Loading...
SR - AGR-6082 - CHAPMAN AVENUE IMPROVEMENT PROJECTAGENDA ITEM March 11, 2014 T C� TO: Honorable Mayor and Members of the City Council THRU: John W. Sibley, City Manager FROM: Joe DeFrancesco, Public Works D' ector ReviewedNeri ied By: City Manager Finance Direc r To Be Presente : id eFrancesco X Cons Calendar _ City Mgr Rpts Council Reports Legal Affairs Boards /Crates Public Hrgs Admin Reports _ Plan/Environ 1. SUBJECT Award of Contract: Bid No. 134 -11; Chapman Avenue Improvement Project (SP -3796) 2. SUMMARY Bids for Chapman Avenue Improvement Project were received, and opened on February 27, 2014. Nine (9) bidders responded to the Notice Inviting Bids. The apparent low bidder is Bannaoun Engineers Constructors Corporation of Chatsworth, CA in the amount of $340,850. 3. RECOMMENDED ACTION Award the contract in the amount of $340,850 to Bannaoun Engineers Constructors Corporation of Chatsworth, CA and authorize the Mayor and City Clerk to execute on behalf of the City. 4. FISCAL IMPACT Funds are available in the following account: 272.5011.56330.20208 (Chapman Avenue Rehabilitation) $324,750.00 263.5011.56330.20208 (Chapman Avenue Rehabilitation) $275,000.00 $599,750.00 5. STRATEGIC PLAN GOAL(S) lb. Provide for a safe community - Provide and maintain infrastructure necessary to ensure the safety of the public. 4b. Provide outstanding public service - Provide facilities and services to meet customer expectations. ITEM - 1 03/11/14 C oPrinted on Recycled Paper 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 3.0 Ensure adequate maintenance of public rights -of -way to enhance public safety and improve circulation. Policy 3.1: Continue to maintain and repair sidewalks and pavement surfaces on public rights - of -way. 7. DISCUSSION and BACKGROUND The City Council previously approved advertisement for bids in its November 26, 2013 meeting. The bid solicitation was advertised on February 12, 2014 for a period of two (2) weeks, and bids were opened on February 27, 2014. Nine (9) bidders submitted proposals as follows: Based on field observation, Chapman Avenue (from Lemon Street to the Plaza and from the Plaza to Grand Street) is in need of rehabilitation. The pavement condition is in moderate to severely distressed, with large quantities of weathering and raveling. City Maintenance crew has been placing skin patches of asphalt concrete before the International Street Fair for the past few years to eliminate tripping hazards. In addition, staff is proposing to include the segment from railroad track to the Plaza with this project to avoid repeated impacts to the Plaza in the near future. The Engineer's estimate of construction cost is $425,000 which includes 15% for contingencies and construction engineering. The proposed project is categorically exempt from the provisions of the CEQA Guidelines as amended September 7, 2004, under Article 19. "Categorical Exemptions ", Section 15301 "Existing Facilities ", classifies this project as Class 1 (c) "Existing highways and streets, sidewalks, gutters, bicycle and pedestrian trails, and similar facilities ". This categorical exemption applies to projects that involve maintenance and minor alteration to highways, streets, sidewalks & gutters, involving negligible or no expansion of the use. The Notice of Exemption has been filed with the County Recorder's Office. ITEM 2 03/11/14 O Printed on Recycled Paper TOTAL BID 1) Bannaoun Engineers, Chatsworth $ 340,850.00 2) R.J. Noble Company, Orange 342,303.00 3) Horizon Construction Co, Orange 372,510.50 4) Patriot Paving, Inc., Orange 378,790.00 5) Excel Paving Company, Long Beach 380,830.00 6) All American Asphalt, Corona 383,000.00 7) Sequel Contractors, Inc., Santa Fe Springs 412,452.00 8) Hardy and Harper, Inc., Santa Ana 444,000.00 9) Ted Enterprises, Inc., San Clemente 666,741.00 Based on field observation, Chapman Avenue (from Lemon Street to the Plaza and from the Plaza to Grand Street) is in need of rehabilitation. The pavement condition is in moderate to severely distressed, with large quantities of weathering and raveling. City Maintenance crew has been placing skin patches of asphalt concrete before the International Street Fair for the past few years to eliminate tripping hazards. In addition, staff is proposing to include the segment from railroad track to the Plaza with this project to avoid repeated impacts to the Plaza in the near future. The Engineer's estimate of construction cost is $425,000 which includes 15% for contingencies and construction engineering. The proposed project is categorically exempt from the provisions of the CEQA Guidelines as amended September 7, 2004, under Article 19. "Categorical Exemptions ", Section 15301 "Existing Facilities ", classifies this project as Class 1 (c) "Existing highways and streets, sidewalks, gutters, bicycle and pedestrian trails, and similar facilities ". This categorical exemption applies to projects that involve maintenance and minor alteration to highways, streets, sidewalks & gutters, involving negligible or no expansion of the use. The Notice of Exemption has been filed with the County Recorder's Office. ITEM 2 03/11/14 O Printed on Recycled Paper The construction is scheduled to begin in May 2014 and be completed in sixty (60) calendar 18. ATTACHMENTS • Location Map • Bid Abstract JD;rn;ly N:\Public Works\ADMIN\ADMIN \LYoung \Council Items \COUNCIL \March - 2014 \3 -1 1 \SP -3796 Chapman Ave. Street Improvements AWARD.doc ITEM 3 03/11/14 O Printed on Recycled Paper