Loading...
SR - - PURCHASE BATTERY BACKUP MATERIALS RESERVOIRS 3 6 8 AND 9of AGENDA ITEM May 13, 2014 LINTY TO: Honorable Mayor and Members of the City Council THRU: John W. Sibley City Manager FROM: Joe DeFrancesco Public Works rector ReviewedNerifi &B : City Manager , Finance Direc To Be Presented By: Jo eFrancesco X Cons Calendar City Mgr Rpts Council Rpts Legal Affairs Boards /Crates Public Hrgs Admin Rpts Plan /Environ 1. SUBJECT Purchase Battery Backup Materials for Reservoirs 3, 6, 8 and 9. F2. SUMMARY The Water Division is purchasing components for battery backup systems that will provide uninterrupted power at Reservoirs 3, 6, 8, and 9. Four quotes for materials were requested from four local vendors with three responding. The lowest responsible responder was One Source Distributors, Buena Park, CA for $16,195.75. As this request for materials will put the total purchase of materials from One Source Distributors over $30,000 for the current fiscal year, staff is requesting Council Approval for this purchase. 3. RECOMMENDED ACTION Approve purchase of battery backup materials. 4. FISCAL IMPACT Funds are budgeted and are available to cover the cost as follows: 600.8041.51401.00000 Repairs to Buildings and Fixed Equipment $ 49,741.61 5. STRATEGIC PLAN GOAL(S) 1 b) Provide for a safe community — Provide and maintain infrastructure necessary to ensure the safety of the public. 2d) Be a fiscally healthy community - Effectively manage and develop City assets. 4b) Provide outstanding public service - Provide facilities and services to meet customer expectations. ITEM 5/13/14 1 04 Printed on Recycled Paper 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 6.0: Ensure water, sewer, and storm drain systems that meet the needs of residents and businesses. Policy 1.1: Provide sufficient levels of water, sewer, and storm drain service throughout the community. Economic Development Element Goal 6.0: Provide sufficient infrastructure to support anticipated economic development and growth. Policy 6.1: Provide public improvements to support commercial, industrial and institutional uses. 7. DISCUSSION and BACKGROUND The Water Division is installing battery backup systems in order to provide uninterrupted power for the electronic controls located at Reservoirs 3, 6, 8 and 9. This will allow continuous monitoring of the water levels at these sites, in the event of a prolonged power failure. In the event of a prolonged power failure, the battery backup system will automatically provide uninterrupted power to the control system located at the site, therebye enabling continual monitoring of the site from the master control computer at the Water Plant Headquarters. The battery backups are designed to provide uninterrupted power for 5 -7 days. Four quotes for just the materials for the battery backups were requested from four local vendors with three responding. One Source Distributiors $16,195.75 Graybar Electric $18,575.74 CED- Orange $21,134.48 Curly Wholesale Electric No Response The lowest responsible responder was One Source Distributors, Buena Park, CA for $16,195.75. As the inclusion of this purchase will put the total amount of material purchased form One Source for the current fiscal year well over the $30,000 purchase limit, staff is requesting Council approval of this proposed purchase. 8. ATTACHMENTS Material Quote Summary ITEM 5/13/14 W