Loading...
SR - AGR-6074 - 2013-14 SEWER LINE REPLACEMENT VARIOUS LOCATIONSOt °c� AGENDA ITEM February 11, 2014 TO: Honorable Mayor and Members of the City Council THRU: John W. Sibley, City Manager FROM: Joe DeFrancescoAector Public Works D 1. SUBJECT ReviewedNeri ied By: City Manager Finance Direc r To Be Presente DeFrancesco X Cons Calendar _ City Mgr Rpts Council Reports _ Legal Affairs Boards /Cmtes _ Public Hrgs Admin Reports Plan/Environ Award of Contract: Bid No. 134 -10; S -235; Sewer Line Replacement at Various Locations Project, Fiscal Year 2013 -14. 2. SUMMARY Bids for Sewer Line Replacement at Various Locations Project, Fiscal Year 2013 -14 were received and opened on January 23, 2014. Thirteen (13) bidders responded to the Notice Inviting Bids. The apparent low bidder is Ramona, Inc., Arcadia, CA in the amount of $694,025. 3. RECOMMENDED ACTION Award the contract in the amount of $694,025 to Ramona, Inc. of Arcadia, CA and authorize the Mayor and City Clerk to execute on behalf of the City. 4. FISCAL IMPACT Funds are budgeted in the Capital Improvement Program and are available in the following account: 220.5011.56200.15508 Sewer Line Replacement 520.5011.56200.15508 Sewer Line Replacement $ 1,009,869.00 $ 5,527.00 $ 1,015,396.00 5. STRATEGIC PLAN GOAL(S) lb. Provide for a safe community - Provide and maintain infrastructure necessary to ensure the safety of the public. ITEM &-/ 1 02/11/14 O pPrinted on Recycled Paper 4b. Provide outstanding public service - Provide facilities and services to meet customer expectations. 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 1.0: Ensure water, sewer, and storm drain systems that meet the needs of residents and businesses. Policy 1.1: Provide sufficient levels of water, sewer, and storm drain service throughout the community. 7. DISCUSSION and BACKGROUND The City Council previously approved advertisement for bids at the November 26, 2013 Council meeting. The bid solicitation was advertised on January 1, 2014 for a period of three (3) weeks, and bids were opened on January 23, 2014. Thirteen (13) bidders submitted proposals as follows: The Sewer Maintenance crew provides information from their field observations of the sewer system to Engineering Design on a continuous basis. These locations have been requiring a higher than normal level of maintenance service for several reasons but generally it is due to offset joints, tree roots, broken sections, and /or being undersized. The project addresses the maintenance issues by replacing the structurally deficient existing 6" lines with 8" clay lines and reconnecting the service laterals. Approximately 5,000 linear feet of sewer lines are being replaced with this project. The Engineer's estimate of construction cost is $770,500 and our project budget is $1,000,000. The low bid received is below the project's budget, so additional hot spots or critically deficient lines may be added to utilize the favorable bid prices received. ITEM 2 02/11/14 C oPrinted on Recycled Paper TOTAL BID 1) Ramona Inc., Arcadia ..... ............................... $ 694,025.00 2) David T. Wasden, Inc., Riverside ................. 701,800.00 3) Vasilj, Inc., Irwindale ..... ............................... 735,900.00 4) Kordich Construction Company, Cypress ..... 767,950.00 5) SND Construction, Inc., Arcadia .................. 800,830.00 6) Paulus Engineering, Anaheim ....................... 941,925.00 7) Vasily Company, Inc., Shadow Hills ............. 969,500.00 8) Excel Paving Company, Long Beach ............ 979,958.00 9) MNR Construction, Inc., Baldwin Park ........ 1,164,900.00 10) EAR, Riverside ............... ............................... 1,305,700.00 11) GRFCO, Moreno Valley . ............................... 1,385,700.00 12) GCI Construction, Inc., Costa Mesa .............. 1,439,850.00 13) Kana Pipeline, Inc., Placentia ........................ 1,787,000.00 The Sewer Maintenance crew provides information from their field observations of the sewer system to Engineering Design on a continuous basis. These locations have been requiring a higher than normal level of maintenance service for several reasons but generally it is due to offset joints, tree roots, broken sections, and /or being undersized. The project addresses the maintenance issues by replacing the structurally deficient existing 6" lines with 8" clay lines and reconnecting the service laterals. Approximately 5,000 linear feet of sewer lines are being replaced with this project. The Engineer's estimate of construction cost is $770,500 and our project budget is $1,000,000. The low bid received is below the project's budget, so additional hot spots or critically deficient lines may be added to utilize the favorable bid prices received. ITEM 2 02/11/14 C oPrinted on Recycled Paper The proposed sewer replacement is categorically exempt from the provisions of the California Environmental Quality Act (CEQA) under CEQA guidelines Section 15301 "Existing Facilities" Class 1 (b). The Notice of Exemption has been filed with the County Recorder's Office. Construction is scheduled to begin in March 2014 and is expected to be completed within ninety (90) calendar days. 8. ATTACHMENTS • Location Map • Bid Abstract JD;rn;ly NAPublic Works\ADMIN\ADMIN\LYoung \Council Items \COUNCIL \Feb - 2014\2 -11 \S -235 Sewer Line Replacement at Various Locatons_AWARD.doc ITEM 3 02/11/14 C Printed on Recycled Paper