Loading...
SR - AGR-6159 - 2014-15 ANNUAL CONCRETE REPLACEMENT VARIOUS LOCATIONS PHASE 1, oR, TO: AGENDA ITEM October 14, 2014 Reviewed/Verified By: Honorable Mayor and Members of the City Council City Manager Finance Direct r v THRU• John W. Sibley To Be Presentey: Joe DeFrancesco • City Manager X Cons Calendar — City Mgr Rpts FROM: DeFrancesco Council Reports — Legal Affairs • Public Works D rector Boards /Crates _ Public Hrgs Admin Reports Plan/Bnviron 1. SUBJECT Award of Contract - Bid No. 145 -17, SP -3888; Annual Concrete Replacement at Various Locations Phase 1, Fiscal Year 2014 -15. 2. SUMMARY This project is part of the annual street maintenance activities for curb and gutter, cross gutter, driveway approach, and sidewalk replacement at various locations City wide. 13. RECOMMENDATION /ACTION I Award a contract in the amount of $195,000 to C.J. Construction, Inc., 10142 Shoemaker Ave., Santa Fe Springs, CA 90670 and authorize the Mayor and the City Clerk to execute on behalf of the City. 4. FISCAL IMPACT Funds are budgeted in the Capital Improvement Program and are available in the following accounts: 263.5011.56330.13120 (Local Street Maintenance) $ 275,000 5. STRATEGIC PLAN GOAL( 1 b. Provide for a safe community - Provide and maintain infrastructure necessary to ensure the safety of the public. 4b. Provide outstanding public service - Provide facilities and services to meet customer expectations. ITEM J' 1 5 " 1 10/14/2014 C oPrinted on Recycled Paper 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 3.0 Ensure adequate maintenance of public rights -of -way to enhance public safety and improve circulation. Policy 3.1: Continue to maintain and repair sidewalks and pavement surfaces on public rights - of -way. 7. DISCUSSION and BACKGROUND This project is part of the annual street maintenance activities for curb and gutter, sidewalk, driveway, and cross gutter replacement at various locations City wide. The City has prepared a list of streets requiring concrete rehabilitation for high maintenance areas for fiscal year 2014 -15. This project is the first of two proposed concrete replacement projects; the second project will bid out later this fiscal year. The City Council previously approved advertisement for bids on September 9, 2014. The project was publicly advertised for two weeks. The bids were opened on September 25, 2014. Fifteen (15) bid proposals were sold and ten (10) bidders responded as follow: 1. C.J. Concrete Construction, Inc $195,000 2. CT &T, Inc. $202,325 3. Golden State Constructors $254,375 4. El Camino Const. Engineering $258,500 5. Abny General Engineering $260,800 6. Unique Performance Const., Inc. $261,750 7. PTM General Engineering, Inc. $272,100 8. Martinez Concrete, Inc. $305,200 9. S. Parker Engineering, Inc. $354,500 10. Kalban, Inc. $500,000 The estimated total quantities of concrete replacement at various locations phase I, FY 2014 -15 is as follows: 1. 1,500 linear feet of curb and gutter 2. 18,000 square feet of sidewalk 3. 2,500 square feet of driveway apron 4. 2,000 square feet cross gutter and spandrel The Engineer's Construction Cost Estimate is $275,000, which includes approximately 10% construction contingency. Upon bid opening, the estimated project cost is $214,500, which includes the apparent low bid of $195,000, approximately 10% contingency. Construction is scheduled to begin in late October 2014 and be completed by January 2015. 8. ATTACHMENTS Bid Abstract JD:at:ly N:\ADMIN\ADMINU.Young \LYoung \Council Items \C0UNCIL \0ct - 2014 \10 -14 \SP 3888 Award Annual Concrete Phase I- 14 -15 -DRAFT .docx ITEM 2 10/14/2014 C oPrinted on Recycled Paper