Loading...
SR - AGR-6097 - 2013-14 ADA WHEELCHAIR ACCESS VARIOUS LOCATIONSof o� TO: THRU: FROM: AGENDA ITEM May 13, 2014 Honorable Mayor and Members of the City Council John W. Sibley City Manager // Joe DeFrancesco/0 a Public Works Dh:octor Rick Otto, Reviewed/Verified By: City Manager Finance Direc or To Be Presente Jo eFrancesco X Cons Calendar ! City Mgr Rpts Council Reports Legal Affairs Boards /Cmtes Public Hrgs Admin Reports Plan/Environ Interim CdYnmunity Development Director 1. SUBJECT Award of Contract - Bid No. 134 -21; SP- 3874; FY 2013 -14 Community Development Block Grant (CDBG) Project — Americans with Disabilities Act (ADA) Wheelchair Access Ramps at Various Locations. 2. SUM Bids for ADA Wheelchair Access Ramps at Various Locations, Fiscal Year 2013 -14 were received and opened on March 27, 2014. Two (2) bidders responded to the Notice Inviting Bids. The apparent low bidder is Naka Engineering Contractors of Laguna Hills, CA in the amount of $61,920.00. 3. RECOMMENDED ACTION Award the contract in the amount of $61,920.00 to Naka Engineering Contractors and authorize the Mayor and City Clerk to execute the necessary documents on behalf of the City. 4. FISCAL IMPACT Funds are budgeted and available in the Capital Improvement Program in the following account: CDBG — ADA Improvements 310 - 9645 -56330 -11328 $ 78,322 5. STRATEGIC PLAN GOAL(S) 1 b. Provide for a safe community - Provide and maintain infrastructure necessary to ensure the safety of the public. 4b. Provide outstanding public service - Provide facilities and services to meet customer expectations. ITEM '& l 8 1 05/13/14 C oPrinted on Recycled Paper 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 3.0 Ensure adequate maintenance of public rights -of -way to enhance public safety and improve circulation. Policy 3.1: Continue to maintain and repair sidewalks and pavement surfaces on public rights - of -way. 7. DISCUSSION and BACKGROUND The City Council previously approved advertisement for bids at its March 11, 2014 meeting. The bid solicitation was advertised on March 12, 2014 for a period of two (2) weeks, and bids were opened on March 27, 2014. Two (2) bidders submitted proposals as follows: 1) Naka Engineering Contractors $ 61,920.00 2) PTM General Engineering Services, Inc. $ 71,700.00 This project will provide for construction of approximately twelve (12) ADA wheelchair access ramps at various locations, City -wide. As part of this project, detectable warning surfaces (truncated domes) will be installed per the American with Disabilities Act Accessibility Guidelines (ADAAG) requirements. The City receives CDBG funding from the U.S. Department of Housing and Urban Development for activities that primarily benefit Low and Moderate Income residents. Construction of ADA compliant access ramps City -wide qualifies for CDBG funding because the ramps benefit disabled residents that are considered to be Low Income. The estimated total cost for this project is $71,208 including 15% contingency and construction engineering. Construction is scheduled to begin in mid June 2014, and is expected to be completed within a month. 8. ATTACHMENTS • Bid Abstract • Location List Plans, specifications, and cost estimate are available for review in the Public Works Department JD:at:ly N:\Public Works\ADMIN\ADMIN\LYoung \Council Items \C0UNCIL\May - 2014 \5- 13\ADA Ramp 13 -14 award -FINAL DRAFT.doc ITEM 2 05/13/14 O �s Printed on Recycled Paper