Loading...
SR - - FY 2015-16 ASPHALT REPLACEMENT VARIOUS LOCATIONS°P AGENDA ITEM 9ti.. 4 May 12 2015 O,e •, e��ms Py�C A UNTY C TO: Honorable Mayor and Members of the City Council THRU: Rick Otto Interim City Mana 1 FROM: Joe DeFrancesco , Public Works Di ctor ReviewedNerified B City Manager Finance Director To Be Presented By: Joe DeFrancesco X Cons Calendar City Mgr Rpts Council Rpts Legal Affairs Boards /Crates Public Hrgs Admin Rpts Plan /Environ 1. SUBJECT Bid No. 145 -50; Asphalt Replacement at Various Locations for Fiscal Year 2015 -2016. Approval of specifications and authorization to advertise for bids. 2. SUMMARY Specifications have been completed for the Asphalt Replacement at Various Locations for FY 2015 -2016 Project and is ready to advertise for bids. The initial one year cost estimate is $690,000.00. 3. RECOMMENDED ACTION Approve specifications and authorize advertising for bids for the Asphalt Replacement at Various Locations for Fiscal Year 2015 -2016 Project. 4. FISCAL IMPACT With the adoption of FY 15 -16 budget, funds will be budgeted and available in the following account: 600.8041.53830.00000 Asphalt Products $700,000.00 5. STRATEGIC PLAN GOAL(S) lb) Provide for a safe community — Provide and maintain infrastructure necessary to ensure the safety of the public. 2d) Be a fiscally healthy community - Effectively manage and develop City assets. 4b) Provide outstanding public service - Provide facilities and services to meet customer expectations. 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 6.0: Ensure water, sewer, and storm drain systems that meet the needs of residents and businesses. ITEM 5/12/15 Policy 1.1: Provide sufficient levels of water, sewer, and storm drain service throughout the community. Economic Development Element Goal 6.0: Provide sufficient infrastructure to support anticipated economic development and growth. Policy 6.1: Provide public improvements to support commercial, industrial and institutional uses. 7. DISCUSSION and BACKGROUND Throughout the year, the Water Division conducts routine and emergency repairs of existing infrastructure within the City right -of -way. Often, these repairs result in the removal of asphalt concrete on City streets. Once necessary repairs have been made to the underground water infrastructure, temporary asphalt concrete is placed so that the street can be used without extended delays. The location of the water infrastructure repairs are throughout the City and are the result of unpredictable circumstances such as water line breaks. To obtain a cost savings with economy -of- scale, several asphalt concrete repair areas are packaged together to be completed. The cost to repair individual asphalt concrete patches separately is expensive due to the fact that only a limited amount of asphalt is needed for each location. Over the past several years, approximately 2,000 tons of asphalt concrete has been used in a fiscal year. Work items will include traffic control, removal of temporary asphalt concrete, saw cutting and grinding, paving and overlay, slurry seal, and adjustment of utility valves and covers to grade. The scope of work includes all labor, equipment, and materials necessary to repair the asphalt concrete patches on an "as needed" basis. The initial one year cost estimate is $690,000.00. The term of the contract is for one year with an option to renew the contract annually up to a total of four additional years. If the City is satisfied with the level of service and performance of the contractor, the City can choose to extend the contract with either a 2% increase or an increase equal to the Consumer Price Index (CPI), whichever is less. 8. ATTACHMENTS . None N:\Public Works \ADMIMADMIN\Corina Perez\DPW Council Agendas\2015\May \Staff Report for AC Replacement FYI 5-16 - Permision to advertise.doc ITEM 5/12/15