned street rehabilitation in the next couple of year. The total estimated construction cost including 10% for contingencies and construction engineering is $1,100,000. Construction is scheduled to begin in Summer 2015 and is expected to be completed within ninety calendar days. The proposed sewer replacement is categorically exempt from the provisions of the California Environmental Quality Act (CEQA) under CEQA guidelines Section 15301 "Existing Facilities" Class 1 (b). The Notice of Exemption will be filed with the County Recorder's Office upon Council's approval of the plans and specifications. 8. ATTACHMENTS • Location Map • Plans, specifications, and cost estimates are available for review in the Public Works Department JD;m;ly NAPublic Works\ADMIN \ADMIN\LYormg \LYoung \Council Items \C0UNCIL\May - 2015 \S -237 Sewer Line Replacement at Various Locatons_Adv.doc ITEM 2 05/12/15 O Printed on Recycled Paper