Loading...
SR - - ADVERTISE BIDS INSTALLATION NETWORK CABLING VARIOUS LOCATIONSG~� • ate°'° � • :�'�+ 7y, a rAYTY TO: THRU: AGENDA ITEM October 14, 2014 Honorable Mayor and Members of the City Council John W. Sibley ReviewedNerified By: City Manager Finance Direct r To Be Presente y: Joe DeFrancesco X Cons Calendar City Mgr Rpts _ Council Reports _ Legal Affairs Boards /Crates Public Hrgs _ Admin Reports Plan/Environ City Manager n � / FROM: Joe DeFrancesco f/ Public Works Di cto Rick Otto ,�-'`' Assistant City ana , Interim Community Development Director 1. SUBJECT Bid No. 145 -21; Approval of specifications, and request authorization to advertise for bids for installation of network cabling for Civic Center Administration, Public Works, Community Services, Corporation Yard Fleet, and other City off - campus buildings Project (SP- 3893). 2. SUMMARY Plans and Specifications have been completed for design, provision, installation, testing, and documentation of pathways for new horizontal structured network cabling for voice and data applications. The network cabling will provide required infrastructure to support voice communications for an anticipated phone system upgrade. Additionally, the new network cabling will replace outdated cabling infrastructure to improve network data communications performance. The project is ready to be advertised for bids. The total estimated cost including 15% for contingencies and construction engineering is $400,000. 3. RECOMMENDED ACTION Approve plans and specifications and authorize advertising for bids for installation of network cabling for Civic Center Administration, Public Works, Community Services, Corporation Yard Fleet, and other City off - campus buildings Project (SP- 3893). 4. FISCAL IMPACT Funds are budgeted and available in the following account: 790.1601.56033.19640 (Info Tech Upgrades) $400,000 ITEM , ,�•f 1 10/14/14 C oPrinted on Recycled Paper 5. STRATEGIC PLAN GOAL(S) 4b. Provide outstanding public service - Provide facilities and services to meet customer expectations. 4c. Enhance technology to improve public accessibility to information and services. 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 4.0 Ensure adequate provision of electricity, natural gas, telephone and data services and cable television. Policy 4.3: Promote the use of new and emerging communication technologies. 7. DISCUSSION and BACKGROUND The City's 2012 -2015 Information Technology Strategic Plan identified a critical initiative to implement a consolidated voice and data solution in order to realize significant cost savings, improve staff communications efficiencies, and reduce maintenance and support of legacy phone systems. The City's current phone system infrastructure consists of 5 distinct phone systems. The largest of the 5 phone systems is a Rolm PBX which has exceeded 20 years of use. The City has a disparity of network cabling infrastructure varying from category 3 to category 6 specifications. The requested network cabling installation will narrow the disparity of the City's overall network cabling infrastructure. Upon completion, the entire network cabling infrastructure will have the capacity to support 1 Gbps (gigabit per second) for every network node. It will enable the City to provide more capacity for applications such as voice, data, and video over the network. The total estimated cost including 15% for contingencies and construction engineering is $400,000. Implementation is anticipated to begin late January with an expected duration of 90 days. 8. ATTACHMENTS • Plans and Specifications are available for review in the Public Works Department JD;mf;ly CADocuments and Settings\lyoung \Local Settings \Temporary Internet Files \Content.0utlook\R17PQ5T7 \Cabling authorization to bid(revised) (2).doc ITEM 2 10/14/14 O If Printed on Recycled Paper